| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 97563 | ClintonDistrict 8 | Construction of a PCC roundabout and approaches at the intersection of Jamestown Road and Holy Cross Lane in Breese, Illinois. | — | Executed | Baxmeyer Construction, Inc. $2,226,778 · | ||
| Mar 9, 2018 | 76L38 | ClintonDistrict 8 | Painting three bridges; SN 014-0055, US 50 at Frogtown Road, 6 miles west of Carlyle, SN 014-0056, US 50 at Flat Branch Road, 1.5 miles west of Carlyle, SN 014-0061 US 50 at the Kaskaskia River in Carlyle. | — | Executed | Venus Painting Co. $497,795 · | ||
| Jun 15, 2018 | 76L65 | ClintonDistrict 8 | Patching on US 50 from the St. Clair County line to the Marion County line. | — | Executed | Beniach Construction Co., Inc. $633,392 · | ||
| Aug 3, 2018 | 46904 | ClintonDistrict 8 | Removal of existing culverts and installation of a 10'X 5' box culvert and a 48" pipe culvert on the entrance road to Eldon Hazlet State Park. | — | Executed | Keeley & Sons, Inc. $348,980 · | ||
| Nov 9, 2018 | 76887 | ClintonDistrict 8 | Bridge replcement, culvert replacement and 3' grade raise for the roadway on IL 161 over Crooked Creek, 8.6 miles east of IL 127. | — | Executed | Plocher Construction Company, Inc. $12,725,625 · | ||
| Jan 18, 2019 | 76M03 | ClintonDistrict 8 | Bridge and jooint repair on SN 014-0031 on Old US 50 approximately 1.2 miles east of Aviston. | — | Executed | Keller Construction, Inc. $305,388 · | ||
| Mar 8, 2019 | 76H15 | ClintonDistrict 8 | 5 miles of resurfacing on IL 160 from IL 161 in New Baden to 4th Street in Trenton. | — | Executed | The Kilian Corporation $2,828,290 · | ||
| Mar 8, 2019 | 76L08 | ClintonDistrict 8 | 4.4 miles of resurfacing and HMA soulders/ rumble strips on IL 160/ IL 177 from 0.1 mile west of Sand Hill Road to the Washington County line/ Kaskaskia River Bridge. | — | Executed | Christ Bros. Asphalt, Inc. $2,189,288 · | ||
| Mar 8, 2019 | 76M07 | ClintonDistrict 8 | 7.5 miles of patching and underdrains on I-64 from the St. Clair County line to the Washington County line in Clinton County. | — | Executed | Keeley & Sons, Inc. $823,830 · | ||
| Apr 26, 2019 | 76H14 | ClintonDistrict 8 | 3.8 miles of resurfacing on IL 160 from IL 161 to IL 177. | — | Executed | Christ Bros. Asphalt, Inc. $1,595,478 · | ||
| Apr 26, 2019 | 76M15 | ClintonDistrict 8 | Slab on slab repair and culvert maintenance at SN 014-2005 carrying IL 127 over Mid Trib Flat Branch, 1.2 miles south of the Bond County line. | — | Executed | Stutz Excavating, Inc. $137,628 · | ||
| Jun 14, 2019 | 46916 | ClintonDistrict 8 | RESURFACING OF PARK ROADS AND PARKING LOT. ADA SIDEWALK AND RAMP UPGRADES AND REPLACEMENT OF CULVERTS AT ELDON HAZLET STATE PARK. | — | Executed | Howell Paving, Inc. $1,323,717 · | ||
| Jun 14, 2019 | 97705 | ClintonDistrict 8 | Resurfacing and guardrail replacement on CH 3 from US 50 to Gambill Road. | — | Executed | Howell Paving, Inc. $1,166,409 · | ||
| Jul 12, 2019 | 76M64 | ClintonDistrict 8 | 2.5 miles of resurfacing on IL 160 from the Madison County line to 0.3 miles north of US 50. | — | Executed | Christ Bros. Asphalt, Inc. $657,842 · | ||
