Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 12, 2026 46952 CookDistrict 1 Resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs (2.69-Mile) Project consists of resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs. The work includes hot- mix asphalt resurfacing of roadway and parking areas, striping of park roadways and parking lots, bridge construction, pipe culvert replacements, sign replacements, multi-use path improvements, sidewalk and ADA improvements, and other miscellaneous improvement items. Project is in William Powers State Park, located in the City of Chicago in — Executed Nov 25 New K-Five Construction Corporation $3,153,771 ·
Jun 12, 2026 61M46 CookDistrict 1 HMA resurfacing of Skokie Boulevard from the southern city limits to Lake-Cook Road in the village of Northbrook. — Executed Nov 25 New Builders Paving, LLC $2,247,439 ·
Jun 12, 2026 61M49 CookDistrict 1 Installation of pedestrian lighting along the illinois Prairie Path in the village of Maywood. — Executed Nov 25 New Sjostrom & Sons, Inc. $1,709,017 ·
Jun 12, 2026 61M51 CookDistrict 1 Reconstruction of HMA trail from 109th Street and Lavergne Avenue to Harold L. Richards High School in the village of Oak Lawn. — Executed Nov 25 New Martam Construction Incorporated $3,179,237 ·
Jun 12, 2026 61M53 CookDistrict 1 Resurfacing Lexington Drive from Lake Cook Road to McHenry Road in the village of Wheeling. — Executed Nov 25 New Builders Paving, LLC $478,613 ·
Jun 12, 2026 62L30 CookDistrict 1 (2.95-Mile) Roadway Reconstruction and widening with hot-mix asphalt pavement, resurfacing, multi-cell box culverts, pipe culverts, storm sewer systems, ditch grading, curb and gutter, pavement markings, landscaping, guardrail. Located on Main Street is a two-lane roadway located in the Village of Lemont and unincorporated Cook County. — Executed Nov 25 New D. Construction, Inc. $13,940,412 ·
Jun 12, 2026 62R61 CookDistrict 1 (710.53-Ft) Bridge Replacement and widening project (SN 016-2015) include pavement resurfacing/reconstruction, curb and gutter replacement, sidewalk replacement (including ADA improvements), various drainage improvements, watermain (including jacking beneath I-290), signing, pavement markings, bridge and underpass lighting, traffic signal modernization, replacement storm manhole The project is in the City of Chicago, Cook County on Laramie Ave. over I-290. — Executed Nov 25 New OHLA Central, Inc. $43,537,120 ·
Jun 12, 2026 62T46 CookDistrict 1 Bridge Joint Replace, bearing and Substructure Repairs (350.89-Ft) Bridge Deck Overlay consists of Bridge Joint Replace, bearing and Substructure Repairs. This improvement is located along 131st Street over Metra Railroad (SN 016-2611) located in Cook County, Illinois. — Executed Nov 25 New D. Construction, Inc. $602,552 ·
Jun 12, 2026 62V08 CookDuPageKaneDistrict 1 Ditch regrading, culvert replacement, and various other drainage improvements The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. This project is in DuPage County, This project is in DuPage County, Cook County and Kane County. — Executed Nov 25 New D. Construction, Inc. $1,863,322 ·
Jun 12, 2026 62W83 CookDistrict 1 This project adds 35 traffic signals into the Central Traffic Management System and 2 traffic signals to an existing closed loop system including installing fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and monitoring capabilities at these locations. The Project is in three different areas of Cook County. — Executed Nov 25 New H & H Electric Co. $2,052,267 ·
Jun 12, 2026 62W91 CookDistrict 1 Installing fiber optic cable, network switches, PTZ Cameras and traffic controllers among other equipment to a This project proposes adding 10 traffic signals into the Central Traffic Management System and connecting two existing closed-loop systems together consists of installing fiber optic cable, network switches, PTZ Cameras and traffic controllers among other equipment to allow for remote access and monitoring capabilities. The project is in the Village of Olympia Fields, Village of Franklin Park, City of Northlake and City of Berwyn in Cook County. — Rejected Nov 25 New H & H Electric Co. $1,753,960 ·
Jun 12, 2026 62W99 CookDistrict 1 Furnishing all labor, materials, equipment, and other incidentals necessary for the completion of HMA pavement The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the completion of HMA pavement patching, storm sewer cleaning, bridge deck repairs, superstructure repairs, substructure repairs, lighting. Located in the Elk Grove Township and City of Schaumburg, Cook County, on IL 53/I-290 from south I-90 interchange to IL 72 (Higgins Rd). — Executed Nov 25 New K-Five Construction Corporation $25,555,133 ·
Jun 12, 2026 80B22 CookDistrict 1 (3.71-Mile) SMART overlay, proposed pavement markings, ADA ramp details at the ramps listed, installing APS push buttons at all signalized intersections listed, and replacement of all loop detectors impacted by the resurfacing. Project located at US 41 (Skokie Blvd)/ IL 50 (Cicero Ave) from Golf Road to Devon Ave is in the Villages of Skokie and Lincolnwood in Cook County, IL. — Executed Nov 25 New K-Five Construction Corporation $7,389,202 ·
Jun 12, 2026 80B28 CookDistrict 1 (4,957.13-Ft) HMA overlay of existing concrete pavement and ADA improvements. The roadway scope of work includes HMA pavement, curb removal and replacement, median removal and replacement, pavement patching, driveway removal and replacement, thermoplastic pavement markings, ADA improvements, and traffic signal/APS improvements. Project is located along IL Route 62 (Algonquin Road) from Radisson Way to Barker Avenue in Rolling Meadows and Schaumburg, Illinois. — Executed Nov 25 New K-Five Construction Corporation $3,929,710 ·
