Bid tab 100445

Let Aug 19, 2010 · Division 8 · Nowata Sign up free

‹ Aug 2010 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-9): OVER CALIFORNIA CREEK , 5.4 MILES WEST OF THE US-169/SH-10 JUNCTION. PROJECT LENGTH = 0.214 MILES

Let date
Thursday, August 19, 2010
Contract
100445
J/P numbers
23421(04)
District
Division 8
County
Nowata
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-9): OVER CALIFORNIA CREEK , 5.4 MILES WEST OF THE US-169/SH-10 JUNCTION. PROJECT LENGTH = 0.214 MILES
Project number
ACBRO-153D(144)CI

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$524,427
1 BELK BRIDGE, INC. Low bidder $423,972 -19.2%
2 K & R BUILDERS, INC. $466,727 -11.0% +10.1%
3 BEACHNER CONSTRUCTION CO., INC. $495,822 -5.5% +16.9%
4 Reece Construction Co, Inc. $521,915 -0.5% +23.1%
5 MANHATTAN ROAD & BRIDGE COMPANY, LLC $537,079 +2.4% +26.7%

Bid tab: unit prices 38 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BELK BRIDGE, IN…#2 K & R BUILDERS,…#3 BEACHNER CONSTR…#4 Reece Construct…#5 MANHATTAN ROAD …
1201 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $6,000.00 $10,000.00 $5,000.00 $2,000.00 $10,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION4,568CY $6.00 $4.00 $5.50 $4.00 $6.32 $6.00
3202(C) 0184 UNCLASSIFIED BORROW1,123CY $8.00 $6.00 $7.00 $5.00 $12.22 $7.00
4205 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $2,500.00 $4,600.00 $3,000.00 $2,500.00 $7,500.00
5223 2801 TEMPORARY SILT FENCE2,138LF $2.50 $1.20 $1.80 $1.20 $1.20 $1.25
6227 0100 TEMPORARY SILT DIKE204LF $8.50 $3.00 $9.50 $6.50 $6.50 $6.75
7230(A) 2806 SOLID SLAB SODDING13,355SY $2.50 $1.45 $1.80 $1.45 $1.45 $1.50
8233(A) 2817 VEGETATIVE MULCHING2.17AC $750.00 $375.00 $200.00 $375.00 $375.00 $400.00
9403(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E1,020TON $25.00 $17.20 $21.00 $18.00 $19.85 $20.00
10509(D) 0325 CLASS C CONCRETE10CY $250.00 $100.00 $275.00 $350.00 $362.00 $500.00
11601(A-1)1353 TYPE I-A PLAIN RIPRAP70TON $30.00 $23.28 $32.50 $31.00 $30.35 $25.00
12613(CC) 7186 TYPE A4 CULVERT END TREATMENT4EA $600.00 $900.00 $102.00 $800.00 $1,481.00 $850.00
13613(D) 0689 18" CORR. GALV. STEEL PIPE130LF $35.00 $23.00 $26.00 $20.00 $16.72 $22.50
14613(M) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $550.00 $200.00 $102.00 $300.00 $339.80 $250.00
15501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON84CY $15.00 $15.00 $9.00 $27.00 $17.00 $20.00
16501(G) 6309 CLSM BACKFILL82CY $120.00 $75.00 $130.00 $100.00 $113.00 $125.00
17503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)397LF $180.00 $185.00 $178.00 $265.00 $205.00 $200.00
18504(A) 1304 APPROACH SLAB82SY $160.00 $75.00 $164.00 $165.00 $148.00 $160.00
19504(E) 6239 CONCRETE RAIL (TR3)269LF $60.00 $80.00 $59.50 $55.00 $97.00 $60.00
20506(A) 1322 STRUCTURAL STEEL1,810LB $2.50 $4.00 $3.00 $3.25 $4.00 $2.50
21509(A) 1326 CLASS AA CONCRETE77CY $450.00 $425.00 $440.00 $450.00 $656.00 $650.00
22509(B) 1328 CLASS A CONCRETE72CY $400.00 $425.00 $460.00 $450.00 $656.00 $700.00
23511(A) 1332 REINFORCING STEEL25,751LB $1.00 $1.00 $0.7200 $0.8300 $0.6000 $0.8500
24514(A) 6010 PILES, FURNISHED (HP 10X42)300LF $35.00 $16.00 $38.00 $30.00 $37.00 $35.00
25514(B) 6292 PILES, DRIVEN (HP 10X42)300LF $20.00 $8.00 $12.00 $20.00 $11.00 $15.00
26601(A-1)1353 TYPE I-A PLAIN RIPRAP2,603TON $30.00 $23.28 $26.50 $31.00 $27.15 $23.75
27601(A-2)1355 TYPE I-A FILTER BLANKET434TON $25.00 $19.00 $22.00 $31.00 $20.73 $20.00
28601(E) 6312 FILTER FABRIC (RIPRAP)1,735SY $3.00 $1.00 $2.90 $2.25 $1.22 $2.00
29613(P) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND54LF $25.00 $43.00 $20.00 $30.00 $34.00 $15.00
30613(Q) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.100LF $20.00 $10.00 $20.00 $30.00 $34.00 $15.00
31619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $10,000.00 $2,000.00 $4,500.00 $4,000.00 $2,500.00 $22,600.00
32623(A) 0932 BEAM GUARD RAIL-W-BEAM-SINGLE50LF $25.00 $20.00 $19.00 $17.00 $20.00 $21.00
33623(F) 5686 GUARD RAIL ANCHOR UNIT (TYPE D-BF)4EA $1,500.00 $1,800.00 $1,500.00 $1,300.00 $1,715.00 $1,800.00
34623(H) 8571 (SP)G.E.T. GUARD RAIL END SECTION4EA $2,500.00 $2,500.00 $2,275.00 $2,050.00 $2,600.00 $2,700.00
35880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $2,800.00 $3,000.00 $2,010.00 $2,010.00 $5,000.00
36642 0098 STAKING1LSUM $5,000.00 $9,000.00 $5,000.00 $7,700.00 $3,500.00 $7,500.00
37220 2800 (SP)SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,000.00 $3,750.00 $3,500.00 $1,250.00 $2,500.00
38641 1399 MOBILIZATION1LSUM $26,000.00 $20,000.00 $22,000.00 $22,000.00 $36,300.00 $30,000.00