18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 7, 2018 | 0471-05-047STP 1802(543)HES | Bastrop Austin |
IMPROVE GUARDRAIL TO DESIGN STANDARDSSH 21 · | $1,880,236 | $2,157,229 | 3LW CIVIL LLC | +14.7% | 4 |
| Aug 7, 2018 | 6330-47-001RMC - 633047001 | Dallas Dallas |
SWEEPING & DEBRIS REMOVALUS 175 · | $2,769,307 | $2,119,604 | PANNELL INDUSTRIES, INC. | -23.5% | 3 |
| Aug 7, 2018 | 0043-08-075NH 1802(303) | Wichita Wichita Falls |
INSTALL MEDIAN BARRIERUS 287 · | $2,415,817 | $2,014,723 | SCR CIVIL CONSTRUCTION, LLC | -16.6% | 7 |
| Aug 7, 2018 | 6328-20-001RMC - 632820001 | Ellis Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 287 · | $2,423,274 | $1,981,809 | FOUTSCO PAVING COMPANY, LLC | -18.2% | 5 |
| Aug 7, 2018 | 0271-06-120NH 1802(603) | Harris Houston |
EROSION REP AND CHANNEL PROTECTIONIH 10 · | $2,119,850 | $1,785,427 | SJ&J CONSTRUCTION, LLC | -15.8% | 6 |
| Aug 7, 2018 | 2653-01-014C 2653-1-14 | Rusk Tyler |
FLEX BASE, TCST, MILL & INLAY, PV MKFM 2658 · | $1,406,839 | $1,667,777 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +18.5% | 6 |
| Aug 7, 2018 | 0081-05-044SSW 81-5-44 | Denton Dallas |
BASE, ASP, PVT MRKFM 3524 · | $1,742,512 | $1,667,507 | THE LANE CONSTRUCTION CORPORATION | -4.3% | 4 |
| Aug 7, 2018 | 6329-75-001RMC - 632975001 | Dallas Dallas |
SWEEPING & DEBRIS REMOVALSL 12 · | $2,010,981 | $1,602,928 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -20.3% | 2 |
| Aug 7, 2018 | 0374-08-021C 374-8-21 | Culberson El Paso |
COUNTERMEASURE FOR BRIDGE SCOURUS 62 · | $1,332,176 | $1,434,496 | DAN WILLIAMS COMPANY | +7.7% | 5 |
| Aug 7, 2018 | 0174-04-035STP 1802(491)HESG | Fannin Paris |
SAFETY RELATED PROJECTSFM 79 · | $1,454,159 | $1,412,114 | TOTAL HIGHWAY MAINTENANCE, LLC | -2.9% | 3 |
| Aug 7, 2018 | 0016-08-036NH 1802(611) | Bexar San Antonio |
INTERSECTION OPERATIONAL IMPROVEMENTSSL 368 · | $1,390,323 | $1,345,680 | E-Z BEL CONSTRUCTION, LLC | -3.2% | 3 |
| Aug 7, 2018 | 6333-44-001RMC - 633344001 | Bowie Atlanta |
CALLOUT PAVEMENT MARKINGSUS 59 · | $1,443,040 | $1,281,188 | STRIPE-A-ZONE, INC. | -11.2% | 4 |
| Aug 7, 2018 | 0134-12-005STP 1802(548) | Wise Fort Worth |
BASE RPR, MILL, OVERLAY, PAVMT MARKBU 380F · | $1,003,676 | $963,087 | FOUTSCO PAVING COMPANY, LLC | -4.0% | 6 |
| Aug 7, 2018 | 6332-48-001RMC - 633248001 | Washington Bryan |
METAL BEAM GUARD FENCE REPAIRUS 290 · | $692,330 | $883,852 | ISI CONTRACTING, INC. | +27.7% | 1 |
| Aug 7, 2018 | 6326-76-001BPM - 632676001 | Victoria Yoakum |
DISTRICTWIDE BEAM AND EROSION REPAIRSUS 59 · | $1,009,938 | $877,085 | DRS CONSTRUCTION, INC. | -13.2% | 6 |
| Aug 7, 2018 | 6332-58-001RMC - 633258001 | Cameron Pharr |
FM MOWINGFM 1847 · | $646,760 | $849,303 | R&M INCORPORATED | +31.3% | 2 |
| Aug 7, 2018 | 0073-08-194NH 1802(615) | Bexar San Antonio |
