| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$18,000.00 |
$66,435.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 34,357 | CY |
$3.75 |
$9.00 |
$7.33 |
$8.00 |
| 3 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$11,389.00 |
$45,320.00 |
$35,000.00 |
| 4 | 223 2801 |
TEMPORARY SILT FENCE | 3,400 | LF |
$3.00 |
$2.00 |
$1.70 |
$2.75 |
| 5 | 227 0100 |
TEMPORARY SILT DIKE | 1,200 | LF |
$9.00 |
$7.95 |
$7.21 |
$7.75 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 51,090 | SY |
$2.00 |
$1.42 |
$1.55 |
$1.35 |
| 7 | 230(F) 2812 |
WATERING | 2,043.6 | MGAL |
$12.00 |
$8.74 |
$6.18 |
$8.25 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 10 | AC |
$1,000.00 |
$554.00 |
$875.50 |
$525.00 |
| 9 | 241 2832 |
MOWING | 10.7 | AC |
$75.00 |
$10.00 |
$41.20 |
$55.00 |
| 10 | 303 5912 |
AGGREGATE BASE | 16,147.3 | TON |
$32.00 |
$18.00 |
$17.20 |
$19.75 |
| 11 | 310(B) 0149 |
SUBGRADE, METHOD B | 27,688 | SY |
$3.50 |
$1.47 |
$2.64 |
$1.45 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 31,841.2 | SY |
$1.50 |
$0.8300 |
$1.30 |
$1.05 |
| 13 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 12,505.8 | TON |
$23.00 |
$17.77 |
$16.16 |
$19.00 |
| 14 | 408 5774 |
PRIME COAT | 12,242.7 | GAL |
$4.50 |
$1.00 |
$6.55 |
$2.65 |
| 15 | 411(S3) 5940 |
(SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) | 2,832.2 | TON |
$65.00 |
$68.00 |
$73.05 |
$76.40 |
| 16 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 7,241.9 | TON |
$62.00 |
$62.94 |
$66.18 |
$69.00 |
| 17 | 411(S4) 5955 |
(SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) | 2,265.8 | TON |
$69.00 |
$79.50 |
$79.57 |
$88.00 |
| 18 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 2,824.8 | TON |
$65.00 |
$65.50 |
$72.78 |
$73.00 |
| 19 | 413(A) 4861 |
RUMBLE STRIP-METHOD AC-CON | 14,215 | LF |
$0.5000 |
$0.4200 |
$0.5700 |
$0.4500 |
| 20 | 417 5267 |
COLD MILLING PAVEMENT | 9,937 | SY |
$1.50 |
$1.09 |
$3.73 |
$2.10 |
| 21 | 420(A) 4242 |
FABRIC REINFORCEMENT | 1,709 | SY |
$4.80 |
$5.08 |
$2.32 |
$7.00 |
| 22 | 420(B) 4268 |
BITUMINOUS BINDER | 427.3 | GAL |
$6.10 |
$4.40 |
$3.92 |
$8.50 |
| 23 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 57.5 | CY |
$25.00 |
$59.00 |
$12.36 |
$100.00 |
| 24 | 509(B) 0321 |
CLASS A CONCRETE | 103.1 | CY |
$450.00 |
$411.00 |
$375.95 |
$900.00 |
| 25 | 509(D) 0325 |
CLASS C CONCRETE | 194.3 | CY |
$250.00 |
$242.00 |
$216.30 |
$260.00 |
| 26 | 511(A) 0332 |
REINFORCING STEEL | 15,418.2 | LB |
$0.7800 |
$0.7700 |
$0.9300 |
$1.05 |
| 27 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 81.4 | TON |
$50.00 |
$55.07 |
$41.20 |
$30.00 |
| 28 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 181.5 | SY |
$54.50 |
$35.73 |
$41.20 |
$60.00 |
| 29 | 613(B) 0491 |
18" R.C.PIPE CLASS III | 122 | LF |
$45.00 |
$49.96 |
$59.61 |
$31.00 |
| 30 | 613(B) 4410 |
28 1/2" X 18" R.C.PIPE ARCH CLASS A-III | 54 | LF |
$80.00 |
$74.00 |
$56.81 |
$80.00 |
| 31 | 613(B) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 62 | LF |
$179.80 |
$111.00 |
$129.68 |
$110.00 |
| 32 | 613(CC) 7196 |
TYPE A6 CULVERT END TREATMENT | 22 | EA |
$1,130.20 |
$850.00 |
$978.50 |
$1,050.00 |
| 33 | 613(CC) 7197 |
TYPE B6 CULVERT END TREATMENT | 12 | EA |
$1,200.00 |
$1,100.00 |
$1,030.00 |
$1,350.00 |
| 34 | 613(CC) 7198 |
TYPE C6 CULVERT END TREATMENT | 2 | EA |
$1,339.50 |
$1,320.00 |
$1,854.00 |
$2,200.00 |
| 35 | 613(D) 0689 |
18" CORR. GALV. STEEL PIPE | 126 | LF |
$30.00 |
$35.50 |
$23.45 |
$26.00 |
| 36 | 613(D) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 394 | LF |
$28.60 |
$27.91 |
$21.98 |
$27.50 |
| 37 | 613(D) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 68 | LF |
$40.30 |
$31.81 |
$24.91 |
$35.00 |
