| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 8, 2024 | 62B43 | McHenryDistrict 1 | (1.8-Mile) Intersection Reconstruction, corridor widening, along IL 47 at IL 176 (North and South Junctions) including the realignment of Pleasant Valley Road in the City of Crystal Lake, Village of Lakewood, Dorr Township, McHenry County. | — | Executed | Plote Construction, Inc. $50,387,362 · | ||
| Mar 8, 2024 | 62T59 | LakeMcHenryDistrict 1 | Hot-mix asphalt surface removal, pavement patching, hot-mix asphalt surface overlay, sidewalk removal and repl (6.1-Mile) SMART Overlay, ADA improvements: The work consists of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt surface overlay, sidewalk removal and replacement for curb ramps (ADA) improvements, pavement markings, raised reflective pavement markers and detector loops. The project is located on US 12/ IL 59 (Rand Rd) from State Park Road/ East Street to North of IL 120, within the Villages of Spring Grove, Fox Lake and Volo in Lake and McHenry Counties. | — | Executed | Builders Paving, LLC $6,630,000 · | ||
| Mar 8, 2024 | 62T60 | McHenryDistrict 1 | (6.67-Mile) SMART Resurfacing from IL 31 Tryon Grove Road) to W of State Park Rd and includes HMA milling and resurfacing, removal and replacement of combination concrete curb and gutter, pavement markings, guardrail removal and replacement, aggregate shoulder placement, and shoulder grading. The project is located in the City of Richmond, the Village of Spring Grove, and Unincorporated Areas of McHenry County. | — | Executed | Peter Baker & Son Co. $3,484,111 · | ||
| Mar 8, 2024 | 62T62 | McHenryDistrict 1 | (1.55-Mile) SMART Overlay, ADA Improvements, hot-mix asphalt surface removal, pavement patching, hot-mix asphalt surface overlay, sidewalk removal and replacement for curb ramps (ADA) pavement markings, raised reflective pavement markers and detector loops. The project is located on US 14 (Division Street) from Crowley Road to IL 173/ Diggins Road, within the City of Harvard in McHenry County. | — | Executed | Peter Baker & Son Co. $1,222,902 · | ||
| Mar 8, 2024 | 62T63 | McHenryDistrict 1 | (3,765-Ft) SMART Overlay, ADA Improvements: HMA removal / replacement, pavement patching, curb ramps (ADA) improvements, APS installation, detector loops, pavement markings. FAP 303: US 14 / IL 173 (Division St): from Brink St. to Diggins St. and IL 173 (Diggins St): Division St. to East of Garfield Rd. located in the City of Harvard in McHenry County. | — | Executed | Schroeder Asphalt Services, Inc. $1,159,167 · | ||
| Apr 26, 2024 | 61K35 | McHenryDistrict 1 | Roadway widening, reconstruction, resurfacing and triffic signals at the intersectionof Three Oaks Road and Lutter Drive/Sands Road in Crystal Lake. | — | Executed | Curran Contracting Company $2,591,532 · | ||
| Apr 26, 2024 | 61K42 | McHenryDistrict 1 | Traffic signal replacement on Virginia Road from Teckler Boulevard to James R. Rekow Road, and at the intersection of Pyott Road and James R. Rekow Road in Crystal Lake and Lake of the Hills. | — | Executed | H & H Electric Co. $1,455,916 · | ||
| Apr 26, 2024 | 62L16 | McHenryDistrict 1 | 7.3 miles of Standard Overlay, Milled Rumble Strips and drainage improvements on IL 173 in the Villages of Hebron and Alden. | — | Executed | Peter Baker & Son Co. $5,133,133 · | ||
| Apr 26, 2024 | 62M25 | LakeMcHenryDistrict 1 | (8.47-Mile) Standard Overlay, Milled Rumble Strips, Drainage Improvements on IL 173 (Kenosha St) from Greenwood Rd to Madison Ave. This project is in the Villages of Richmond, Spring Grove and in Unincorporated Hebron, Richmond and Burton Townships in McHenry and Lake Counties. | — | Executed | Payne & Dolan, Inc. $7,564,874 · | ||
| Apr 26, 2024 | 62T00 | McHenryDistrict 1 | (200-Ft) Bridge Preservation project including bridge deck overlay, bridge joint replace/repair of SN 056-0052 carrying US 14 (Division Street) over Rush Creek, 0.1-miles North of IL 23 located within the City of Harvard in McHenry County. | — | Executed | Martam Construction Incorporated $637,548 · | ||
