Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Feb 5, 2019 | 0027-13-212NH 2019(365) | Harris Houston |
HIGH MAST AND UNDERPASS LIGHTING UPGRADESIH 69 · | $5,280,884 | $4,728,768 | SICE, INC. | -10.5% | 5 |
| Feb 5, 2019 | 6327-15-001RMC - 632715001 | Travis Austin |
REPAIR, REPLACE, AND UPGRADE MBGFFM 734 · | $4,053,070 | $4,550,444 | K-BAR SERVICES, INC. | +12.3% | 1 |
| Feb 5, 2019 | 0200-07-054NH 2019(676) | Tyler Beaumont |
MILL AND OVERLAYUS 69 · | $5,852,881 | $4,390,336 | TEXAS MATERIALS GROUP, INC. | -25.0% | 4 |
| Feb 5, 2019 | 2590-02-010STP 2019(446) | Nacogdoches Lufkin |
RECONSTRUCT AND WIDEN PAVEMENTFM 2609 · | $3,995,249 | $3,823,596 | PINTO CONSTRUCTION CO., INC. | -4.3% | 7 |
| Feb 5, 2019 | 0520-05-050C 520-5-50 | Upshur Atlanta |
PLANING, ACP & PAV MRKSSH 155 · | $4,133,448 | $3,772,059 | MADDEN CONTRACTING COMPANY, LLC. | -8.7% | 2 |
| Feb 5, 2019 | 6340-24-001RMC - 634024001 | Gonzales Yoakum |
ON CALL PAVEMENT REPAIRSUA 90 · | $3,817,537 | $3,598,022 | BRANNAN PAVING CO., LTD. | -5.8% | 4 |
| Feb 5, 2019 | 1069-01-035STP 2019(572)HES | Nueces Corpus Christi |
IMPROVE TRAFFIC SIGNALS AND INTERCONNECT SIGNALSSH 357 · | $3,585,320 | $3,511,807 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | -2.1% | 4 |
| Feb 5, 2019 | 0092-14-092C 92-14-92 | Dallas Dallas |
FULL DEPTH CONCRETE REPAIR ON FRONTAGE ROADSIH 345 · | $3,132,829 | $3,472,553 | NEW WORLD CONTRACTING, LLC | +10.8% | 6 |
| Feb 5, 2019 | 6341-13-001RMC - 634113001 | Smith Tyler |
MILL & INLAYSH 64 · | $3,143,855 | $3,363,242 | LONGVIEW BRIDGE AND ROAD, LTD. | +7.0% | 7 |
| Feb 5, 2019 | 0039-17-201NH 2019(694) | Hidalgo Pharr |
PAVEMENT REHABILITATION OF FRONTAGE ROADSIH 2 · | $2,366,368 | $2,966,778 | FOREMOST PAVING, INC. | +25.4% | 2 |
| Feb 5, 2019 | 0051-09-120C 51-9-120 | Galveston Houston |
BASE REP, MILL, SC, O/L, STRIPINGFM 3005 · | $3,283,657 | $2,837,928 | ANGEL BROTHERS HOLDINGS CORP. | -13.6% | 2 |
| Feb 5, 2019 | 0952-01-060C 952-1-60 | Liberty Beaumont |
WIDEN/TWO-COURSE SURFACE TREATMENTFM 1008 · | $2,879,633 | $2,730,449 | ANGEL BROTHERS HOLDINGS CORP. | -5.2% | 4 |
| Feb 5, 2019 | 1158-01-009C 1158-1-9 | Culberson El Paso |
ROADWAY REHABILITATIONFM 2185 · | $2,597,422 | $2,339,707 | DAN WILLIAMS COMPANY | -9.9% | 4 |
| Feb 5, 2019 | 0137-10-022STP 2019(504)HES | Clay Wichita Falls |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 174 · | $2,104,517 | $2,328,204 | BLYTHE CONSTRUCTION, INC. | +10.6% | 6 |
| Feb 5, 2019 | 0465-02-026C 465-2-26 | Bexar San Antonio |
SURFACE & PAVEMENT MARKINGSFM 1518 · | $2,621,772 | $2,220,997 | ANGEL BROTHERS HOLDINGS CORP. | -15.3% | 5 |
| Feb 5, 2019 | 0924-00-100STP 2019(575) | El Paso El Paso |
FY 2019 STRIPING PROJECTVA · | $2,057,697 | $1,965,160 | MIJELUM | -4.5% | 4 |
| Feb 5, 2019 | 0049-14-012STP 2019(497) | Robertson Bryan |