| 38 | 613(D) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 281 | LF |
$42.00 |
$36.32 |
$33.45 |
$40.00 |
| 39 | 613(P) 1091 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 3,000 | LF |
$10.00 |
$4.64 |
$4.07 |
$4.75 |
| 40 | 613(Q) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 200 | LF |
$12.00 |
$8.97 |
$4.07 |
$4.75 |
| 41 | 613(R) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 948.1 | CY |
$39.00 |
$40.00 |
$15.45 |
$32.00 |
| 42 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$38,550.00 |
$4,087.04 |
$30,000.00 |
| 43 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 192 | SY |
$12.00 |
$11.00 |
$2.46 |
$15.00 |
| 44 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,857 | SY |
$3.00 |
$2.13 |
$2.36 |
$3.25 |
| 45 | 619(B) 4780 |
REMOVAL OF GUARD RAIL | 676 | LF |
$2.80 |
$5.47 |
$3.09 |
$2.25 |
| 46 | 619(C) 0924 |
SAWING PAVEMENT | 19,850 | LF |
$3.00 |
$2.50 |
$5.15 |
$3.25 |
| 47 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 975 | LF |
$16.30 |
$17.88 |
$16.64 |
$17.00 |
| 48 | 623(E) 7114 |
THRIE BEAM BRIDGE CONNECTION-TYPE A | 4 | EA |
$2,300.00 |
$1,900.00 |
$1,308.10 |
$1,500.00 |
| 49 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 4 | EA |
$3,000.00 |
$2,400.00 |
$2,085.75 |
$2,250.00 |
| 50 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 6 | EA |
$80.00 |
$55.00 |
$51.50 |
$55.00 |
| 51 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 1 | EA |
$172.60 |
$77.00 |
$72.10 |
$100.00 |
| 52 | 629(C) 4960 |
MAILBOX | 8 | EA |
$60.00 |
$21.00 |
$20.60 |
$25.00 |
| 53 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 7 | EA |
$25.00 |
$50.00 |
$10.30 |
$25.00 |
| 54 | 653(A) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 350 | LF |
$8.30 |
$11.06 |
$10.30 |
$7.00 |
| 55 | 653(B) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 15 | LF |
$11.30 |
$37.39 |
$20.60 |
$7.00 |
| 56 | 653(C) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$646.80 |
$715.00 |
$721.00 |
$500.00 |
| 57 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 422 | CY |
$25.00 |
$22.00 |
$12.60 |
$20.00 |
| 58 | 501(G) 6309 |
CLSM BACKFILL | 182 | CY |
$141.10 |
$137.00 |
$119.70 |
$125.00 |
| 59 | 504(A) 1304 |
APPROACH SLAB | 286.6 | SY |
$150.00 |
$154.00 |
$194.25 |
$145.00 |
| 60 | 504(C) 6250 |
SEALED EXPANSION JOINT | 89.7 | LF |
$251.30 |
$247.00 |
$258.30 |
$245.00 |
| 61 | 504(E) 6245 |
CONCRETE RAIL (TR4) | 585 | LF |
$60.00 |
$66.00 |
$71.40 |
$60.00 |
| 62 | 506(A) 1322 |
STRUCTURAL STEEL | 96,180 | LB |
$1.90 |
$1.85 |
$1.76 |
$1.75 |
| 63 | 509(A) 1326 |
CLASS AA CONCRETE | 278.7 | CY |
$420.00 |
$522.50 |
$462.00 |
$500.00 |
| 64 | 509(B) 1328 |
CLASS A CONCRETE | 216.2 | CY |
$420.00 |
$687.00 |
$577.50 |
$650.00 |
| 65 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 100,020 | LB |
$0.8500 |
$0.9400 |
$0.9500 |
$0.8500 |
| 66 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$5,000.00 |
$22,000.00 |
$33,867.75 |
$20,000.00 |
| 67 | 512(B) 6303 |
COLLECTION & HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$2,750.00 |
$8,211.00 |
$2,500.00 |
| 68 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 848 | SY |
$3.60 |
$3.95 |
$3.15 |
$3.50 |
| 69 | 516(A) 6090 |
DRILLED SHAFTS 24" DIAMETER | 110 | LF |
$290.00 |
$330.00 |
$202.24 |
$400.00 |
| 70 | 516(A) 6092 |
DRILLED SHAFTS 36" DIAMETER | 140 | LF |
$450.00 |
$440.00 |
$294.80 |
$500.00 |
| 71 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 189 | LF |
$510.00 |
$550.00 |
$395.16 |
$600.00 |
| 72 | 520(A) 6058 |
PREPARATION OF CRACKS ABOVE WATER | 50 | LF |
$31.00 |
$110.00 |
$71.40 |
$100.00 |
| 73 | 520(C) 6060 |
EPOXY RESIN ABOVE WATER | 10 | GAL |
$101.30 |
$165.00 |
$89.25 |