| Jul 12, 2019 | 76M76 | ClintonDistrict 8 | 3.2 miles of resurfacing on US 50 from 0.2 miles west of IL 160 to the Sugar Creek Overflow. | — | Executed | Christ Bros. Asphalt, Inc. $1,049,313 · | ||
| Nov 8, 2019 | 76M28 | ClintonDistrict 8 | Tree removal along Old US 50 from Koch Lane to Hilmes Road. | — | Executed | Nettle Creek Nursery, Inc. $64,600 · | ||
| Jan 17, 2020 | 76L31 | ClintonDistrict 8 | ADA improvements along IL 161 from Clinton Street to 11th Street in New Baden. | — | Executed | Hank's Excavating & Landscaping, Inc. $151,631 · | ||
| Jan 17, 2020 | 76N08 | ClintonDistrict 8 | Ultra-thin bonded wearing course on I-64 from 0.3 miles east of the St. Clair County line to the Washington County line. | — | Executed | The Kilian Corporation $2,978,674 · | ||
| Apr 24, 2020 | 76N32 | ClintonDistrict 8 | Resurfacing and patching of Old US 50 from Hilmes Road to Carter Street and patching on Old US 50 from Carter Street to IL 127. | — | Rejected | Christ Bros. Asphalt, Inc. $367,264 · | ||
| Apr 24, 2020 | 76N46 | ClintonDistrict 8 | Bridge painting on US 50 over North Walnut Street in Breese (SN 014-0066 and 014-0067) | — | Executed | Three Star Painting, Inc. $277,333 · | ||
| Jun 12, 2020 | 76K64 | ClintonDistrict 8 | 4 miles of designed overlay and bridge deck overlay on US 50 from 1 mile east of Crackerneck Road to 0.2 miles west of St. Rose Road. | — | Executed | The Kilian Corporation $8,502,200 · | ||
| Jun 12, 2020 | 76L17 | ClintonDistrict 8 | 3.3 miles of resurfacing along US 50 from Shattuc Road to the Marion County line. | — | Executed | Howell Paving, Inc. $1,912,983 · | ||
| Jun 12, 2020 | 76N51 | ClintonDistrict 8 | 4.1 miles of patching on US 50 from St. Rose Road to Frogtown Road. | — | Executed | DMS Contracting, Inc. $392,923 · | ||
| Jun 12, 2020 | 76N56 | ClintonDistrict 8 | 2 miles of pavement patching on IL 161 from Church Steeple Road to Slant Road near Bartelso. | — | Executed | G. M. Sipes Construction, Inc. $496,782 · | ||
| Jun 12, 2020 | 76N81 | ClintonDistrict 8 | 7.2 miles of ultra-thin bonded wearing course on I-64 from 0.3 miles east of the St. Clair County line to the Washington County line. | — | Executed | The Kilian Corporation $3,387,825 · | ||
| Jun 12, 2020 | 97723 | ClintonDistrict 8 | Resurfacing Bartelso Road from Old US 50 in Beckemeyer to IL 161 in Bartelso. | — | Executed | Howell Paving, Inc. $1,139,992 · | ||
| Nov 6, 2020 | 76N12 | ClintonDistrict 8 | Micro-surfacing on US 50 from 0.3 miles west of Frogtown Road to 0.1 miles west of IL 127. | — | Executed | Asphalt Stone Company and Pavement Maintenance Systems JV $404,123 · | ||
| Nov 6, 2020 | 76N13 | ClintonDistrict 8 | Ultra-thin bonded wearing course on US 50 from 0.3 miles west of St, Rose Road to 0.3 miles west of Frogtown Road. | — | Executed | Christ Bros. Asphalt, Inc. $1,288,167 · | ||
| Nov 6, 2020 | 76N93 | ClintonDistrict 8 | Patching of Old US 50 (Franklin Street) from 13th Street in Carlyle to Carter Street in Beckemeyer. | — | Executed | Ramirez Diversified Services, LLC $424,857 · | ||