GRDG, WDN, STRCS, BASE, SURF, SGNS, MRKGSFM 46 · | $2,034,389 | $1,723,097 | KNIFE RIVER CORPORATION - SOUTH | -15.3% | 6 |
| Feb 5, 2019 | 0908-00-088NH 2019(516) | Taylor Abilene |
FY 2019 TRAFFIC CONTROL DEVICESVA · | $2,552,057 | $1,682,111 | FLAT LINE, INC. | -34.1% | 6 |
| Feb 5, 2019 | 0092-05-051STP 2019(499)MM | Ellis Dallas |
CONSTRUCT INTERSECTION IMPROVEMENTSIH 45 · | $1,213,647 | $1,593,213 | ACCELERATED CRITICAL PATH, INC. | +31.3% | 4 |
| Feb 5, 2019 | 0009-11-243C 9-11-243 | Dallas Dallas |
FULL DEPTH CONC. PAV REPAIR & PAV MARK ON EB FR RDIH 30 · | $1,070,904 | $1,381,126 | HIGHWAY 19 CONSTRUCTION LLC | +29.0% | 6 |
| Feb 5, 2019 | 0181-03-025STP 2019(443)HES | Callahan Abilene |
MILLED EDGELINE RUMBLE STRIPSSH 36 · | $1,948,115 | $1,298,585 | FLAT LINE, INC. | -33.3% | 6 |
| Feb 5, 2019 | 0432-01-065STP 2019(501) | Calhoun Yoakum |
ADD TURN LANES & RESURFACINGSH 185 · | $1,009,685 | $1,252,352 | REXCO CONSTRUCTION SERVICES, INC. | +24.0% | 3 |
| Feb 5, 2019 | 6318-30-001BPM - 631830001 | Hidalgo Pharr |
BRIDGE PREVENTIVE MAINTENANCEFM 88 · | $1,054,565 | $1,227,644 | VALLEY INFRASTRUCTURE, INC. | +16.4% | 1 |
| Feb 5, 2019 | 0054-06-104STP 2019(474)HES | Brown Brownwood |
PROFILE CENTER AND EDGELINEUS 67 · | $1,220,868 | $1,059,136 | STRIPE-A-ZONE, INC. | -13.2% | 6 |
| Feb 5, 2019 | 6338-59-001RMC - 633859001 | Denton Dallas |
VEGETATION MANGAEMENTIH 35W · | $866,840 | $1,034,090 | CROSS PLUS CONSTRUCTION, LLC | +19.3% | 2 |
| Feb 5, 2019 | 0366-01-076STP 2019(578) | Hays Austin |
MILL, SEAL AND INLAYSL 82 · | $982,023 | $1,025,322 | ANGEL BROTHERS HOLDINGS CORP. | +4.4% | 6 |
| Feb 5, 2019 | 0209-01-063NH 2019(440) | McLennan Waco |
MILL/OVLYSL 2 · | $856,847 | $1,014,137 | TEXAS MATERIALS GROUP, INC. | +18.4% | 3 |
| Feb 5, 2019 | 0235-03-034STP 2019(508)HES | Real San Angelo |
PROFILE EDGELINE AND CENTERLINE MARKINGSSH 55 · | $1,015,497 | $1,009,258 | TRP CONSTRUCTION GROUP, LLC | -0.6% | 3 |
| Feb 5, 2019 | 6341-63-001RMC - 634163001 | Nueces Corpus Christi |
ILLUMINATION MAINATENANCEUS 77 · | $1,001,303 | $969,970 | TRAF-TEX, INC. | -3.1% | 1 |
| Feb 5, 2019 | 1842-01-016C 1842-1-16 | Martin Odessa |
IMPROVE DRAINAGEFM 26 · | $1,216,324 | $935,181 | RK HALL, LLC | -23.1% | 7 |
| Feb 5, 2019 | 6336-77-001RMC - 633677001 | Denton Dallas |
FLEXIBLE PAVEMENT REPAIRIH 35 · | $680,453 | $895,600 | JAGOE-PUBLIC COMPANY | +31.6% | 3 |
| Feb 5, 2019 | 6340-25-001RMC - 634025001 | Gonzales Yoakum |
ON CALL SPOT REPAIRSUA 90 · | $1,110,500 | $876,200 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -21.1% | 5 |
| Feb 5, 2019 | 6333-79-001RMC - 633379001 | Liberty Beaumont |
OVERLAY AND PAVEMENT REPAIRSH 105 · | $835,081 | $780,012 | ANGEL BROTHERS HOLDINGS CORP. | -6.6% | 6 |
| Feb 5, 2019 | 6341-31-001RMC - 634131001 | Gonzales Yoakum |
THERMOPLASTIC PAVEMENT MARKINGSUA 90 · | $834,271 | $770,109 | D. I. J. CONSTRUCTION, INC. | -7.7% | 7 |
