IDOT Jobs

All dates · 58 jobs · — Sign up free
★ My Jobs

Filtered by: County: Clinton Clear all

58 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 97563 ClintonDistrict 8 Construction of a PCC roundabout and approaches at the intersection of Jamestown Road and Holy Cross Lane in Breese, Illinois. — Executed Nov 26 New Baxmeyer Construction, Inc. $2,226,778 ·
Mar 9, 2018 76L38 ClintonDistrict 8 Painting three bridges; SN 014-0055, US 50 at Frogtown Road, 6 miles west of Carlyle, SN 014-0056, US 50 at Flat Branch Road, 1.5 miles west of Carlyle, SN 014-0061 US 50 at the Kaskaskia River in Carlyle. — Executed Nov 26 New Venus Painting Co. $497,795 ·
Jun 15, 2018 76L65 ClintonDistrict 8 Patching on US 50 from the St. Clair County line to the Marion County line. — Executed Nov 26 New Beniach Construction Co., Inc. $633,392 ·
Aug 3, 2018 46904 ClintonDistrict 8 Removal of existing culverts and installation of a 10'X 5' box culvert and a 48" pipe culvert on the entrance road to Eldon Hazlet State Park. — Executed Nov 26 New Keeley & Sons, Inc. $348,980 ·
Nov 9, 2018 76887 ClintonDistrict 8 Bridge replcement, culvert replacement and 3' grade raise for the roadway on IL 161 over Crooked Creek, 8.6 miles east of IL 127. — Executed Nov 26 New Plocher Construction Company, Inc. $12,725,625 ·
Jan 18, 2019 76M03 ClintonDistrict 8 Bridge and jooint repair on SN 014-0031 on Old US 50 approximately 1.2 miles east of Aviston. — Executed Nov 26 New Keller Construction, Inc. $305,388 ·
Mar 8, 2019 76H15 ClintonDistrict 8 5 miles of resurfacing on IL 160 from IL 161 in New Baden to 4th Street in Trenton. — Executed Nov 26 New The Kilian Corporation $2,828,290 ·
Mar 8, 2019 76L08 ClintonDistrict 8 4.4 miles of resurfacing and HMA soulders/ rumble strips on IL 160/ IL 177 from 0.1 mile west of Sand Hill Road to the Washington County line/ Kaskaskia River Bridge. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $2,189,288 ·
Mar 8, 2019 76M07 ClintonDistrict 8 7.5 miles of patching and underdrains on I-64 from the St. Clair County line to the Washington County line in Clinton County. — Executed Nov 26 New Keeley & Sons, Inc. $823,830 ·
Apr 26, 2019 76H14 ClintonDistrict 8 3.8 miles of resurfacing on IL 160 from IL 161 to IL 177. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,595,478 ·
Apr 26, 2019 76M15 ClintonDistrict 8 Slab on slab repair and culvert maintenance at SN 014-2005 carrying IL 127 over Mid Trib Flat Branch, 1.2 miles south of the Bond County line. — Executed Nov 26 New Stutz Excavating, Inc. $137,628 ·
Jun 14, 2019 46916 ClintonDistrict 8 RESURFACING OF PARK ROADS AND PARKING LOT. ADA SIDEWALK AND RAMP UPGRADES AND REPLACEMENT OF CULVERTS AT ELDON HAZLET STATE PARK. — Executed Nov 26 New Howell Paving, Inc. $1,323,717 ·
Jun 14, 2019 97705 ClintonDistrict 8 Resurfacing and guardrail replacement on CH 3 from US 50 to Gambill Road. — Executed Nov 26 New Howell Paving, Inc. $1,166,409 ·
Jul 12, 2019 76M64 ClintonDistrict 8 2.5 miles of resurfacing on IL 160 from the Madison County line to 0.3 miles north of US 50. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $657,842 ·
Jul 12, 2019 76M76 ClintonDistrict 8 3.2 miles of resurfacing on US 50 from 0.2 miles west of IL 160 to the Sugar Creek Overflow. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,049,313 ·
Nov 8, 2019 76M28 ClintonDistrict 8 Tree removal along Old US 50 from Koch Lane to Hilmes Road. — Executed Nov 26 New Nettle Creek Nursery, Inc. $64,600 ·
Jan 17, 2020 76L31 ClintonDistrict 8 ADA improvements along IL 161 from Clinton Street to 11th Street in New Baden. — Executed Nov 26 New Hank's Excavating & Landscaping, Inc. $151,631 ·
Jan 17, 2020 76N08 ClintonDistrict 8 Ultra-thin bonded wearing course on I-64 from 0.3 miles east of the St. Clair County line to the Washington County line. — Executed Nov 26 New The Kilian Corporation $2,978,674 ·
Apr 24, 2020 76N32 ClintonDistrict 8 Resurfacing and patching of Old US 50 from Hilmes Road to Carter Street and patching on Old US 50 from Carter Street to IL 127. — Rejected Nov 26 New Christ Bros. Asphalt, Inc. $367,264 ·
