IDOT Jobs

All dates · 31 jobs · — Sign up free
★ My Jobs

Filtered by: County: Scott Clear all

31 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Apr 27, 2018 72K41 ScottDistrict 6 Drainage repairs on I-72 0.6 miles west of the Morgan/Scott county line. — Executed Nov 26 New Stutz Excavating, Inc. $41,781 ·
Apr 27, 2018 72K50 PikeScottDistrict 6 Class D and partial depth HMA patching on I-72 from east of Hull to west of Barry in Pike County, and from east of the Illinois River Bridges to IL 100 in Scott County. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $593,997 ·
Apr 26, 2019 72K78 ScottDistrict 6 Painting portions of two bridges on IL 100 and Hillview Road (SN 086-0016, 086-0039). — Rejected Nov 26 New Venus Painting Co. $182,900 ·
Apr 26, 2019 72L09 ScottDistrict 6 Deck patching and expansion joint repairs on four structures on I-72. (SN 086-0040, 0041, 0042, 0043) — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $195,843 ·
Jun 14, 2019 72L21 ScottDistrict 6 Patching on I-72 in Scott County. — Executed Nov 26 New Kinney Contractors, Inc. $184,672 ·
Nov 8, 2019 72K44 ScottDistrict 6 Bridge deck patching on main spans, hydroscarification and microsilica overlay on approach spans, minor polymer concrete repairs on joints, reseal silicone joints and install new floor drains on approach spans of the structures carrying IL 100/106 over the Illinois River at Florence. (SN 086-0001) — Executed Nov 26 New Freesen, a div of UCM, Inc. $828,566 ·
Apr 24, 2020 72L60 MorganScottDistrict 6 Culvert replacement on Old US 36 from east of the Scott / Morgan County line to east of Jacksonville. — Executed Nov 26 New Lee Hood d/b/a Hood Demolition & Excavation $114,850 ·
Jun 12, 2020 72L75 ScottDistrict 6 Deck patching and joint repair on SN 086-0013 carrying IL 106 over Little Sandy Creek, 1.5 miles north of Alsey. — Executed Nov 26 New Freesen, a div of UCM, Inc. $137,055 ·
Sep 18, 2020 72M37 ScottDistrict 6 Bridge superstructure repairs on SN 086-0037 and SN 086-0038 carrying I-72 over IL 100. — Executed Nov 26 New Halverson Construction Co., Inc. $53,431 ·
Sep 18, 2020 72M39 ScottDistrict 6 Patching on I-72 from the abandoned BandN Railroad to the Morgan County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $623,502 ·
Mar 5, 2021 72M51 ScottDistrict 6 Field tile removal and replacement on IL 106 west of Ehlert Lane. — Executed Nov 26 New K. E. Vas Company $53,069 ·
Jun 11, 2021 72823 ScottDistrict 6 5.5 miles of patching, resurfacing, ramp improvements and bridge repairs on I-72 from west of IL 100 to 0.5 miles west of Old US 36 and on IL 100 from 0.5 miles north of I-72 to 0.3 miles south of I-72. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $13,040,258 ·
Jul 30, 2021 72M99 ScottDistrict 6 Lot improvements at the Riggston Maintenance Yard. — Executed Nov 26 New K. E. Vas Company $87,086 ·
Sep 17, 2021 72D40 ScottDistrict 6 Removing existing box culvert and replacing with 8' x 4' box culvert on Old US 36, 1.7 miles northeast of I-72, west of Riggston. — Executed Nov 26 New Kinney Contractors, Inc. $339,921 ·
Nov 5, 2021 72M94 ScottDistrict 6 Deck patching on SN 086-0501 and 086-0502 on IL 106 near Alsey. — Executed Nov 26 New Freesen, a div of UCM, Inc. $139,283 ·
Jan 21, 2022 72M65 ScottDistrict 6 Bridge joint repair and replacement with a microsilica deck overlay on IL 100 over Wolf Creek, 1 mile south of Norfolk Southern in Bluffs; Microsilica deck overlay on IL 100 over Eagle Run Creek, 1.4 miles south of the Morgan County line. (SN 086-0006 and 086-0046) — Executed Nov 26 New Freesen, a div of UCM, Inc. $691,200 ·