| Feb 5, 2019 | 6335-67-001RMC - 633567001 | Newton Beaumont |
FM 2829 OVERLAYFM 2829 · | $824,166 | $735,834 | TEXAS MATERIALS GROUP, INC. | -10.7% | 2 |
| Feb 5, 2019 | 0172-10-015C 172-10-15 | Johnson Fort Worth |
GR, BS, DR, PAVUS 287 · | $808,266 | $709,937 | AUSTIN BRIDGE & ROAD SERVICES, LP | -12.2% | 6 |
| Feb 5, 2019 | 6328-94-001RMC - 632894001 | Grayson Paris |
BORE AND REPLACE PIPEFM 120 · | $624,950 | $680,119 | HIGHWAY 19 CONSTRUCTION LLC | +8.8% | 7 |
| Feb 5, 2019 | 6337-65-001RMC - 633765001 | Dallas Dallas |
RETROREFLECTORIZED PAVEMENT MARKINGS & MARKERSIH 45 · | $631,611 | $595,804 | PMI PAVEMENT MARKING, LLC | -5.7% | 4 |
| Feb 5, 2019 | 0915-18-024BR 2007(141) | Frio San Antonio |
REPLACE BRIDGE AND APPROACHESCR · | $557,192 | $572,307 | ENCINO LANDSCAPE, INC. | +2.7% | 8 |
| Feb 5, 2019 | 6337-29-001RMC - 633729001 | Wise Fort Worth |
THERMOPLSDTIC STRIPING AND HANDWORKUS 380 · | $561,560 | $532,264 | STRIPE-A-ZONE, INC. | -5.2% | 5 |
| Feb 5, 2019 | 6320-78-001RMC - 632078001 | Ellis Dallas |
ON-CALL REFLECTORIZED PAVEMENT MARKINGSUS 287 · | $424,826 | $531,308 | TRP CONSTRUCTION GROUP, LLC | +25.1% | 3 |
| Feb 5, 2019 | 6340-77-001RMC - 634077001 | Walker Bryan |
SPOT BASE REPAIRSH 30 · | $441,225 | $513,435 | ISI CONTRACTING, INC. | +16.4% | 1 |
| Feb 5, 2019 | 6320-47-001BPM - 632047001 | Washington Bryan |
SCOUR REPAIRSH 105 · | $532,510 | $510,520 | SJ&J CONSTRUCTION, LLC | -4.1% | 7 |
| Feb 5, 2019 | 6334-79-001RMC - 633479001 | Hale Lubbock |
MOWINGIH 27 · | $464,440 | $463,926 | TEXAS BLACKTOPS LLC | -0.1% | 5 |
| Feb 5, 2019 | 6337-15-001RMC - 633715001 | Montgomery Houston |
GUARDRAIL REPAIRIH 45 · | $468,091 | $451,885 | ISI CONTRACTING, INC. | -3.5% | 2 |
| Feb 5, 2019 | 6339-75-001RMC - 633975001 | Brazoria Houston |
MOWING HIGHWAY ROW (SOUTH FM'S)FM 521 · | $387,217 | $385,752 | RELIANT SAND AND CONSTRUCTION, INC. | -0.4% | 5 |
| Feb 5, 2019 | 6338-56-001RMC - 633856001 | Val Verde Laredo |
GUARDRAIL REPAIRSUS 277 · | $333,505 | $358,785 | K-BAR SERVICES, INC. | +7.6% | 2 |
| Feb 5, 2019 | 6333-41-001BPM - 633341001 | Dallas Dallas |
BRIDGE REPAIRUS 75 · | $336,284 | $335,030 | GIBSON & ASSOCIATES, INC. | -0.4% | 7 |
| Feb 5, 2019 | 6338-69-001RMC - 633869001 | Parker Fort Worth |
REFLECTORIZED PVMNT MARKINGS AND MARKERSIH 20 · | $377,738 | $325,062 | REPUBLIC TRAFFIC SAFETY, INC. | -13.9% | 5 |
| Feb 5, 2019 | 6337-36-001RMC - 633736001 | Navarro Dallas |
TREE AND BRUSH REMOVAL AND TRIMMINGFM 739 · | $350,900 | $276,986 | BOEN LANDSCAPING & IRRIGATION, LLC | -21.1% | 7 |
| Feb 5, 2019 | 0045-05-048STP 2019(502)HES | Fannin Paris |
TRAFFIC CONTROL DEVICESSH 56 · | $216,959 | $205,853 | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | -5.1% | 3 |
| Feb 5, 2019 | 0164-01-072NH 2019(089) | Henderson Tyler |
RECNSTRCT PIPE ENTRNCE,ADD LNDSCPING & LGHTNGSH 31 · | $148,860 | $144,985 | ENCINO LANDSCAPE, INC. | -2.6% | 3 |