Apr 24, 2020 76N46 ClintonDistrict 8 Bridge painting on US 50 over North Walnut Street in Breese (SN 014-0066 and 014-0067) — Executed Nov 26 New Three Star Painting, Inc. $277,333 ·
Jun 12, 2020 76K64 ClintonDistrict 8 4 miles of designed overlay and bridge deck overlay on US 50 from 1 mile east of Crackerneck Road to 0.2 miles west of St. Rose Road. — Executed Nov 26 New The Kilian Corporation $8,502,200 ·
Jun 12, 2020 76L17 ClintonDistrict 8 3.3 miles of resurfacing along US 50 from Shattuc Road to the Marion County line. — Executed Nov 26 New Howell Paving, Inc. $1,912,983 ·
Jun 12, 2020 76N51 ClintonDistrict 8 4.1 miles of patching on US 50 from St. Rose Road to Frogtown Road. — Executed Nov 26 New DMS Contracting, Inc. $392,923 ·
Jun 12, 2020 76N56 ClintonDistrict 8 2 miles of pavement patching on IL 161 from Church Steeple Road to Slant Road near Bartelso. — Executed Nov 26 New G. M. Sipes Construction, Inc. $496,782 ·
Jun 12, 2020 76N81 ClintonDistrict 8 7.2 miles of ultra-thin bonded wearing course on I-64 from 0.3 miles east of the St. Clair County line to the Washington County line. — Executed Nov 26 New The Kilian Corporation $3,387,825 ·
Jun 12, 2020 97723 ClintonDistrict 8 Resurfacing Bartelso Road from Old US 50 in Beckemeyer to IL 161 in Bartelso. — Executed Nov 26 New Howell Paving, Inc. $1,139,992 ·
Nov 6, 2020 76N12 ClintonDistrict 8 Micro-surfacing on US 50 from 0.3 miles west of Frogtown Road to 0.1 miles west of IL 127. — Executed Nov 26 New Asphalt Stone Company and Pavement Maintenance Systems JV $404,123 ·
Nov 6, 2020 76N13 ClintonDistrict 8 Ultra-thin bonded wearing course on US 50 from 0.3 miles west of St, Rose Road to 0.3 miles west of Frogtown Road. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,288,167 ·
Nov 6, 2020 76N93 ClintonDistrict 8 Patching of Old US 50 (Franklin Street) from 13th Street in Carlyle to Carter Street in Beckemeyer. — Executed Nov 26 New Ramirez Diversified Services, LLC $424,857 ·
Jan 15, 2021 76N69 ClintonDistrict 8 Microsurfacing on IL 161 from 0.1 miles west of Slant Road to 0.2 miles west of Broadway in Centralia. — Executed Nov 26 New Asphalt Stone Company $984,640 ·
Jan 15, 2021 97746 ClintonDistrict 8 Replace the bridge carrying CH 3 over Gibbs Creek, 5.0 miles northwest of Shattuc. — Executed Nov 26 New Depew and Owen Builders, Inc. $536,588 ·
Mar 5, 2021 76N92 ClintonDistrict 8 0.67 miles of resurfacing along Ferrin Road / County Highway 3 from US 50 to Louis Street. — Executed Nov 26 New The Kilian Corporation $166,969 ·
Mar 5, 2021 76P11 ClintonDistrict 8 Bridge painting on IL 161 over Wilken Lake, 0.5 miles east of Germantown (SN 014-0009) and over Shoal Creek overflow, 0.6 miles east of Germantown (SN 014-0010). — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $319,658 ·
Apr 23, 2021 76N78 ClintonDistrict 8 Crack and joint sealing on IL 127 from the Bond County line to 0.2 miles north of Williams Road. — Executed Nov 26 New Freehill Asphalt, Inc. $151,361 ·
Jun 11, 2021 76N84 ClintonDistrict 8 0.8 miles of Bureau of Research test pavement alongside US 50 from Crackerneck Road to Russland Road. — Executed Nov 26 New Baxmeyer Construction, Inc. $3,239,778 ·
Sep 17, 2021 76P38 ClintonDistrict 8 2.6 miles of resurfacing on Old US 50 from 0.2 miles west of Carter Street to 0.6 miles east of Pipeline Road. — Executed Nov 26 New The Kilian Corporation $518,909 ·
Nov 5, 2021 76P54 ClintonDistrict 8 4.5 miles of resurfacing on IL 161 from Albers Road to Hanover Street in Germantown. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,222,498 ·
Jan 21, 2022 76P20 ClintonDistrict 8 Crack and joint sealing on Slant Road from IL 161 to IL 127. — Executed Nov 26 New Freehill Asphalt, Inc. $117,048 ·
Apr 29, 2022 76P59 ClintonDistrict 8 Box culvert replacement on US 50 over a drainage ditch, 0.5 miles east of Huey Road. — Executed Nov 26 New DMS Contracting, Inc. $242,608 ·