LANSCAPE PLANTING AND IRRIGATIONIH 37 · | $998,769 | $771,555 | APEX LANDSCAPE & IRRIGATION, LLC | -22.7% | 4 |
| Aug 7, 2018 | 0907-00-191NH 1802(736) | Tom Green San Angelo |
UPGRADE SMALL SIGNSVA · | $828,917 | $695,351 | JASCO | -16.1% | 3 |
| Aug 7, 2018 | 6331-78-001RMC - 633178001 | Grayson Paris |
ON CALL METAL BEAM GUARD FENCE REPAIRUS 82 · | $771,265 | $676,489 | K-BAR SERVICES, INC. | -12.3% | 2 |
| Aug 7, 2018 | 6333-67-001RMC - 633367001 | Harrison Atlanta |
INSTALLATION OF PAVEMENT MARKINGSUS 80 · | $712,868 | $612,675 | STRIPING TECHNOLOGY, L.P. | -14.1% | 4 |
| Aug 7, 2018 | 0018-04-060STP 1802(358)HES | Webb Laredo |
INSTALL FLASHING BEACONIH 35 · | $453,414 | $521,315 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +15.0% | 2 |
| Aug 7, 2018 | 0909-29-040BR 1702(407) | Hamilton Waco |
REPL BR & APPRSCR · | $548,441 | $495,665 | ELLIS-MCGINNIS CONSTRUCTION CO. | -9.6% | 6 |
| Aug 7, 2018 | 0909-38-071BR 1702(197) | Falls Waco |
REPL BR & APPRSCR · | $512,191 | $439,500 | ELLIS-MCGINNIS CONSTRUCTION CO. | -14.2% | 7 |
| Aug 7, 2018 | 6332-20-001RMC - 633220001 | Waller Houston |
BRIDGE DECK REPAIRUS 290 · | $460,620 | $427,450 | MAIN LANE INDUSTRIES LTD. | -7.2% | 4 |
| Aug 7, 2018 | 6331-63-001RMC - 633163001 | Hill Waco |
HOT APPLICATION CRACK SEALFM 1946 · | $552,706 | $425,927 | D & M CONTRACTORS, LLC | -22.9% | 4 |
| Aug 7, 2018 | 0110-04-199BR 1802(601) | Montgomery Houston |
REPLACE/RESET BEARING PADS, REPLACE BRIDGE DECKIH 45 · | $970,720 | $405,278 | ISI CONTRACTING, INC. | -58.2% | 5 |
| Aug 7, 2018 | 0005-04-079NH 1802(782) | Martin Odessa |
BRIDGE DEMOLITIONIH 20 · | $335,835 | $377,597 | NEW WORLD CONTRACTING, LLC | +12.4% | 7 |
| Aug 7, 2018 | 6329-46-001RMC - 632946001 | Kaufman Dallas |
POTHOLE REPAIRIH 20 · | $420,260 | $369,840 | DBI SERVICES, LLC | -12.0% | 3 |
| Aug 7, 2018 | 0921-06-303STP 1802(565)TP | Cameron Pharr |
CONST SIDEWALKS, CROSSWALKS,& PATHSVA · | $314,245 | $361,733 | ARANDA BROTHERS CONSTRUCTION CO., INC. | +15.1% | 3 |
| Aug 7, 2018 | 0117-01-052STP 1802(744)HES | Brazos Bryan |
MODERNIZE INTERSECT TRAFFIC SIGNALUS 190 · | $313,763 | $321,353 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | +2.4% | 3 |
| Aug 7, 2018 | 1407-03-018STP 1802(577)HES | Nacogdoches Lufkin |
IMPROVE TRAFFIC SIGNALFM 1275 · | $206,693 | $260,154 | STRIPING TECHNOLOGY, L.P. | +25.9% | 2 |
| Aug 7, 2018 | 0017-10-287STP 1802(438)HES | Bexar San Antonio |
WRONG WAY DRIVER ADVANCED TECHNOLOGIESIH 35 · | $152,693 | $247,299 | THE LEVY COMPANY, INC. | +62.0% | 2 |
| Aug 7, 2018 | 0910-16-145STP 1802(757) | Smith Tyler |
PLANTING TREES AND SHRUBSVA · | $169,546 | $131,480 | TIGHT LINE CONSTRUCTION, LLC | -22.5% | 8 |
| Aug 7, 2018 | 2296-01-052STP 1802(583)HES | Ector Odessa |
