| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$2,000.00 |
$6,000.00 |
$13,910.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 9,223 | CY |
$6.00 |
$3.50 |
$3.50 |
$4.28 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 2,630 | CY |
$6.00 |
$5.00 |
$4.75 |
$8.03 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$2,000.00 |
$4,000.00 |
$8,560.00 |
| 5 | 223 2801 |
TEMPORARY SILT FENCE | 3,460 | LF |
$2.50 |
$0.7500 |
$1.00 |
$1.07 |
| 6 | 227 0100 |
TEMPORARY SILT DIKE | 303 | LF |
$5.00 |
$1.00 |
$4.40 |
$4.71 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 10,304 | SY |
$2.00 |
$1.45 |
$1.50 |
$1.61 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 4 | AC |
$500.00 |
$100.00 |
$100.00 |
$107.00 |
| 9 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,709 | TON |
$21.00 |
$16.05 |
$16.00 |
$20.34 |
| 10 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 98 | CY |
$15.00 |
$40.00 |
$33.00 |
$12.84 |
| 11 | 509(B) 0321 |
CLASS A CONCRETE | 116 | CY |
$450.00 |
$300.00 |
$440.00 |
$369.15 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$100.00 |
$350.00 |
$374.50 |
| 13 | 511(A) 0332 |
REINFORCING STEEL | 18,489 | LB |
$1.00 |
$1.50 |
$1.50 |
$0.8600 |
| 14 | 613(B) 0492 |
24" R.C.PIPE CLASS III | 100 | LF |
$75.00 |
$60.00 |
$45.00 |
$59.77 |
| 15 | 613(B) 0493 |
30" R.C.PIPE CLASS III | 28 | LF |
$90.00 |
$70.00 |
$67.00 |
$76.27 |
| 16 | 613(B) 0494 |
36" R.C.PIPE CLASS III | 42 | LF |
$110.00 |
$80.00 |
$95.00 |
$97.03 |
| 17 | 613(M) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$550.00 |
$750.00 |
$725.00 |
$742.34 |
| 18 | 613(M) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$825.00 |
$825.00 |
$825.00 |
$901.48 |
| 19 | 613(M) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$950.00 |
$1,000.00 |
$1,197.87 |
| 20 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 2 | EA |
$2,500.00 |
$2,150.00 |
$1,900.00 |
$2,380.75 |
| 21 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 28 | SF |
$30.00 |
$24.00 |
$14.00 |
$14.98 |
| 22 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 40 | LF |
$8.00 |
$24.00 |
$8.00 |
$8.56 |
| 23 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$4,500.00 |
$3,750.00 |
$4,012.50 |
| 24 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$18.00 |
$15.00 |
$25.00 |
$10.70 |
| 25 | 501(G) 6309 |
CLSM BACKFILL | 102 | CY |
$125.00 |
$72.00 |
$90.00 |
$110.21 |
| 26 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,030 | LF |
$180.00 |
$170.00 |
$175.00 |
$184.04 |
| 27 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$170.00 |
$85.00 |
$170.00 |
$144.45 |
| 28 | 504(C) 6250 |
SEALED EXPANSION JOINT | 33 | LF |
$175.00 |
$150.00 |
$190.00 |
$190.46 |
| 29 | 504(E) 6239 |
CONCRETE RAIL (TR3) | 585 | LF |
$60.00 |
$70.00 |
$45.00 |
$69.55 |
| 30 | 506(A) 1322 |
STRUCTURAL STEEL | 5,120 | LB |
$3.75 |
$3.00 |
$3.00 |
$3.21 |
| 31 | 509(A) 1326 |
CLASS AA CONCRETE | 264 | CY |
$420.00 |
$350.00 |
$360.00 |
$417.30 |
| 32 | 509(B) 1328 |
CLASS A CONCRETE | 117 | CY |
$400.00 |
$350.00 |
$360.00 |
$406.60 |
| 33 | 511(A) 1332 |
REINFORCING STEEL | 75,232 | LB |
$0.8000 |
$1.00 |
$0.7500 |
$0.8000 |
| 34 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 276 | LF |
$30.00 |
$16.00 |
$30.00 |
$32.64 |
| 35 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 276 | LF |
$20.00 |
$8.00 |
$18.00 |
$16.05 |
| 36 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 74 | LF |
$500.00 |
$700.00 |
$425.00 |
$493.27 |
| 37 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 5,292 | TON |
$28.00 |
$21.75 |
$21.00 |
$27.82 |
| 38 | 601(A-2)1355 |
TYPE I-A FILTER BLANKET | 1,578 | TON |
$25.00 |
$16.25 |
$20.00 |
$23.01 |
| 39 | 601(E) 6312 |
FILTER FABRIC (RIPRAP) | 6,001 | SY |
$2.00 |
$1.00 |
$2.00 |
$2.14 |
| 40 | 613(P) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 70 | LF |
$25.00 |
$35.00 |
$25.00 |
$19.26 |
| 41 | 613(Q) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 20 | LF |
$20.00 |
$20.00 |
$25.00 |
$12.84 |
| 42 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$3,000.00 |
$3,745.00 |
| 43 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 192 | LF |
$25.00 |
$20.00 |
$18.00 |
$19.26 |
| 44 | 623(F) 5686 |
GUARD RAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,500.00 |
$1,250.00 |
$1,337.50 |
| 45 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 4 | EA |
$2,500.00 |
$2,150.00 |
$2,225.00 |
$2,380.75 |
| 46 | 642 0098 |
STAKING | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$18,000.00 |
$12,438.75 |
| 47 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,300.00 |
$1,000.00 |
$3,000.00 |
$2,675.00 |
| 48 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$35,000.00 |
$4,000.00 |
$28,000.00 |
$41,074.78 |