Filtered by: County: Kendall Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 23, 2021 | 66L61 | KendallLaSalleDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Kendall and LaSalle Counties. | — | Executed | H & H Electric Co. $49,983 · | ||
| Jun 11, 2021 | 66D51 | KendallDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on FAP 607 (US 52) from Townhouse road north to IL 47. | — | Executed | D. Construction, Inc. $2,440,250 · | ||
| Jun 11, 2021 | 66L31 | KendallDistrict 3 | This project consists of 3.94 miles of shoulder widening and rumble strip installation on_US 52 from 0.16 miles East of IL 17 to Grove Rd in Kendall County. | — | Executed | D. Construction, Inc. $688,542 · | ||
| Jun 11, 2021 | 66L78 | DeKalbKendallDistrict 3 | Class B pavement patching and pavement striping on FAP 591 (US 34) within the City limits of Sandwich beginning at Pearl St. in Dekalb County and ending at Duvick Ave. in Kendall County. | — | Executed | Scanlon Excavating & Concrete, Inc. $226,114 · | ||
| Jul 30, 2021 | 46584 | GrundyKendallDistrict 3 | Removing and replacing existing centerline striping on FAI 80 (I-80) in Grundy County, FAP 591 (US 34) and FAP 311 (US 34 and IL 71) in Kendall County. | — | Executed | Maintenance Coatings Co. $264,008 · | ||
| Jul 30, 2021 | 62G10 | KendallWillDistrict 1 | (1700-Ft) Traffic Signal Installation, Channelization. Roadway Reconstruction. Location: IL 126 at County Line Road in the Na-Au-Say and Plainfield Townships in Will and Kendall Counties. | — | Executed | P. T. Ferro Construction Co. $1,259,611 · | ||
| Jul 30, 2021 | 66L21 | KendallDistrict 3 | Removing and replacing 6' of the culvert barrel and wing walls on on both ends of the culverts and guardrail r This work is located on FAP Route 607 (US 52) at Sta. 398+51 approximately 7.5 miles East of IL 47 (1.6 miles West of Will County Line). This project consists of removing and replacing 6' of the culvert barrel and wing walls on on both ends of the culverts and guardrail removal and replacement, also including other related construction items. | — | Executed | Riber Construction, Inc. $220,993 · |
1–7 of 7
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.