Filtered by: County: Scott Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 27, 2018 | 72K41 | ScottDistrict 6 | Drainage repairs on I-72 0.6 miles west of the Morgan/Scott county line. | — | Executed | Stutz Excavating, Inc. $41,781 · | ||
| Apr 27, 2018 | 72K50 | PikeScottDistrict 6 | Class D and partial depth HMA patching on I-72 from east of Hull to west of Barry in Pike County, and from east of the Illinois River Bridges to IL 100 in Scott County. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $593,997 · | ||
| Apr 26, 2019 | 72K78 | ScottDistrict 6 | Painting portions of two bridges on IL 100 and Hillview Road (SN 086-0016, 086-0039). | — | Rejected | Venus Painting Co. $182,900 · | ||
| Apr 26, 2019 | 72L09 | ScottDistrict 6 | Deck patching and expansion joint repairs on four structures on I-72. (SN 086-0040, 0041, 0042, 0043) | — | Executed | ERA-Valdivia Contractors, Inc. $195,843 · | ||
| Jun 14, 2019 | 72L21 | ScottDistrict 6 | Patching on I-72 in Scott County. | — | Executed | Kinney Contractors, Inc. $184,672 · | ||
| Nov 8, 2019 | 72K44 | ScottDistrict 6 | Bridge deck patching on main spans, hydroscarification and microsilica overlay on approach spans, minor polymer concrete repairs on joints, reseal silicone joints and install new floor drains on approach spans of the structures carrying IL 100/106 over the Illinois River at Florence. (SN 086-0001) | — | Executed | Freesen, a div of UCM, Inc. $828,566 · | ||
| Apr 24, 2020 | 72L60 | MorganScottDistrict 6 | Culvert replacement on Old US 36 from east of the Scott / Morgan County line to east of Jacksonville. | — | Executed | Lee Hood d/b/a Hood Demolition & Excavation $114,850 · | ||
| Jun 12, 2020 | 72L75 | ScottDistrict 6 | Deck patching and joint repair on SN 086-0013 carrying IL 106 over Little Sandy Creek, 1.5 miles north of Alsey. | — | Executed | Freesen, a div of UCM, Inc. $137,055 · | ||
| Sep 18, 2020 | 72M37 | ScottDistrict 6 | Bridge superstructure repairs on SN 086-0037 and SN 086-0038 carrying I-72 over IL 100. | — | Executed | Halverson Construction Co., Inc. $53,431 · | ||
| Sep 18, 2020 | 72M39 | ScottDistrict 6 | Patching on I-72 from the abandoned BandN Railroad to the Morgan County line. | — | Executed | G. M. Sipes Construction, Inc. $623,502 · | ||
| Mar 5, 2021 | 72M51 | ScottDistrict 6 | Field tile removal and replacement on IL 106 west of Ehlert Lane. | — | Executed | K. E. Vas Company $53,069 · | ||
| Jun 11, 2021 | 72823 | ScottDistrict 6 | 5.5 miles of patching, resurfacing, ramp improvements and bridge repairs on I-72 from west of IL 100 to 0.5 miles west of Old US 36 and on IL 100 from 0.5 miles north of I-72 to 0.3 miles south of I-72. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $13,040,258 · | ||
| Jul 30, 2021 | 72M99 | ScottDistrict 6 | Lot improvements at the Riggston Maintenance Yard. | — | Executed | K. E. Vas Company $87,086 · | ||
| Sep 17, 2021 | 72D40 | ScottDistrict 6 | Removing existing box culvert and replacing with 8' x 4' box culvert on Old US 36, 1.7 miles northeast of I-72, west of Riggston. | — | Executed | Kinney Contractors, Inc. $339,921 · | ||
| Nov 5, 2021 | 72M94 | ScottDistrict 6 | Deck patching on SN 086-0501 and 086-0502 on IL 106 near Alsey. | — | Executed | Freesen, a div of UCM, Inc. $139,283 · | ||
| Jan 21, 2022 | 72M65 | ScottDistrict 6 | Bridge joint repair and replacement with a microsilica deck overlay on IL 100 over Wolf Creek, 1 mile south of Norfolk Southern in Bluffs; Microsilica deck overlay on IL 100 over Eagle Run Creek, 1.4 miles south of the Morgan County line. (SN 086-0006 and 086-0046) | — | Executed | Freesen, a div of UCM, Inc. $691,200 · | ||