| Jun 14, 2024 | 46649 | DuPageMcHenryDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of the work is on various State-maintained highways in McHenry and DuPage Counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $893,950 · | ||
| Jun 14, 2024 | 61K43 | McHenryDistrict 1 | HMA resurfacing, PCC sidewalks, curb and gutter, outdoor fireplace construction, shelter construction, landscaping at the downtown Cary Gateway Plaza on the northwest corner of Main Street and Spring Street. | — | Rejected | Sjostrom & Sons, Inc. $1,190,661 · | ||
| Jun 14, 2024 | 62V07 | McHenryDistrict 1 | (2.61-miles) Designed Overlay, HMA Shoulder Widening, and ADA improvements located on IL 176 (Terra Cotta Avenue) from Hickory Drive to Mistwood Lane within the City of Crystal Lake in McHenry County. | — | Executed | Builders Paving, LLC $2,978,841 · | ||
| Aug 2, 2024 | 61J93 | McHenryDistrict 1 | Pavement reconstruction, construction of a multi-use path, replace two bridges, curb and gutter, storm sewer, traffic signals, lighting and landscaping on Randall Road from Ackman Road to Acorn lane/Polaris Drive, located in the Village of Lake in the Hills, and the City of Crystal Lake. | — | Executed | Plote Construction Inc. and Dunnet Bay Construction Company JV $63,438,828 · | ||
| Aug 2, 2024 | 62R97 | KaneMcHenryDistrict 1 | Location 1: 7,089 Feet (1.34 Miles), SMART Overlay, Designed Overlay and ADA Improvements and is located on US 14 from 0.4 Mile SE of Cary/Algonquin Rd to SE of Spring Beach Way within the Village of Cary in McHenry County. Location 2: 1,148.44 Feet (0.22 Miles). Shoulder and Drainage repairs and is located on IL 31 north of Main St in within the Village of Carpentersville in Kane County. | — | Executed | Peter Baker & Son Co. $2,080,376 · | ||
| Aug 2, 2024 | 62T02 | McHenryDistrict 1 | This is a bridge repair project of (SN 056-0054); IL 47 over Slough Creek. Scope of work includes bridge deck scarification and overlay, joint repair, approach slab repair, structural repair of concrete and bridge painting. The project is located within unincorporated McHenry County. | — | Executed | Alliance Contractors, Inc. $612,399 · | ||
| Sep 20, 2024 | 61J71 | McHenryDistrict 1 | Construction of new sidewalk with ADA improvements, curb and Gutter, driveway reconstruction, storm sewers, pedestrian traffic signals, pavement markings, landscaping, and other work at various locations in Crystal Lake. | — | Executed | Alliance Contractors, Inc. $603,500 · | ||
| Sep 20, 2024 | 62T07 | McHenryDistrict 1 | This is a bridge repair project of SN 056-0038; IL 176 over Fox River. Scope of work includes bridge deck scarification and latex concrete overlay, joint repair, approach slab repair and structural repair of concrete abutments and piers. The project is located within unincorporated McHenry County. | — | Executed | Martam Construction Incorporated $961,567 · | ||
| Nov 8, 2024 | 61K76 | McHenryDistrict 1 | Replace the bridge carrying Flat Iron Road over Mokeler Creek, 0.4 mile south of IL 173. | — | Executed | Sjostrom & Sons, Inc. $1,739,696 · | ||
| Nov 8, 2024 | 61K80 | McHenryDistrict 1 | Construct a single-span PPC IL-Beam structure with concrete deck to carry White Oaks Road over West Branch of Piscasaw Creek. Includes full-depth HMA resurfacing, pavement markings and storm sewer. | — | Executed | Sjostrom & Sons, Inc. $1,503,245 · | ||
| Nov 8, 2024 | 62X14 | McHenryDistrict 1 | Advanced tree removal, selective clearing, as well as all incidental and collateral work necessary to complete The proposed project scope of work consists of advanced tree removal, selective clearing, as well as all incidental and collateral work necessary to complete the project as shown on the plans. This project is in the City of Crystal Lake, City of McHenry, Village of Prairie Grove and Nunda Township in McHenry County. | — | Executed | Mosley Construction 1, LLC $515,021 · | ||