Jun 12, 2026 80B33 CookDistrict 1 (HMA) surface removal, pavement patching, (HMA) shoulders, resurfacing with (HMA) binder and surface course, c (5,764-Ft) Design Overlay, ADA Improvements consists of (HMA) surface removal, pavement patching, (HMA) shoulders, resurfacing with (HMA) binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. The project is located within the City of Harvey in Cook County. — Executed Nov 25 New D. Construction, Inc. $933,943 ·
Jun 12, 2026 80B35 CookDistrict 1 (1.53-Mile) SMART overlay and ADA Improvement project includes hot-mix asphalt removal, earth excavation, pavement patching, resurfacing hot-mix asphalt, pavement markings, raised reflective pavement markers, ADA ramps, traffic signals, and detector loops. Project is in the Village of River Grove, Village of Schiller Park and City of Chicago in Cook County. — Executed Nov 25 New K-Five Construction Corporation $2,873,926 ·
Jun 12, 2026 80B47 CookDistrict 1 Reconstruction of the expansion joints with strip seals, slope wall repair and substructure repair Bridge Painting project consists of reconstruction of the expansion joints with strip seals, slope wall repair and substructure repair. Project is located on FAI 90/94 (Kennedy Expressway) under Ainslie Street in the City of Chicago. (SN 016-1105) — Executed Nov 25 New Areatha Construction Co., Inc. $641,982 ·
Jun 12, 2026 80B51 CookDistrict 1 Cleaning and painting steel surfaces as designated on the plans and any incidental work (0.20-Mile) Bridge Painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental work. The project is located at structure No. 1 (SN. 016-0436) carrying the IHB Railroad over US 12/20 (95th ST) in the Village of Bridgeview in Cook County. — Executed Nov 25 New Capital Industrial Services, LLC $493,330 ·
Jun 12, 2026 80B58 CookDistrict 1 Drainage structure cleaning, frame and grate replacement and any collateral or incident work located in the Vi (3.20-Mile) Project consists of drainage structure cleaning, frame and grate replacement and any collateral or incident work located in the Villages of Forest Park, Maywood, Broadview, Bellwood and Westchester within Cook County. — Executed Nov 25 New MYS, Incorporated $652,635 ·
Jun 12, 2026 80B66 CookDistrict 1 Installation of permanent protective shielding as shown on the plans and any incidental and collateral work ne This is a permanent protective shielding project and the work to be performed under this contract consists of installation of permanent protective shielding as shown on the plans and any incidental and collateral work necessary to complete located at various structures carrying Circle Ave, Harlem Ave and California Ave Over I-290 (Eisenhower) in the Villages of Oak Park, Forest Park and City of Chicago, in Cook County. — Executed Nov 25 New Lorig Construction Company $397,833 ·
Jun 12, 2026 80B78 CookDistrict 1 Refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes with limits from (1.90-Mile) Project consists of refinishing surface art medallions on existing retaining walls along the Dan Ryan Local Lanes with limits from 51st Street to 59th Street in the City of Chicago, in Cook County. — Rejected Nov 25 New MYS, Incorporated $1,409,040 ·
Jun 12, 2026 80B87 CookDistrict 1 A design overlay of the existing pavement with HMA surface course and binder course, thermoplastic pavement ma (5.37-Mile) Project consists of a design overlay of the existing pavement with HMA surface course and binder course, thermoplastic pavement markings, ADA improvements for curb ramps, combination concrete curb and gutter located in the Villages of Wheeling and Arlington Heights and the City of Prospect Heights in Cook County. — Executed Nov 25 New Builders Paving, LLC $3,116,448 ·
Jun 12, 2026 80C89 CookLakeDistrict 1 This work includes mast arm and pole replacement, installation of LED signal heads, installation of accessible pedestrian signals, controller replacement and all incidental and collateral work necessary to complete the project. This project is located in Lake and Cook Counties in District 1. — Executed Nov 25 New H & H Electric Co. $2,718,198 ·
Jun 12, 2026 80C90 CookDistrict 1 Repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-0396) over Racine Avenue and Norfol (2,470-Ft) Bridge repair work consists of repairs and temporary shoring to the existing Pershing Road Bridge (SN 016-0396) over Racine Avenue and Norfolk Southern Railroad east and west spurs. Work includes installation of temporary shoring towers, structural steel repair, protective shielding, pavement marking and signing, traffic control and protection in the City of Chicago, Cook County — Rejected Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $2,448,235 ·
Jun 12, 2026 80C97 CookDistrict 1 Advanced shoring at structures (SN 016-2047 and SN 016-2049) along I-90/94 at Ogden Avenue (110-Ft) Project consists of advanced shoring at structures (SN 016-2047 and SN 016-2049) along I-90/94 at Ogden Avenue. The total length of the project is 110 feet (0.02 miles). The project is in the City of Chicago in Cook County. — Executed Nov 25 New Rausch Infrastructure, LLC $727,711 ·
Jun 12, 2026 80D00 CookDistrict 1 (4,498-Ft) Smart Overlay, ADA Improvements include Hot-Mix Asphalt (HMA) removal, Portland Cement Concrete (PCC) pavement removal and replacement, resurfacing with HMA surface course, concrete curb and gutter removal and replacement, brick paver removal and reinstallation, detector loop replacement, Accessible Pedestrian Signal (APS), ADA curb ramps improvements, raised reflective markers, thermoplastic and modified urethane pavement marking. Location is in the Village of Schiller Park within Co — Executed Nov 25 New Plote Construction, Inc. $2,322,000 ·
1–26 of 26

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.