| Jun 17, 2022 | 72N41 | ScottDistrict 6 | Bridge deck patching on SN 086-0500 carrying IL 100 over Mauvaise Terre Creek, 1.8 miles north of I-72. | — | Executed | Freesen, a div of UCM, Inc. $130,203 · | ||
| Jun 17, 2022 | 93787 | ScottDistrict 6 | Full-depth pavement reclamation with bituminous surface treatment on Winchester-Glasgow Road from jIL 106 to Van Meter Lane, and on Hoots Road from Bloomfield Road to IL 106. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,341,234 · | ||
| Nov 18, 2022 | 93796 | ScottDistrict 6 | Replace the bridge carrying CH 12 over Mauvaise Terre Creek, 1.5 miles east of Exeter. | — | Executed | County Contractors, Inc. $2,196,562 · | ||
| Jan 20, 2023 | 72L78 | ScottDistrict 6 | Slope stabilization on IL 106 east of Hillview Blacktop. | — | Executed | White Construction LLC $2,476,190 · | ||
| Mar 10, 2023 | 72136 | ScottDistrict 6 | Bridge deck microsilica overlay on 4 structures on I-72 east of the Illinois River (SN 086-0040, 086-0041, 086-0042 and 086-0043). | — | Rejected | Freesen, a div of UCM, Inc. $2,757,903 · | ||
| Mar 8, 2024 | 72724 | ScottDistrict 6 | Surface removal and standard overlay on Hillview Blacktop from just south of IL 106 to 0.6 miles south of IL 106. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $363,820 · | ||
| Jan 17, 2025 | 93825 | ScottDistrict 6 | Oil and Chip Resurfacing with aggregate base on Winchester-Glasgow Road. Work includes Aggregate shoulders, pipe culvert replacement and ditch improvements. | — | Executed | K. E. Vas Company $369,091 · | ||
| Mar 7, 2025 | 72608 | ScottDistrict 6 | Bridge deck patching, joint repairs, and approach repairs on SN 086-0016 and SN 086-0019 carrying Hillview Road over Sandy Creek and Little Sandy Creek in southern Scott County. | — | Executed | Freesen, a div of UCM, Inc. $383,898 · | ||
| Jun 13, 2025 | 72A58 | MorganScottDistrict 6 | 6.7 miles of resurfacing, patching and bridge repair on I-72 from 1.5 miles east of Old US 36 to 0.7 miles west of US 67. (SN 086-0023, 086-0024, 086-0028, 069-0053 and 069-0054) | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $25,768,294 · | ||
| Sep 19, 2025 | 72324 | ScottDistrict 6 | Bridge deck overlay on SN 086-0029 carrying CH 14 (800E Hoots Road) over I-72, 0.9 miles east of Plum Creek. | — | Executed | Freesen, a div of UCM, Inc. $544,972 · | ||
| Jan 16, 2026 | 72464 | ScottDistrict 6 | 3.9 miles of resurfacing on IL 106 from west of Hillview Blacktop to Old US 36 and on Old US 36 from IL 106 to north of Commercial Street in Winchester. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,868,473 · | ||
| Jan 16, 2026 | 72A25 | PikeScottDistrict 6 | Painting portions of four bridges on I-72. (SN 075-0083, 075-0112, 086-0037 and 086-0038) | — | Executed | Three Star Painting, Inc. $559,150 · | ||
| Jan 16, 2026 | 72D12 | PikeScottDistrict 6 | 1.4 miles of tree removal for the new Illinois River Bridge in Florence. | — | Rejected | |||
| Jun 12, 2026 | 93857 | ScottDistrict 6 | Full-depth reclamation with soil cement base, surface profiling and bituminous surface treatment on CH 14 from north of Walnut Creek to I-72 in Scott County. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,074,717 · | ||
| Jul 31, 2026 | 72E85 | ScottDistrict 6 | Resurfacing on US 67 at the median crossover 0.2 miles north of the Greene County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $105,717 · |
1–31 of 31
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.