| Jan 17, 2025 | 61K92 | McHenryDistrict 1 | Construct a single-cell, three-sided precast structure to carry Hunter Road over Little Beaver Creek west of Harvard. Work includes HMA paving, shoulder construction, and landscaping. | — | Executed | Dunnet Bay Construction Company $2,789,285 · | ||
| Jan 17, 2025 | 61K97 | McHenryDistrict 1 | HMA resurfcing, curb and gutter, sidewalks, drainage improvements, and parkway restoration on First Street from US 14 to Three Oaks Road in Cary. | — | Rejected | |||
| Jan 17, 2025 | 61L00 | McHenryDistrict 1 | HMA resurfacing and aggregate shoulders on Wonder Lake Road, from Thompson Road to White Oaks Road in Wonder Lake. | — | Executed | Curran Contracting Company $619,752 · | ||
| Jan 17, 2025 | 62R95 | McHenryDistrict 1 | (3.47-Mile) SMART Overlay, curb ramps (ADA) improvements, HMA shoulder additions located on IL 173 from Boone County Line to Flat Iron Road in Unincorporated McHenry County. | — | Executed | Peter Baker & Son Co. $2,149,178 · | ||
| Jan 17, 2025 | 62X54 | McHenryDistrict 1 | Demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) The scope of work consists of demolition of (2) single family residences (1-two story wood frame with attached garage) and demolition of (2) two commercial properties (1-one story concrete building, 1-story concrete block and wood frame) including site cleanup and any incidental and collateral work necessary to complete the improvements as shown in the plans. The project is in the plans The project is in the City of Woodstock in McHenry County. | — | Executed | Veterans Vac Services LLC $199,014 · | ||
| Mar 7, 2025 | 62R96 | McHenryDistrict 1 | Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (3.16 miles) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers, on IL 173 from Northeast of Riegheimer Road to 0.2 miles south of Oak Grove Road. This project is in the City of Harvard and Alden Township. | — | Executed | Peter Baker & Son Co. $1,270,720 · | ||
| Mar 7, 2025 | 62T83 | McHenryDistrict 1 | Pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pa (1.49-Mile) SMART Overlay consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement markers; Location: IL 173, from Harvard Hills Rd to SW of Righeimer Rd within the City of Harvard. | — | Executed | Peter Baker & Son Co. $622,485 · | ||
| Mar 7, 2025 | 62X36 | McHenryDistrict 1 | This is a milled rumble strip project. This project begins at the south of the intersection of IL Route 31 (Richmond Road) and Pioneer Drive and proceeds in a northernly direction for 5.204 miles to south of the intersection of IL 31 Tryon Grove Road and U.S. Route 12. The project is located within the Villages of Ringwood and Richmond and the Townships of Richmond and McHenry in McHenry County. | — | Executed | Payne & Dolan, Inc. $348,412 · | ||
| Apr 25, 2025 | 61L18 | McHenryDistrict 1 | HMA roadway reconstruction and construction of a shared-use path from Washington Street to IL 176 on Prospect Street and on IL 176 from Prospect Street east for 600 feet, in the city of Marengo. Includes; storm sewer and parkway restoration. | — | Executed | PirTano Construction Co., LLC $3,549,900 · | ||
| Apr 25, 2025 | 62V53 | McHenryDistrict 1 | Pavement patching, hot-mix asphalt surface removal, hot-mix asphalt surface and level binder resurfacing, shou (2,646-Ft) Standard Overlay consists of pavement patching, hot-mix asphalt surface removal, hot-mix asphalt surface and level binder resurfacing, shoulder and centerline rumble strips, placement of thermoplastic pavement markings on US 20 (Grant Highway) from 0.2 Miles Southeast of Harmony Road to Getty Road in Coral Township. | — | Executed | Schroeder Asphalt Services, Inc. $293,954 · | ||
