| 1 | 161-6022 |
GENERAL USE COMPOST (4") | 74,601 | SY |
$3.00 |
$5.17 |
$3.38 |
$3.00 |
|
| 2 | 170-6006 |
IRRIGATION SYSTEM LOCATION A | 1 | LS |
$300,000.00 |
$307,017.54 |
$210,000.00 |
$400,000.00 |
|
| 3 | 170-6007 |
IRRIGATION SYSTEM LOCATION B | 1 | LS |
$110,000.00 |
$185,279.28 |
$69,000.00 |
$100,000.00 |
|
| 4 | 180-6001 |
WILDFLOWER SEEDING | 28.5 | AC |
$1,500.00 |
$2,462.30 |
$500.00 |
$2,500.00 |
|
| 5 | 192-6004 |
PLANT MATERIAL (5-GAL) | 35,090 | EA |
$20.00 |
$13.25 |
$20.00 |
$25.00 |
|
| 6 | 192-6005 |
PLANT MATERIAL (15-GAL) | 2,643 | EA |
$105.00 |
$116.16 |
$130.00 |
$100.00 |
|
| 7 | 192-6006 |
PLANT MATERIAL (30-GAL) | 842 | EA |
$180.00 |
$156.27 |
$240.00 |
$225.00 |
|
| 8 | 192-6013 |
MULCH | 74,601 | SY |
$3.00 |
$2.82 |
$6.00 |
$3.00 |
|
| 9 | 192-6016 |
PLANT BED PREPARATION | 74,601 | SY |
$2.00 |
$0.3060 |
$2.00 |
$2.00 |
|
| 10 | 193-6005 |
PLANT REPLACEMENT (5-GAL) | 700 | EA |
$10.00 |
$21.30 |
$0.0100 |
$0.0100 |
|
| 11 | 193-6009 |
PLANT REPLACEMENT (15 GAL) | 150 | EA |
$50.00 |
$175.44 |
$0.0100 |
$0.0100 |
|
| 12 | 193-6010 |
PLANT REPLACEMENT (30 GAL) | 60 | EA |
$100.00 |
$304.36 |
$0.0100 |
$0.0100 |
|
| 13 | 193-6021 |
PLANT MAINTENANCE LOCATION A | 24 | MO |
$5,000.00 |
$3,573.68 |
$2,500.00 |
$3,000.00 |
|
| 14 | 193-6022 |
PLANT MAINTENANCE LOCATION B | 24 | MO |
$1,800.00 |
$3,500.37 |
$1,400.00 |
$1,000.00 |
|
| 15 | 193-6023 |
IRRIG SYS OPER AND MAINT LOCATION A | 24 | MO |
$2,500.00 |
$921.49 |
$1,000.00 |
$2,000.00 |
|
| 16 | 193-6024 |
IRRIG SYS OPER AND MAINT LOCATION B | 24 | MO |
$900.00 |
$921.49 |
$1,000.00 |
$1,000.00 |
|
| 17 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 100 | LF |
$10.00 |
$61.40 |
$0.0100 |
$0.0100 |
|
| 18 | 403-6001 |
TEMPORARY SPL SHORING | 100 | SF |
$10.00 |
$61.40 |
$0.0100 |
$0.0100 |
|
| 19 | 432-6002 |
RIPRAP (CONC)(5 IN) | 2 | CY |
$550.00 |
$438.60 |
$0.0100 |
$1,000.00 |
|
| 20 | 500-6001 |
MOBILIZATION | 1 | LS |
$282,200.00 |
$263,157.90 |
$240,239.20 |
$350,000.00 |
|
| 21 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 16 | MO |
$2,500.00 |
$1,644.74 |
$1,375.00 |
$2,500.00 |
|
| 22 | 506-6035 |
SANDBAGS FOR EROSION CONTROL | 100 | EA |
$5.00 |
$8.95 |
$0.0100 |
$1.00 |
|
| 23 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 300 | LF |
$2.50 |
$1.17 |
$0.0100 |
$1.00 |
|
| 24 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 300 | LF |
$1.00 |
$1.17 |
$0.0100 |
$1.00 |
|
| 25 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 23,165 | LF |
$3.00 |
$1.90 |
$0.0100 |
$5.00 |
|
| 26 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 23,165 | LF |
$0.2500 |
$0.2050 |
$0.0100 |
$0.0100 |
|