Jun 17, 2022 76P79 ClintonDistrict 8 Bridge joint replacement and repairs on SN 014-0063 carrying IL 127 over Flat Branch Creek, 8.1 miles north of Carlyle. — Executed Nov 26 New Keller Construction, Inc. $545,545 ·
Aug 5, 2022 97784 ClintonDistrict 8 Hot-Mix asphalt resurfacing and shoulder widening on Germantown Road from the Breese city limits to the Germantown city limits, and Hot-Mix asphalt removal and resurfacting within the city limits of each municpality. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,991,478 ·
Jan 20, 2023 76R86 ClintonDistrict 8 160- of HMA surface removal and overlay on eastbound I-64 over Sugar Creek Overflow and Sugar Creek, west of Damiansville. (SN 014-0040 and SN 014-0042) — Executed Nov 26 New The Kilian Corporation $101,479 ·
Mar 10, 2023 76M44 ClintonDistrict 8 Culvert replacement on Old US 50, 0.5 miles west of IL 160. (SN 014-2435) — Executed Nov 26 New Stutz Excavating, Inc. $141,088 ·
Apr 28, 2023 76R76 ClintonDistrict 8 0.8 miles of patching and resurfacing along Collins Street/Huey Road/County Highway 4 from US 50 to 0.2 miles south of Sherman Street. — Executed Nov 26 New Howell Paving, Inc. $413,967 ·
Jun 16, 2023 76R74 ClintonDistrict 8 Pavement patching and resurfacing on the ramp between US 50 and St. Rose Road. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $263,913 ·
Sep 22, 2023 76R64 ClintonDistrict 8 Bridge joint replacement and repair on SN 014-0015 carrying IL 127 over NS Railroad, 0.2 miles north of IL 161. — Executed Nov 26 New Keeley & Sons, Inc. $429,291 ·
Jan 19, 2024 97818 ClintonDistrict 8 HMA resurfacing with patching, incedental resurfacing at sideroads and entrances, and aggregate shoulders on CH 8 from IL 161 to 0.30 mile north of I-64. — Executed Nov 26 New The Kilian Corporation $1,003,243 ·
Apr 26, 2024 76T32 ClintonDistrict 8 0.7 miles of patching and resurfacing on IL 161 from 0.3 miles west of Red Fox Road to 0.1 miles east of Church Steeple Road. — Executed Nov 26 New The Kilian Corporation $721,636 ·
Apr 26, 2024 76T40 ClintonDistrict 8 Bridge painting on US 50 under Schumacher Road, 5 miles east of Trenton (SN 014-0050), and on IL 127 over Flat Branch Creek, 8.1 miles north of Carlyle (SN 014 0063). — Executed Nov 26 New Civil Coatings and Construction Inc. $376,650 ·
Nov 8, 2024 76N47 ClintonDistrict 8 Turn lane widening, resurfacing and culvert replacement and extensions on IL 160 at Wesclin Road, approximately 1.75 miles north of New Baden. — Executed Nov 26 New The Kilian Corporation $2,978,735 ·
Apr 25, 2025 97861 ClintonDistrict 8 Resurfacing on Aviston Road from Old US Highway 50 to IL 161. — Executed Nov 25 New Christ Bros. Asphalt, Inc. $2,147,938 ·
Jun 13, 2025 76U25 ClintonMadisonSt. ClairDistrict 8 Traffic signal modernization at various locations throughout District 8. — Executed Nov 25 New Gerstner Electric, Inc. $669,700 ·
Aug 1, 2025 97867 ClintonDistrict 8 Construct a single-span PPC deck beam bridge to carry CH 20 (Lake Road) over Bond Branch, 1 mile northeast of Carlyle. — Executed Nov 25 New C-Hill Civil Contractors, Inc. $729,988 ·
Sep 19, 2025 76R08 ClintonDistrict 8 1.3 miles of resurfacing and ADA improvements on Old US 50, 0.6 miles east of Pipeline Road to 13th Street in Carlyle. — Executed Nov 25 New Howell Paving, Inc. $1,023,182 ·
Apr 24, 2026 76U93 ClintonDistrict 8 0.9 miles of Bureau of Research test pavement alongside US 50 from Crackerneck Road to Russland Road. — Executed Nov 25 New Evergreen Roadworks, LLC $130,702 ·
Jun 12, 2026 76V18 ClintonSt. ClairDistrict 8 6.5 miles of longitudinal joint repair on I-64 from 0.5 miles west of IL 4 in Mascoutah to 0.3 miles east of the Clinton County line. — Executed Nov 25 New The Kilian Corporation $3,286,837 ·
Jul 31, 2026 46949 ClintonDistrict 8 Resurfacing parking areas with PCC surface, sidewalk construction and drainage improvements at Eldon State Recreational Area. — Executed Nov 25 New McCarthy Improvement Company $2,907,718 ·
Sep 18, 2026 76V26 ClintonDistrict 8 4.4 miles of resurfacing on US 50 from 11th Street in Carlyle to Huey Road. — Executed Nov 25 New
1–58 of 58

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.