| Apr 25, 2025 | 62X48 | McHenryDistrict 1 | (1.24- Mile) Pavement Grinding project including pavement grooving, remove and replace curb and gutter, pavement markings, concrete class B patching. IL 31 (Western Algonquin Bypass) at South Main Street to North Main Street in the Village of Algonquin within McHenry County. | — | Executed | Diamond Coring Company, Inc. $566,692 · | ||
| Apr 25, 2025 | 62X94 | McHenryDistrict 1 | (2.25-Mile) Roadway Reconstruction including construction of three roundabouts at Lake Street, McConnell Road and Judd Street/Irving Ave., water main, sanitary and storm sewer replacement, lighting, signing, retaining walls, ADA improvements and a building demolition from US 14 to IL 120 in the City of Woodstock and Woodstock Fire Rescue District within McHenry County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $78,336,172 · | ||
| Jun 13, 2025 | 61L49 | McHenryDistrict 1 | Construction of a triple-cell 12'X 5' box culvert to carry Oakwood Drive over Boone Creek in McHenry. Includes, HMA roadway, sidewalks, curb and gutter, storm sewer and utility adjustments. | — | Executed | Alliance Contractors, Inc. $1,194,482 · | ||
| Jun 13, 2025 | 61L50 | McHenryDistrict 1 | HMA resurfacing on Johnsburg Road from Fairview Avenue to the north city limits of Johnsburg. Includes aggregate shoulders. | — | Executed | Geske and Sons, Inc. $1,758,088 · | ||
| Jun 13, 2025 | 61L51 | McHenryDistrict 1 | Resurfacing Nish Road from Barreville Road to IL 176 in Prairie Grove. | — | Executed | Geske and Sons, Inc. $588,609 · | ||
| Jun 13, 2025 | 62L61 | McHenryDistrict 1 | (10,700-Ft) Designed Overlay and Shoulder Reconstruction, project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full depth (HMA) shoulder, pavement markings, raised reflective pavement markers. Located along IL 47 (Eastwood Drive) from North of IL 176 (North Junction) to South of US 14 in the City of Woodstock. | — | Executed | Curran Contracting Company $2,693,463 · | ||
| Jun 13, 2025 | 62V52 | McHenryDistrict 1 | (9,601-Ft) SMART Overlay and Standard Overlay, ADA sidewalk ramp improvement, pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, pavement markings, sidewalk ramp improvements. Project located on IL 176 (State Road) in the Village of Island Lake. | — | Executed | Curran Contracting Company $2,389,468 · | ||
| Jun 13, 2025 | 62V57 | McHenryDistrict 1 | (2.62-Mile) Designed overlay and new (HMA) shoulder reconstruction project includes asphalt removal, earth excavation, pavement patching, resurfacing with (HMA), full-depth (HMA) shoulder, pavement markings, raised reflective pavement markers, shoulder and centerline rumble strips. Located along IL Route 176 from East of Haligus Road to West of US 14 (Virginia Street) in the City of Crystal Lake. | — | Executed | Curran Contracting Company $2,685,966 · | ||
| Jun 13, 2025 | 62X35 | McHenryDistrict 1 | Pavement patching, hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface cours (2.68-Mile) This project consists of pavement patching, hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in Dorr Township and in the City of Woodstock in McHenry County. | — | Executed | Plote Construction, Inc. $2,341,185 · | ||
| Jun 13, 2025 | 62X66 | McHenryDistrict 1 | Pavement patching, milling of existing asphalt surface, polymerized HMA binder course and HMA surface course, (2.93-Mile) Standard Overlay consists of pavement patching, milling of existing asphalt surface, polymerized HMA binder course and HMA surface course, thermoplastic and hot spray pavement markings, grading and shaping ditches. This project located in Coral Township, in McHenry County. | — | Executed | Plote Construction, Inc. $1,405,173 · | ||