WRONG WAY DRIVER WARNING SIGNSSH 191 · | $177,385 | $62,229 | WILLIS ELECTRIC CO., LP | -64.9% | 7 |
| Aug 6, 2018 | 6331-35-001RMC - 633135001 | Zapata Pharr |
PARKING LOT IMPROVEMENTS,CONCRETE REPAIRS,ETCSH 16 · | $275,065 | $329,370 | VALLEY INFRASTRUCTURE, INC. | +19.7% | 1 |
| Jul 31, 2018 | 6334-12-001RMC - 633412001 | Potter Amarillo |
CLEANING AND SWEEPING HIGHWAYSUS 87 · | $179,789 | $163,895 | PANHANDLE SWEEPING & MAINTENANCE, LLC | -8.8% | 1 |
| Jul 26, 2018 | 6333-72-001RMC - 633372001 | El Paso El Paso |
PICNIC MAINTENANCEIH 10 · | $55,120 | $61,644 | MESA D CORP. | +11.8% | 2 |
| Jul 26, 2018 | 6333-17-001RMC - 633317001 | El Paso El Paso |
PICNIC MAINENANCEUS 62 · | $44,230 | $43,298 | MESA D CORP. | -2.1% | 3 |
| Jul 24, 2018 | 6333-81-001RMC - 633381001 | Refugio Corpus Christi |
MOWING HIGHWAY RIGHT OF WAYUS 77 · | $204,972 | $223,563 | MISSOURI-TEXAS FARMS, LTD. | +9.1% | 2 |
| Jul 19, 2018 | 6329-36-001RMC - 632936001 | Grayson Paris |
CRACK SEALUS 75 · | $256,645 | $200,055 | D & M CONTRACTORS, LLC | -22.0% | 5 |
| Jul 19, 2018 | 6329-37-001RMC - 632937001 | Hopkins Paris |
CRACK SEALIH 30 · | $136,860 | $111,708 | D & M CONTRACTORS, LLC | -18.4% | 8 |
| Jul 19, 2018 | 6332-56-001RMC - 633256001 | Hunt Paris |
ON CALL POTHOLE REPAIRIH 30 · | $75,000 | $99,750 | CATOCON, INC. | +33.0% | 4 |
| Jul 19, 2018 | 6331-38-001RMC - 633138001 | Fannin Paris |
PICNIC AREA AND GROUNDS MAINTENANCESH 78 · | $37,115 | $31,493 | KRB MOWING SERVICE, LLC | -15.1% | 4 |
| Jul 18, 2018 | 6327-67-001RMC - 632767001 | San Jacinto Lufkin |
GUARD FENCE, ATTENUATOR & METAL RAIL RPRUS 59 · | $196,575 | $176,695 | P-VILLE, INCORPORATED | -10.1% | 2 |
| Jul 17, 2018 | 6330-03-001RMC - 633003001 | Brazos Bryan |
SIGN MAINTENANCESH 6 · | $276,250 | $298,500 | VACA UNDERGROUND UTILITIES INC | +8.1% | 1 |
| Jul 17, 2018 | 6331-67-001RMC - 633167001 | Wichita Wichita Falls |
DW ONCALL TMAUS 287 · | $255,000 | $285,000 | BRYDL CONTRACTING, INC. | +11.8% | 1 |
| Jul 17, 2018 | 6333-53-001RMC - 633353001 | Lamb Lubbock |
GUARDRAIL REPAIRUS 84 · | $278,250 | $276,585 | BARRICADES UNLIMITED | -0.6% | 1 |
| Jul 17, 2018 | 6333-54-001RMC - 633354001 | Terry Lubbock |
GUARDRAIL REPAIRUS 82 · | $278,250 | $276,585 | BARRICADES UNLIMITED | -0.6% | 1 |
| Jul 17, 2018 | 6333-55-001RMC - 633355001 | Hale Lubbock |
GUARDRAIL REPAIRIH 27 · | $278,250 | $276,585 | BARRICADES UNLIMITED | -0.6% | 1 |
| Jul 17, 2018 | 6327-02-001RMC - 632702001 | Williamson Austin |
CRACK SEALING AND ASPHALT PAVEMENTUS 79 · | $246,083 | $215,741 | CHAMPION INFRASTRUCTURE, LLC | -12.3% | 4 |
| Jul 17, 2018 | 6327-44-001RMC - 632744001 | Denton Dallas |
TREE TRIMMING & BRUSH REMOVALFM 2164 · | $271,719 | $211,585 | NATURAL COLORS PAINTING LLC. | -22.1% | 3 |
