Filtered by: County: Bureau Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 15, 2021 | 66K95 | BureauDistrict 3 | The removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert This work is located on FAP 698 (IL 89) 0.3 miles north of E. Walnut St. in Ladd at station 564+45 in Bureau County. This work consists of the removal of a quadruple (4) CMP 24" DIA culvert and replacement with a double (2) PPC 24" DIA pipe culvert with guardrail removal. | — | Executed | R & R Landscaping & Irrigation $75,446 · | ||
| Jan 15, 2021 | 66L24 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0153, IL 92 over a stream, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. | — | Executed | Three Star Painting, Inc. $145,136 · | ||
| Jan 15, 2021 | 66L25 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0128, TR 333 over 1-180, approximately 3.3 miles West of US 34 in Bureau County. This work consists of bridge painting. | — | Executed | ERA-Valdivia Contractors, Inc. $208,017 · | ||
| Jan 15, 2021 | 66L26 | BureauDistrict 3 | Bridge painting This work is located at Structure No. 006-0041 (SB), 006-0042 (NB), approximately 2.54 miles North of IL 26 and Structure No. 006-0043 (NB), 006-0044 (SB), approximately 2.04 miles North of IL 26 in Bureau County. This work consists of bridge painting. | — | Executed | Three Star Painting, Inc. $651,622 · | ||
| Jan 15, 2021 | 66L44 | BureauLivingstonDistrict 3 | The work consists on performing Bridge Deck Concrete sealing at various bare concrete bridge decks in Bureau and Livingston counties. | — | Executed | All States Painting, Inc. $177,640 · | ||
| Jan 15, 2021 | 87745 | BureauDistrict 3 | Resurfacing CH 19 from Angling Road to US 6. | — | Executed | Advanced Asphalt Company $1,111,251 · | ||
| Apr 23, 2021 | 66E14 | BureauDistrict 3 | 3P mill and resurface. | — | Executed | Advanced Asphalt Company $4,496,640 · | ||
| Apr 23, 2021 | 66K60 | BureauDistrict 3 | 7.3 miles of milling and resurfacing, ADA improvements. | — | Executed | Advanced Asphalt Company $2,816,475 · | ||
| Apr 23, 2021 | 66L32 | BureauDistrict 3 | The installation of approximately 5 This project consists of the installation of approximately 5.24 miles of high tension cable median barrier from the Henry/Bureau County Line to 0.42 miles West of 600E Rd. | — | Executed | Advanced Asphalt Company $1,112,433 · | ||
| Apr 23, 2021 | 66L62 | BureauLaSalleDistrict 3 | The intent of this project is to repair and maintain traffic signals, flashing beacons, roadway lighting, and other electrical services that are requested by "on call" work orders in Bureau and LaSalle Counties. | — | Executed | Laser Electric, Inc. $71,890 · | ||
| Apr 23, 2021 | 66L70 | BureauDistrict 3 | Weed spraying to aid in weed control This project is located along FAI 80 (I-80) in Bureau county. The work consists of weed spraying to aid in weed control. | — | Executed | Endrizzi Contracting, Inc $99,891 · | ||
| Apr 23, 2021 | 87764 | BureauDistrict 3 | Replace the bridge carrying CH 24 over a branch of Pond Creek, 2 miles south of Wyanet. | — | Executed | D. Construction, Inc. $338,614 · | ||
| Jun 11, 2021 | 66A96 | BureauDistrict 3 | 3P Milling and Resurfacing (Design Overlay), spot guardrail improvement and minor drainage improvement on US 6 from IL 26 South in Princeton to IL 89 North in Spring Valley. | — | Executed | Advanced Asphalt Company $5,946,378 · | ||
| Jun 11, 2021 | 66L60 | BureauDistrict 3 | Class B pavement patching and pavement striping This work is location on FAI 80 ( I-80) beginning at the I -80 and I -180 Interchange and ending at the I -80 and IL 89 Interchange. This work consists of Class B pavement patching and pavement striping. | — | Executed | G. M. Sipes Construction, Inc. $294,924 · | ||
| Jun 11, 2021 | 87762 | BureauDistrict 3 | Replace the bridge carrying TR 130 over Silver Creek, 7.0 miles southeast of Buda. | — | Executed | Curnyn Construction Co. $311,681 · | ||
| Jul 30, 2021 | 87781 | BureauDistrict 3 | Repair the undermining at the abutments and install improved drainage at the bridge carrying Peru Road over Negro Creek, just south of US 6. | — | Executed | D. Construction, Inc. $198,183 · | ||
| Sep 17, 2021 | 66M08 | BureauLaSalleDistrict 3 | The installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and th This project consists of the installation of four changeable speed warning signs on the outer interchange ramps at I-80 and I-39 and three changeable speed warning signs at the I-80 and I-180 interchange. | — | Executed | T.M.F. Construction Company $71,655 · | ||
| Nov 5, 2021 | 66H26 | BureauDistrict 3 | The project is a bridge replacement over the Hennepin Feeder Canal located on IL 92, 1 mile East of IL 172 in Bureau County. The profile grade will be raised approx 5'-10", therefore, additional work such as guardrail upgrades, embankment, etc is expected. Work within IDNR property is also proposed. Construction shall be achieved via Detour. | — | Executed | Civil Constructors, Inc. d/b/a/ Helm Civil $2,548,314 · | ||
| Nov 5, 2021 | 66J01 | BureauDistrict 3 | Removal and replacement of superstructures on SN 006-0014 and 006-0015, milling and resurfacing of mainline an This project is located on FAI 80 (I-80) at the Maple Grove Creek crossing, approximately 2 miles north of Wyanet, in Bureau County. The work consists of removal and replacement of superstructures on SN 006-0014 and 006-0015, milling and resurfacing of mainline and shoulders, guardrail removal and replacement, and other work. | — | Executed | D. Construction, Inc. $2,541,583 · |
1–19 of 19
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.