| Jun 13, 2025 | 62X68 | McHenryDistrict 1 | (HMA) surface removal, pavement patching, concrete sidewalk removal and replacement, polymerized (HMA) surface (1.06-Mile) Standard Overlay and Pedestrian Ramp (ADA) project consists of (HMA) surface removal, pavement patching, concrete sidewalk removal and replacement, polymerized (HMA) surface course and binder course, thermoplastic and hot spray pavement marking, combination concrete curb and gutter removal and replacement. Project is in the City of Marengo in Marengo, Seneca, and Coral Townships in McHenry County. | — | Executed | Schroeder Asphalt Services, Inc. $881,875 · | ||
| Sep 19, 2025 | 62T23 | McHenryDistrict 1 | Advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete The project scope of work consists of advanced tree removal, selective clearing as well as all incidental and collateral work necessary to complete the project shown on the plans. This project is in the City of Crystal Lake, City of McHenry, Village of Prairie Grove, and Nunda Township in McHenry County. | — | Executed | Clean Cut Tree Service, Inc. $257,146 · | ||
| Nov 7, 2025 | 61L88 | McHenryDistrict 1 | Construct a four-span RC slabl bridge to carry Allendale Road over Nippersink C Creek. Includes HMA pavement, and guardrail. | — | Executed | Dunnet Bay Construction Company $5,134,451 · | ||
| Jan 16, 2026 | 61L94 | McHenryDistrict 1 | Resurfacing on Raffel Road from Ware Road to IL 120 in Woodstock. | — | Executed | Geske and Sons, Inc. $928,920 · | ||
| Jan 16, 2026 | 61M07 | McHenryDistrict 1 | HMA resurfacing and culvert replacement on Winn Road from US 12 to East Solon Road, and from East Solon Road to Main Street in Spring Grove. Inclues aggregate shoulders. | — | Executed | Curran Contracting Company $910,908 · | ||
| Jan 16, 2026 | 62Y05 | McHenryDistrict 1 | Replacing the expansion joints at both abutments, updating the guardrail, removing tree debris from the channe (1050-Ft) Bridge Deck Overlay (SN 056-0037) consists of replacing the expansion joints at both abutments, updating the guardrail, removing tree debris from the channel. Located on FAP Route 336, IL 31 (Richmond Road) over Nippersink Creek in The City of Richmond in McHenry County, IL. | — | Executed | Martam Construction Incorporated $740,984 · | ||
| Feb 27, 2026 | 61M19 | McHenryDistrict 1 | Resurfacing Queen Anne Road from IL 120 to Bull Valley Road in the Village of Bull Valley. | — | Executed | Geske and Sons, Inc. $544,925 · | ||
| Feb 27, 2026 | 61M23 | McHenryDistrict 1 | Resurfacing of Ballard Road from IL 47 to Pauline Avenue in the Village of Lakewood. Additional work includes patching, guardrail, pavement markings and other required work. | — | Executed | Geske and Sons, Inc. $778,992 · | ||
| Apr 24, 2026 | 61L48 | McHenryDistrict 1 | Reconstruct and realign Kreutzer Road from east of IL 47 to Haligus Road in Huntley. Includes; pavement removal, earth excavation, HMA pavement, storm sewer, curb and gutter, sidewalks, box culvert, and highway lighting. | — | Executed | William Charles Construction Company, LLC $12,274,333 · | ||
| Apr 24, 2026 | 61L86 | McHenryDistrict 1 | Construct a single-span PPC I-girder bridge with RC concrete deck to carry W. Solon Road over the North Branch Nippersink Creek. Includes; HMA approach, driveways, storm sewer, sheet pile retaining wall, and guardrail. | — | Executed | Dunnet Bay Construction Company $4,604,844 · | ||
| Apr 24, 2026 | 61M35 | McHenryDistrict 1 | Construction of sidewalks along FAU 0006 (Marengo Rd.) and FAU 0005 (Ayer St.) in the City of Harvard. Additional work includes curb and gutter, patching, storm sewer and other required work. | — | Executed | Landmark Contractors, Inc. $333,272 · | ||
| Apr 24, 2026 | 80B10 | McHenryDistrict 1 | Milling of the existing hot-mix asphalt (HMA) surface, pavement patching, resurfacing with hot-mix asphalt sur (13,136-Ft) Smart Overlay project consists of milling of the existing hot-mix asphalt (HMA) surface, pavement patching, resurfacing with hot-mix asphalt surface course, longitudinal joint sealing, placement of thermoplastic pavement markings. Located on US Route 14 from State Line Road to North of Oak Grove Road in unincorporated McHenry County. | — | Executed | Peter Baker & Son Co. $1,180,922 · | ||