| Jul 17, 2018 | 6330-69-001RMC - 633069001 | McLennan Waco |
CLEANING AND SWEEPING HIGHWAYSUS 84 · | $174,874 | $155,342 | ELITE WASTE & CONSTRUCTION SERVICES LLC | -11.2% | 4 |
| Jul 17, 2018 | 6327-08-001RMC - 632708001 | Burnet Austin |
CRACK SEALING OF ASPHALT PAVEMENTUS 281 · | $203,150 | $138,729 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -31.7% | 4 |
| Jul 17, 2018 | 6327-07-001RMC - 632707001 | Bastrop Austin |
CRACK SEALING OF ASPHALT PAVEMENTUS 290 · | $177,780 | $134,832 | FYL ENTERPRISES, LLC | -24.2% | 4 |
| Jul 17, 2018 | 6326-34-001RMC - 632634001 | Montgomery Houston |
DRAINAGE SYSTEM CLEANINGIH 45 · | $102,825 | $122,150 | AIMS COMPANIES | +18.8% | 1 |
| Jul 17, 2018 | 6327-09-001RMC - 632709001 | Travis Austin |
CRACK SEALING OF ASPHALT PAVEMENTUS 183 · | $126,060 | $111,842 | FYL ENTERPRISES, LLC | -11.3% | 3 |
| Jul 17, 2018 | 6332-40-001RMC - 633240001 | Crosby Lubbock |
DRAINAGE STRUCTURE REPLACEMENTFM 651 · | $50,520 | $91,574 | FNH CONSTRUCTION, LLC | +81.3% | 3 |
| Jul 17, 2018 | 6329-94-001RMC - 632994001 | Brazoria Houston |
CULVERT REPLACEMENTFM 1462 · | $103,101 | $86,622 | 2K CONTRACTING, INC. | -16.0% | 4 |
| Jul 17, 2018 | 6332-80-001RMC - 633280001 | Milam Bryan |
PICNIC AREA MAINTENANCEUS 79 · | $35,700 | $31,250 | ABOVE ALL CONSTRUCTION | -12.5% | 4 |
| Jul 11, 2018 | 0739-02-162NH 1802(413) | Jefferson Beaumont |
WIDEN FREEWAY FROM 4 TO 6 LANESIH 10 · | $131,944,009 | $128,399,060 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | -2.7% | 5 |
| Jul 11, 2018 | 0102-16-001STP 2018(201) | Nueces Corpus Christi |
CONSTRUCT RELIEF ROUTE AROUND DRISCOLLUS 77 · | $120,620,670 | $118,322,898 | ZACHRY CONSTRUCTION CORPORATION | -1.9% | 5 |
| Jul 11, 2018 | 2100-01-054NH 1802(401) | Travis Austin |
RECONSTRUCT 4-LN ROADWAY TO 6-LN DIVIDED_ROADWAYRM 2222 · | $20,429,914 | $23,618,553 | CAPITAL EXCAVATION COMPANY | +15.6% | 3 |
| Jul 11, 2018 | 0463-04-026NH 1802(312) | Glasscock San Angelo |
ACP OVERLAYSH 158 · | $19,682,228 | $20,119,919 | RK HALL, LLC | +2.2% | 5 |
| Jul 11, 2018 | 0543-02-065C 543-2-65 | Fort Bend Houston |
WIDEN FROM 2 TO 4 LANES DIVIDED ROADWAYFM 359 · | $18,935,772 | $18,950,220 | SER CONSTRUCTION PARTNERS, LLC | +0.1% | 7 |
| Jul 11, 2018 | 3026-01-026STP 2018(633) | San Patricio Corpus Christi |
UPGRADE TO 5-LANE URBAN ROADWAYFM 2986 · | $19,105,024 | $17,126,620 | BAY LTD. | -10.4% | 4 |
| Jul 11, 2018 | 0027-06-051STP 2013(736) | Fort Bend Houston |
ADD 10-FT SHLDRS, O/L & REPLACE BRIDGE CULVERTSUS 90A · | $15,750,592 | $13,229,156 | DURWOOD GREENE CONSTRUCTION CO. | -16.0% | 4 |
| Jul 11, 2018 | 6316-09-001RMC - 631609001 | Galveston Houston |
FERRY LANDING MAINTENANCESH 87 · | $15,170,822 | $12,737,490 | TEXAS GULF CONSTRUCTION COMPANY, INC. | -16.0% | 3 |