| Jan 15, 2021 | 76N69 | ClintonDistrict 8 | Microsurfacing on IL 161 from 0.1 miles west of Slant Road to 0.2 miles west of Broadway in Centralia. | — | Executed | Asphalt Stone Company $984,640 · | ||
| Jan 15, 2021 | 97746 | ClintonDistrict 8 | Replace the bridge carrying CH 3 over Gibbs Creek, 5.0 miles northwest of Shattuc. | — | Executed | Depew and Owen Builders, Inc. $536,588 · | ||
| Mar 5, 2021 | 76N92 | ClintonDistrict 8 | 0.67 miles of resurfacing along Ferrin Road / County Highway 3 from US 50 to Louis Street. | — | Executed | The Kilian Corporation $166,969 · | ||
| Mar 5, 2021 | 76P11 | ClintonDistrict 8 | Bridge painting on IL 161 over Wilken Lake, 0.5 miles east of Germantown (SN 014-0009) and over Shoal Creek overflow, 0.6 miles east of Germantown (SN 014-0010). | — | Executed | Eagle Painting & Maintenance Company, Inc. $319,658 · | ||
| Apr 23, 2021 | 76N78 | ClintonDistrict 8 | Crack and joint sealing on IL 127 from the Bond County line to 0.2 miles north of Williams Road. | — | Executed | Freehill Asphalt, Inc. $151,361 · | ||
| Jun 11, 2021 | 76N84 | ClintonDistrict 8 | 0.8 miles of Bureau of Research test pavement alongside US 50 from Crackerneck Road to Russland Road. | — | Executed | Baxmeyer Construction, Inc. $3,239,778 · | ||
| Sep 17, 2021 | 76P38 | ClintonDistrict 8 | 2.6 miles of resurfacing on Old US 50 from 0.2 miles west of Carter Street to 0.6 miles east of Pipeline Road. | — | Executed | The Kilian Corporation $518,909 · | ||
| Nov 5, 2021 | 76P54 | ClintonDistrict 8 | 4.5 miles of resurfacing on IL 161 from Albers Road to Hanover Street in Germantown. | — | Executed | Christ Bros. Asphalt, Inc. $1,222,498 · | ||
| Jan 21, 2022 | 76P20 | ClintonDistrict 8 | Crack and joint sealing on Slant Road from IL 161 to IL 127. | — | Executed | Freehill Asphalt, Inc. $117,048 · | ||
| Apr 29, 2022 | 76P59 | ClintonDistrict 8 | Box culvert replacement on US 50 over a drainage ditch, 0.5 miles east of Huey Road. | — | Executed | DMS Contracting, Inc. $242,608 · | ||
| Jun 17, 2022 | 76P79 | ClintonDistrict 8 | Bridge joint replacement and repairs on SN 014-0063 carrying IL 127 over Flat Branch Creek, 8.1 miles north of Carlyle. | — | Executed | Keller Construction, Inc. $545,545 · | ||
| Aug 5, 2022 | 97784 | ClintonDistrict 8 | Hot-Mix asphalt resurfacing and shoulder widening on Germantown Road from the Breese city limits to the Germantown city limits, and Hot-Mix asphalt removal and resurfacting within the city limits of each municpality. | — | Executed | Christ Bros. Asphalt, Inc. $1,991,478 · | ||
| Jan 20, 2023 | 76R86 | ClintonDistrict 8 | 160- of HMA surface removal and overlay on eastbound I-64 over Sugar Creek Overflow and Sugar Creek, west of Damiansville. (SN 014-0040 and SN 014-0042) | — | Executed | The Kilian Corporation $101,479 · | ||
| Mar 10, 2023 | 76M44 | ClintonDistrict 8 | Culvert replacement on Old US 50, 0.5 miles west of IL 160. (SN 014-2435) | — | Executed | Stutz Excavating, Inc. $141,088 · | ||
| Apr 28, 2023 | 76R76 | ClintonDistrict 8 | 0.8 miles of patching and resurfacing along Collins Street/Huey Road/County Highway 4 from US 50 to 0.2 miles south of Sherman Street. | — | Executed | Howell Paving, Inc. $413,967 · | ||