| Apr 24, 2026 | 80B12 | McHenryDistrict 1 | Pavement patching, pavement widening, and curb removal and repair (705.72-Ft) HMA surface removal and overlaying consist of pavement patching, pavement widening, and curb removal and repair. Drainage, grading, and landscaping improvements. Located near the intersection of US 12 and Commercial Street, in the Village of Richmond in McHenry County, Illinois. | — | Executed | Alliance Contractors, Inc. $393,625 · | ||
| Apr 24, 2026 | 80B20 | McHenryDistrict 1 | Class B patches, and joint sealing, curb and gutter removal and replacement, drainage structure adjustments, p (2.42-Mile) PCC pavement patching improvement consists of Class B patches, and joint sealing, curb and gutter removal and replacement, drainage structure adjustments, placement of modified urethane pavement markings and raised reflective pavement markers, ADA improvements, APS installation. Located on IL Route 120 (Elm St.) from West of Martin Rd. to E. Green St. within the City of McHenry in McHenry County. | — | Executed | Triggi Construction, Inc. $1,799,920 · | ||
| Apr 24, 2026 | 80C85 | McHenryDistrict 1 | Pavement removal, earth excavation and placement of embankment, box culvert installation, storm sewer installa (15,400-Ft) Roadway Reconstruction Project consists of pavement removal, earth excavation and placement of embankment, box culvert installation, storm sewer installation, new PCC pavement with concrete curb and gutter, sidewalk and shared use path construction, traffic signals and interconnection installations water main relocation, pavement marking, landscaping, erosion and sediment control. Location in the City of McHenry, Village of Prairie Grove, and unincorporated Nunda Township within McHe | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $49,786,194 · | ||
| Jun 12, 2026 | 62U72 | McHenryDistrict 1 | Pavement removal, earth excavation and placement of embankment, precast box culvert installation, bridge repla (8,360-Ft) Roadway add lanes and reconstruction project consists of pavement removal, earth excavation and placement of embankment, precast box culvert installation, bridge replacement, storm sewer installation, construction of new PCC pavement with combination concrete curb and gutter, sidewalk and shared use path construction, traffic signals and interconnection installations, highway lighting replacement, water main and sanitary sewer relocation, placement of pavement marking, landscaping, er | — | Executed | Martam Construction Incorporated $52,825,490 · | ||
| Jun 12, 2026 | 62V63 | McHenryDistrict 1 | Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement (0.895-Mile) Project consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. Location is in the City of Algonquin, McHenry County. | — | Executed | SKC Construction, Inc. $184,544 · | ||
| Jun 12, 2026 | 80C45 | McHenryDistrict 1 | (1.2-Mile) Standard Overlay for US 14 and SMART Overlay for South Frontage Road project includes pavement patches, HMA surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, raised reflective pavement markers. The project is located within the City of Woodstock. | — | Executed | Peter Baker & Son Co. $1,605,106 · | ||
| Sep 18, 2026 | 61L85 | McHenryDistrict 1 | Construction of a two-span IL-Beam bridge with concrete deck to carry Johnson Road over Nippersink Creek. Includes raising roadway profile, HMA roadway construction and guardrail. | — | Executed | ICC Group Inc. $4,751,000 · | ||
| Sep 18, 2026 | 61M59 | McHenryDistrict 1 | Full-Depth reclamation, HMA binder and surface, aggregate shoulder, and the construction of a shared-use path from Airport Road to IL 23 in Harvard. | — | Executed |
101–161 of 161‹ Prev
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.