| Jul 11, 2018 | 0215-06-039NH 1802(389) | Kendall San Antonio |
EXPAND 2 LANES TO 4 LANES WITH MEDIAN OR CLTLSH 46 · | $11,152,199 | $11,999,322 | HUNTER INDUSTRIES, LTD. | +7.6% | 6 |
| Jul 11, 2018 | 0064-08-057NH 1802(032) | Jasper Beaumont |
OVERLAY EXISTING ROADWAYUS 96 · | $10,834,992 | $11,208,279 | OLDCASTLE MATERIALS TEXAS, INC. | +3.4% | 3 |
| Jul 11, 2018 | 0184-01-063C 184-1-63 | Coryell Waco |
WDN RDWY & ADD PASS LNSSH 36 · | $12,492,719 | $11,187,471 | BIG CREEK CONSTRUCTION, LTD. | -10.4% | 5 |
| Jul 11, 2018 | 2374-02-147BR 1802(379) | Dallas Dallas |
REPLACE BRIDGE DECK & REPAIR BRIDGE DECKIH 635 · | $7,643,991 | $9,213,870 | SEMA CONSTRUCTION, INC. | +20.5% | 2 |
| Jul 11, 2018 | 0751-02-026STP 1802(747) | Kaufman Dallas |
RECONSTRUCT, ADD SHOULDERS, AND TEXTURIZE ROADWAYFM 148 · | $9,233,560 | $7,818,547 | A. L. HELMCAMP, INC. | -15.3% | 6 |
| Jul 11, 2018 | 0392-01-073STP 1802(323) | Morris Atlanta |
PLANING, ACP & PAVEMENT MARKINGSUS 259 · | $6,789,000 | $7,028,105 | EAST TEXAS BRIDGE, INC. | +3.5% | 3 |
| Jul 11, 2018 | 0907-00-170STP 1802(384) | Tom Green San Angelo |
BRIDGE SAFETY IMPROVEMENTS AND MAINTENANCEVA · | $8,633,139 | $6,779,028 | RELMCO, INC. | -21.5% | 3 |
| Jul 11, 2018 | 0015-08-140NH 1802(398) | Williamson Austin |
STRCT, GRADING, HMACPIH 35 · | $7,792,810 | $6,748,949 | CAPITAL EXCAVATION COMPANY | -13.4% | 7 |
| Jul 11, 2018 | 0005-15-088NH 2018(619) | Midland Odessa |
REVERSAL OF EB ON/OFF RAMPSIH 20 · | $4,647,164 | $4,875,448 | REECE ALBERT, INC. | +4.9% | 3 |
| Jul 11, 2018 | 1091-03-012STP 1802(376) | Rockwall Dallas |
RESTORE EXISTING PAVEMENT AND ADD SHOULDERSFM 1140 · | $3,968,492 | $4,349,077 | ED BELL CONSTRUCTION COMPANY | +9.6% | 4 |
| Jul 11, 2018 | 2657-01-031C 2657-1-31 | Lamar Paris |
REHABILITATION OF EXISTING ROADFM 2648 · | $4,717,429 | $4,044,599 | A. K. GILLIS & SONS, INC. | -14.3% | 7 |
| Jul 11, 2018 | 0039-16-066C 39-16-66 | Cameron Pharr |
OVERLAY (FRONTAGE ROADS)IH 69E · | $3,981,852 | $3,781,272 | FOREMOST PAVING, INC. | -5.0% | 5 |
| Jul 11, 2018 | 0164-04-160C 164-4-160 | Smith Tyler |
PLANING, PAVEMENT REPAIR, OCST, PV MKSH 31 · | $3,982,129 | $3,587,845 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -9.9% | 3 |
| Jul 11, 2018 | 0320-05-015C 320-5-15 | Bell Waco |
MILL/SEAL/OVLYSL 363 · | $3,072,993 | $2,938,131 | BIG CREEK CONSTRUCTION, LTD. | -4.4% | 5 |
| Jul 11, 2018 | 2654-01-022SSW 2654-1-22 | Smith Tyler |
GR, FLX BS, OCST, STRS, PVT MRKFM 2661 · | $3,220,825 | $2,792,589 | LONGVIEW BRIDGE AND ROAD, LTD. | -13.3% | 6 |
| Jul 11, 2018 | 0751-02-025BR 1802(375) | Kaufman Dallas |
REPLACE BRIDGE AND APPROACHESFM 148 · | $3,151,752 | $2,718,728 | B & E CONSTRUCTION INC | -13.7% | 11 |
| Jul 11, 2018 | 0683-07-008NH 1802(399) | Travis Austin |