$150.00 |
| 74 | 523(A) 6550 |
(SP) SEALER CRACK PREPARATION | 507.5 | LF |
$4.20 |
$5.50 |
$4.20 |
$5.00 |
| 75 | 523(B) 6560 |
(SP) SEALER RESIN | 14 | GAL |
$183.30 |
$137.00 |
$157.50 |
$125.00 |
| 76 | 535 6164 |
(PL)FIXED BEARING ASSEMBLY | 2 | EA |
$783.70 |
$1,925.00 |
$1,890.00 |
$1,750.00 |
| 77 | 535 6165 |
(PL)EXPANSION BEARING ASSEMBLY | 8 | EA |
$951.40 |
$1,900.00 |
$1,890.00 |
$1,750.00 |
| 78 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 700 | TON |
$43.60 |
$31.90 |
$35.60 |
$25.00 |
| 79 | 601(A-2)1355 |
TYPE I-A FILTER BLANKET | 114 | TON |
$36.50 |
$27.00 |
$27.30 |
$23.00 |
| 80 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$40,000.00 |
$95,000.00 |
$96,583.20 |
$152,000.00 |
| 81 | 627(G) 4316 |
RELOCATION OF PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 3,830 | LF |
$4.60 |
$4.49 |
$4.20 |
$2.25 |
| 82 | 627(H) 5856 |
DELIVER PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 1,120 | LF |
$23.00 |
$15.00 |
$18.90 |
$20.00 |
| 83 | 823 8478 |
(PL)PORTABLE TRAFFIC SIGNAL SYSTEM | 300 | SD |
$130.20 |
$55.00 |
$52.50 |
$55.00 |
| 84 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 115.7 | SF |
$14.00 |
$13.00 |
$12.60 |
$12.75 |
| 85 | 851(C) 8324 |
2" SQUARE TUBE POST | 77 | LF |
$10.00 |
$7.50 |
$7.35 |
$7.50 |
| 86 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 88 | LF |
$8.50 |
$6.60 |
$6.30 |
$6.35 |
| 87 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 4 | EA |
$30.00 |
$19.80 |
$18.90 |
$25.00 |
| 88 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 23,100 | LF |
$0.5000 |
$0.5800 |
$0.5800 |
$0.6000 |
| 89 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 520 | LF |
$0.8000 |
$2.20 |
$2.10 |
$2.15 |
| 90 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 2 | EA |
$125.00 |
$93.50 |
$89.25 |
$100.00 |
| 91 | 855(B) 8821 |
TRAFFIC STRIPE(PLASTIC)(WORDS) | 1 | EA |
$150.00 |
$203.00 |
$194.25 |
$250.00 |
| 92 | 856(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 13,000 | LF |
$0.3000 |
$0.2800 |
$0.2600 |
$0.2700 |
| 93 | 856(G) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 11,100 | EA |
$0.4000 |
$0.5000 |
$0.5300 |
$0.5300 |
| 94 | 859(A) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 9,000 | LF |
$0.5000 |
$0.5500 |
$0.5300 |
$0.5300 |
| 95 | 871 8709 |
(PL)CONSTRUCTION ZONE QUADGUARD IMPACT ATTENUATOR | 316 | SD |
$29.00 |
$5.50 |
$5.25 |
$5.50 |
| 96 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,196 | SD |
$0.3000 |
$2.20 |
$2.10 |
$2.15 |
| 97 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,342 | SD |
$0.3000 |
$2.10 |
$2.10 |
$2.15 |
| 98 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,870 | SD |
$3.00 |
$2.20 |
$2.10 |
$2.15 |
| 99 | 880(C) 8836 |
BARRICADES(TYPE II) | 496 | SD |
$0.2000 |
$0.2800 |
$0.2600 |
$0.3000 |
| 100 | 880(C) 8842 |
BARRICADES(TYPE III) | 11,736 | SD |
$0.4000 |
$0.2800 |
$0.2600 |
$0.2600 |
| 101 | 880(C) 8848 |
WING BARRICADES | 1,668 | SD |
$0.5000 |
$0.1100 |
$0.1100 |
$0.1500 |
| 102 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 32,182 | SD |
$0.1000 |
$0.0600 |
$0.0500 |
$0.0500 |
| 103 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 47,630 | SD |
$0.1000 |
$0.0600 |
$0.0500 |
$0.0500 |
| 104 | 880(F) 8878 |
DRUMS | 47,630 | SD |
$0.1000 |
$0.0500 |
$0.0500 |
$0.0500 |
| 105 | 642 0098 |
STAKING | 1 | LSUM |
$72,650.00 |
$28,000.00 |
$21,892.50 |
$40,000.00 |
| 106 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,259.30 |
$1,500.00 |
$5,260.50 |
$5,000.00 |
| 107 | 640 1426 |
FIELD OFFICE | 1 | EA |
$9,182.90 |
$6,500.00 |
$7,350.00 |
$20,000.00 |
| 108 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$158,500.00 |
$175,000.00 |
$106,398.95 |
$135,000.00 |