| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$6,000.00 |
$10,000.00 |
$5,000.00 |
$2,000.00 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,568 | CY |
$6.00 |
$4.00 |
$5.50 |
$4.00 |
$6.32 |
$6.00 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 1,123 | CY |
$8.00 |
$6.00 |
$7.00 |
$5.00 |
$12.22 |
$7.00 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$2,500.00 |
$4,600.00 |
$3,000.00 |
$2,500.00 |
$7,500.00 |
| 5 | 223 2801 |
TEMPORARY SILT FENCE | 2,138 | LF |
$2.50 |
$1.20 |
$1.80 |
$1.20 |
$1.20 |
$1.25 |
| 6 | 227 0100 |
TEMPORARY SILT DIKE | 204 | LF |
$8.50 |
$3.00 |
$9.50 |
$6.50 |
$6.50 |
$6.75 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 13,355 | SY |
$2.50 |
$1.45 |
$1.80 |
$1.45 |
$1.45 |
$1.50 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.17 | AC |
$750.00 |
$375.00 |
$200.00 |
$375.00 |
$375.00 |
$400.00 |
| 9 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,020 | TON |
$25.00 |
$17.20 |
$21.00 |
$18.00 |
$19.85 |
$20.00 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$100.00 |
$275.00 |
$350.00 |
$362.00 |
$500.00 |
| 11 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 70 | TON |
$30.00 |
$23.28 |
$32.50 |
$31.00 |
$30.35 |
$25.00 |
| 12 | 613(CC) 7186 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$600.00 |
$900.00 |
$102.00 |
$800.00 |
$1,481.00 |
$850.00 |
| 13 | 613(D) 0689 |
18" CORR. GALV. STEEL PIPE | 130 | LF |
$35.00 |
$23.00 |
$26.00 |
$20.00 |
$16.72 |
$22.50 |
| 14 | 613(M) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$550.00 |
$200.00 |
$102.00 |
$300.00 |
$339.80 |
$250.00 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 84 | CY |
$15.00 |
$15.00 |
$9.00 |
$27.00 |
$17.00 |
$20.00 |
| 16 | 501(G) 6309 |
CLSM BACKFILL | 82 | CY |
$120.00 |
$75.00 |
$130.00 |
$100.00 |
$113.00 |
$125.00 |
| 17 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 397 | LF |
$180.00 |
$185.00 |
$178.00 |
$265.00 |
$205.00 |
$200.00 |
| 18 | 504(A) 1304 |
APPROACH SLAB | 82 | SY |
$160.00 |
$75.00 |
$164.00 |
$165.00 |
$148.00 |
$160.00 |
| 19 | 504(E) 6239 |
CONCRETE RAIL (TR3) | 269 | LF |
$60.00 |
$80.00 |
$59.50 |
$55.00 |
$97.00 |
$60.00 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 1,810 | LB |
$2.50 |
$4.00 |
$3.00 |
$3.25 |
$4.00 |
$2.50 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 77 | CY |
$450.00 |
$425.00 |
$440.00 |
$450.00 |
$656.00 |
$650.00 |
| 22 | 509(B) 1328 |
CLASS A CONCRETE | 72 | CY |
$400.00 |
$425.00 |
$460.00 |
$450.00 |
$656.00 |
$700.00 |
| 23 | 511(A) 1332 |
REINFORCING STEEL | 25,751 | LB |
$1.00 |
$1.00 |
$0.7200 |
$0.8300 |
$0.6000 |
$0.8500 |
| 24 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 300 | LF |
$35.00 |
$16.00 |
$38.00 |
$30.00 |
$37.00 |
$35.00 |
| 25 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 300 | LF |
$20.00 |
$8.00 |
$12.00 |
$20.00 |
$11.00 |
$15.00 |
| 26 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 2,603 | TON |
$30.00 |
$23.28 |
$26.50 |
$31.00 |
$27.15 |
$23.75 |
| 27 | 601(A-2)1355 |
TYPE I-A FILTER BLANKET | 434 | TON |
$25.00 |
$19.00 |
$22.00 |
$31.00 |
$20.73 |
$20.00 |
| 28 | 601(E) 6312 |
FILTER FABRIC (RIPRAP) | 1,735 | SY |
$3.00 |
$1.00 |
$2.90 |
$2.25 |
$1.22 |
$2.00 |
| 29 | 613(P) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 54 | LF |
$25.00 |
$43.00 |
$20.00 |
$30.00 |
$34.00 |
$15.00 |
| 30 | 613(Q) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$20.00 |
$10.00 |
$20.00 |
$30.00 |
$34.00 |
$15.00 |
| 31 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$2,000.00 |
$4,500.00 |
$4,000.00 |
$2,500.00 |
$22,600.00 |
| 32 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 50 | LF |
$25.00 |
$20.00 |
$19.00 |
$17.00 |
$20.00 |
$21.00 |
| 33 | 623(F) 5686 |
GUARD RAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,800.00 |
$1,500.00 |
$1,300.00 |
$1,715.00 |
$1,800.00 |
| 34 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 4 | EA |
$2,500.00 |
$2,500.00 |
$2,275.00 |
$2,050.00 |
$2,600.00 |
$2,700.00 |
| 35 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,800.00 |
$3,000.00 |
$2,010.00 |
$2,010.00 |
$5,000.00 |
| 36 | 642 0098 |
STAKING | 1 | LSUM |
$5,000.00 |
$9,000.00 |
$5,000.00 |
$7,700.00 |
$3,500.00 |
$7,500.00 |
| 37 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$3,750.00 |
$3,500.00 |
$1,250.00 |
$2,500.00 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$26,000.00 |
$20,000.00 |
$22,000.00 |
$22,000.00 |
$36,300.00 |
$30,000.00 |