LANDSCAPING AND IRRIGATIONSH 45 · | $2,847,869 | $2,711,897 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -4.8% | 4 |
| Jul 11, 2018 | 3199-01-008SSW 3199-1-8 | Anderson Tyler |
GR, BS, OCST, ACP SURF, STRS, PV MKFM 2054 · | $2,849,016 | $2,573,742 | A. L. HELMCAMP, INC. | -9.7% | 8 |
| Jul 11, 2018 | 0922-00-064STP 1802(313) | Webb Laredo |
BRIDGE RAIL,SET,MBGF,SGTVA · | $2,121,686 | $2,482,190 | RELMCO, INC. | +17.0% | 3 |
| Jul 11, 2018 | 0194-01-014STP 1802(316)HESG | Cooke Wichita Falls |
INCREASE SUPERELEVATION, EDGELINE RUMBLE STRIPSIH 35 · | $1,786,213 | $2,349,139 | JAGOE-PUBLIC COMPANY | +31.5% | 1 |
| Jul 11, 2018 | 1685-05-118NH 1802(411) | Harris Houston |
ADA CURB RAMPS AND SIDEWALKSSH 6 · | $2,688,366 | $2,270,623 | MBN ENTERPRISES LLC | -15.5% | 4 |
| Jul 11, 2018 | 0357-05-025STP 1802(471)HES | Armstrong Amarillo |
GUARDRAIL IMPROVEMENTSSH 207 · | $2,343,864 | $2,257,957 | HJC FARMS, INC. | -3.7% | 5 |
| Jul 11, 2018 | 0092-13-028NH 1802(373) | Navarro Dallas |
FLEXIBLE PAVEMENT REPAIRBI 45-F · | $1,990,109 | $2,108,967 | O. TREVINO CONSTRUCTION, LLC | +6.0% | 4 |
| Jul 11, 2018 | 2362-01-036C 2362-1-36 | McLennan Waco |
SEAL & OVERLAYSL 340 · | $1,847,786 | $2,101,672 | KNIFE RIVER CORPORATION - SOUTH | +13.7% | 3 |
| Jul 11, 2018 | 0114-08-035STP 1802(396)HES | Fayette Yoakum |
SAFETY TREAT FIXED OBJECTSUS 290 · | $2,020,953 | $2,098,141 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +3.8% | 4 |
| Jul 11, 2018 | 0143-10-052NH 1802(473) | Victoria Yoakum |
PAVEMENT REPAIR AND RESURFACINGUS 87 · | $2,248,288 | $2,084,720 | HUNTER INDUSTRIES, LTD. | -7.3% | 2 |
| Jul 11, 2018 | 0421-01-045STP 1802(403) | Medina San Antonio |
GRD, BSE,SURF, PAV'T MARKINGSSH 173 · | $2,223,438 | $2,041,003 | HUNTER INDUSTRIES, LTD. | -8.2% | 10 |
| Jul 11, 2018 | 0014-05-039C 14-5-39 | Hill Waco |
MISC SPOT PAVEMENT REPAIRSSH 81 · | $1,956,234 | $1,999,585 | OLDCASTLE MATERIALS TEXAS, INC. | +2.2% | 4 |
| Jul 11, 2018 | 2121-04-086C 2121-4-86 | El Paso El Paso |
REHABILITATIONIH 10 · | $2,429,473 | $1,988,430 | DAN WILLIAMS COMPANY | -18.2% | 5 |
| Jul 11, 2018 | 0533-01-020C 533-1-20 | Burnet Austin |
LEVEL-UP AND SEAL COATPR 4 · | $2,239,341 | $1,963,010 | LONE STAR PAVING COMPANY | -12.3% | 7 |
| Jul 11, 2018 | 0114-12-011NH 2018(900) | Harris Houston |
LANDSCAPE ENHANCEMENTSUS 290 · | $2,262,392 | $1,742,751 | YELLOWSTONE LANDSCAPE - CENTRAL, INC. | -23.0% | 4 |
| Jul 11, 2018 | 1986-01-063C 1986-1-63 | Montgomery Houston |
BASE REPAIR, OCST, LEVEL UP, OVERLAYFM 1314 · | $2,113,840 | $1,738,187 | SMITH & COMPANY | -17.8% | 4 |
| Jul 11, 2018 | 0120-01-019C 120-1-19 | Hamilton Waco |
MISC SPOT PAVEMENT REPAIRSH 22 · | $1,725,935 | $1,642,122 | OLDCASTLE MATERIALS TEXAS, INC. | -4.9% | 5 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.