| Jun 16, 2023 | 76R74 | ClintonDistrict 8 | Pavement patching and resurfacing on the ramp between US 50 and St. Rose Road. | — | Executed | Christ Bros. Asphalt, Inc. $263,913 · | ||
| Sep 22, 2023 | 76R64 | ClintonDistrict 8 | Bridge joint replacement and repair on SN 014-0015 carrying IL 127 over NS Railroad, 0.2 miles north of IL 161. | — | Executed | Keeley & Sons, Inc. $429,291 · | ||
| Jan 19, 2024 | 97818 | ClintonDistrict 8 | HMA resurfacing with patching, incedental resurfacing at sideroads and entrances, and aggregate shoulders on CH 8 from IL 161 to 0.30 mile north of I-64. | — | Executed | The Kilian Corporation $1,003,243 · | ||
| Apr 26, 2024 | 76T32 | ClintonDistrict 8 | 0.7 miles of patching and resurfacing on IL 161 from 0.3 miles west of Red Fox Road to 0.1 miles east of Church Steeple Road. | — | Executed | The Kilian Corporation $721,636 · | ||
| Apr 26, 2024 | 76T40 | ClintonDistrict 8 | Bridge painting on US 50 under Schumacher Road, 5 miles east of Trenton (SN 014-0050), and on IL 127 over Flat Branch Creek, 8.1 miles north of Carlyle (SN 014 0063). | — | Executed | Civil Coatings and Construction Inc. $376,650 · | ||
| Nov 8, 2024 | 76N47 | ClintonDistrict 8 | Turn lane widening, resurfacing and culvert replacement and extensions on IL 160 at Wesclin Road, approximately 1.75 miles north of New Baden. | — | Executed | The Kilian Corporation $2,978,735 · | ||
| Apr 25, 2025 | 97861 | ClintonDistrict 8 | Resurfacing on Aviston Road from Old US Highway 50 to IL 161. | — | Executed | Christ Bros. Asphalt, Inc. $2,147,938 · | ||
| Jun 13, 2025 | 76U25 | ClintonMadisonSt. ClairDistrict 8 | Traffic signal modernization at various locations throughout District 8. | — | Executed | Gerstner Electric, Inc. $669,700 · | ||
| Aug 1, 2025 | 97867 | ClintonDistrict 8 | Construct a single-span PPC deck beam bridge to carry CH 20 (Lake Road) over Bond Branch, 1 mile northeast of Carlyle. | — | Executed | C-Hill Civil Contractors, Inc. $729,988 · | ||
| Sep 19, 2025 | 76R08 | ClintonDistrict 8 | 1.3 miles of resurfacing and ADA improvements on Old US 50, 0.6 miles east of Pipeline Road to 13th Street in Carlyle. | — | Executed | Howell Paving, Inc. $1,023,182 · | ||
| Apr 24, 2026 | 76U93 | ClintonDistrict 8 | 0.9 miles of Bureau of Research test pavement alongside US 50 from Crackerneck Road to Russland Road. | — | Executed | Evergreen Roadworks, LLC $130,702 · | ||
| Jun 12, 2026 | 76V18 | ClintonSt. ClairDistrict 8 | 6.5 miles of longitudinal joint repair on I-64 from 0.5 miles west of IL 4 in Mascoutah to 0.3 miles east of the Clinton County line. | — | Executed | The Kilian Corporation $3,286,837 · | ||
| Jul 31, 2026 | 46949 | ClintonDistrict 8 | Resurfacing parking areas with PCC surface, sidewalk construction and drainage improvements at Eldon State Recreational Area. | — | Executed | McCarthy Improvement Company $2,907,718 · | ||
| Sep 18, 2026 | 76V26 | ClintonDistrict 8 | 4.4 miles of resurfacing on US 50 from 11th Street in Carlyle to Huey Road. | — | Executed |
1–58 of 58
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.