Jun 17, 2022 72N41 ScottDistrict 6 Bridge deck patching on SN 086-0500 carrying IL 100 over Mauvaise Terre Creek, 1.8 miles north of I-72. — Executed Nov 26 New Freesen, a div of UCM, Inc. $130,203 ·
Jun 17, 2022 93787 ScottDistrict 6 Full-depth pavement reclamation with bituminous surface treatment on Winchester-Glasgow Road from jIL 106 to Van Meter Lane, and on Hoots Road from Bloomfield Road to IL 106. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $1,341,234 ·
Nov 18, 2022 93796 ScottDistrict 6 Replace the bridge carrying CH 12 over Mauvaise Terre Creek, 1.5 miles east of Exeter. — Executed Nov 26 New County Contractors, Inc. $2,196,562 ·
Jan 20, 2023 72L78 ScottDistrict 6 Slope stabilization on IL 106 east of Hillview Blacktop. — Executed Nov 26 New White Construction LLC $2,476,190 ·
Mar 10, 2023 72136 ScottDistrict 6 Bridge deck microsilica overlay on 4 structures on I-72 east of the Illinois River (SN 086-0040, 086-0041, 086-0042 and 086-0043). — Rejected Nov 26 New Freesen, a div of UCM, Inc. $2,757,903 ·
Mar 8, 2024 72724 ScottDistrict 6 Surface removal and standard overlay on Hillview Blacktop from just south of IL 106 to 0.6 miles south of IL 106. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $363,820 ·
Jan 17, 2025 93825 ScottDistrict 6 Oil and Chip Resurfacing with aggregate base on Winchester-Glasgow Road. Work includes Aggregate shoulders, pipe culvert replacement and ditch improvements. — Executed Nov 25 New K. E. Vas Company $369,091 ·
Mar 7, 2025 72608 ScottDistrict 6 Bridge deck patching, joint repairs, and approach repairs on SN 086-0016 and SN 086-0019 carrying Hillview Road over Sandy Creek and Little Sandy Creek in southern Scott County. — Executed Nov 25 New Freesen, a div of UCM, Inc. $383,898 ·
Jun 13, 2025 72A58 MorganScottDistrict 6 6.7 miles of resurfacing, patching and bridge repair on I-72 from 1.5 miles east of Old US 36 to 0.7 miles west of US 67. (SN 086-0023, 086-0024, 086-0028, 069-0053 and 069-0054) — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $25,768,294 ·
Sep 19, 2025 72324 ScottDistrict 6 Bridge deck overlay on SN 086-0029 carrying CH 14 (800E Hoots Road) over I-72, 0.9 miles east of Plum Creek. — Executed Nov 25 New Freesen, a div of UCM, Inc. $544,972 ·
Jan 16, 2026 72464 ScottDistrict 6 3.9 miles of resurfacing on IL 106 from west of Hillview Blacktop to Old US 36 and on Old US 36 from IL 106 to north of Commercial Street in Winchester. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $2,868,473 ·
Jan 16, 2026 72A25 PikeScottDistrict 6 Painting portions of four bridges on I-72. (SN 075-0083, 075-0112, 086-0037 and 086-0038) — Executed Nov 25 New Three Star Painting, Inc. $559,150 ·
Jan 16, 2026 72D12 PikeScottDistrict 6 1.4 miles of tree removal for the new Illinois River Bridge in Florence. — Rejected Nov 25 New
Jun 12, 2026 93857 ScottDistrict 6 Full-depth reclamation with soil cement base, surface profiling and bituminous surface treatment on CH 14 from north of Walnut Creek to I-72 in Scott County. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $1,074,717 ·
Jul 31, 2026 72E85 ScottDistrict 6 Resurfacing on US 67 at the median crossover 0.2 miles north of the Greene County line. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $105,717 ·
1–31 of 31

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.