| Jan 10, 2019 | 6332-13-001RMC - 633213001 | Angelina Lufkin |
CULVERT REPAIRFM 2109 · | $203,106 | $224,810 | CHAMPION INFRASTRUCTURE, LLC | +10.7% | 3 |
| Jan 9, 2019 | 2635-05-001NH 2019(411) | Randall Amarillo |
B-2 PHASE I: CONSTRUCT FRT RDS FOR FUTURE FREEWAYSL 335 · | $46,878,849 | $45,797,691 | ALLEN BUTLER CONSTRUCTION, INC. | -2.3% | 3 |
| Jan 9, 2019 | 1188-02-087STP 2019(442) | Midland Odessa |
CONSTRUCT NEW INTERCHANGESL 250 · | $22,255,624 | $24,267,703 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | +9.0% | 3 |
| Jan 9, 2019 | 0139-05-043STP 2019(387) | Reeves Odessa |
ROADWAY REHABILITATIONUS 285 · | $23,840,072 | $18,885,091 | FNF CONSTRUCTION, INC. | -20.8% | 4 |
| Jan 9, 2019 | 0015-08-142NH 2019(605) | Williamson Austin |
GRADING, BASE, HMACP, PVMRK & SIGNSIH 35 · | $14,305,404 | $13,145,763 | DAN WILLIAMS COMPANY | -8.1% | 6 |
| Jan 9, 2019 | 0018-05-095NH 2019(375) | Webb Laredo |
RESURFACE OF EXISTING HIGHWAYIH 35 · | $12,388,126 | $12,256,476 | ANDERSON COLUMBIA CO., INC. | -1.1% | 2 |
| Jan 9, 2019 | 0510-04-013STP 2019(302) | Fannin Paris |
REHABILITATION OF EXISTING ROADFM 898 · | $14,983,579 | $12,209,810 | D. L. LENNON INCORPORATED - CONTRACTOR | -18.5% | 4 |
| Jan 9, 2019 | 0128-04-038NH 2019(433) | McCulloch Brownwood |
RECONSTRUCT ROADWAYUS 190 · | $6,691,606 | $8,589,804 | BIG CREEK CONSTRUCTION, LTD. | +28.4% | 1 |
| Jan 9, 2019 | 0275-04-052C 275-4-52 | Carson Amarillo |
ACP OVERLAY,CRCP REPAIR, MBGF, AND STRIPING.IH 40 · | $7,990,543 | $8,012,745 | KIEWIT INFRASTRUCTURE SOUTH CO. | +0.3% | 5 |
| Jan 9, 2019 | 0008-07-035C 8-7-35 | Tarrant Fort Worth |
BASE RPR, MILL, OVERLAY, PAVMT MARKSH 180 · | $5,883,084 | $6,444,576 | AUSTIN BRIDGE & ROAD SERVICES, LP | +9.5% | 3 |
| Jan 9, 2019 | 1192-01-024STP 2017(936) | McLennan Waco |
WDN, GR, BS, SURF, ADD SHLDRSFM 939 · | $6,869,586 | $6,431,694 | KNIFE RIVER CORPORATION - SOUTH | -6.4% | 3 |
| Jan 9, 2019 | 3240-01-019STP 2019(323) | Wood Tyler |
PLANING,PVMT RPR,ACP,OCST,PFS,MBGF,PV MKSL 564 · | $5,870,280 | $5,773,807 | REYNOLDS & KAY, LTD. | -1.6% | 4 |
| Jan 9, 2019 | 0146-06-030STP 2019(404) | Foard Childress |
REHABILITATION OF EXISTING ROADWAYUS 70 · | $4,065,361 | $4,375,237 | DUININCK, INC. | +7.6% | 2 |
| Jan 9, 2019 | 0155-03-037BR 1502(573) | Goliad Corpus Christi |
BRIDGE REPLACEMENTUS 183 · | $2,949,650 | $3,587,103 | RELMCO, INC. | +21.6% | 3 |
| Jan 9, 2019 | 0008-03-120C 8-3-120 | Parker Fort Worth |
GR, BS, DR, PAVIH 20 · | $2,579,320 | $3,434,712 | ALTUS CONSTRUCTION LLC | +33.2% | 2 |
| Jan 9, 2019 | 0138-06-044C 138-6-44 | Nacogdoches Lufkin |
PLANE, OCST AND PFCUS 259 · | $3,720,758 | $3,341,270 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -10.2% | 4 |
| Jan 9, 2019 | 1310-01-027BR 2019(492) | Denton Dallas |
REPLACE BRIDGE AND APPROACHESFM 407 · | $3,666,125 | $3,324,126 | HIGHWAY 19 CONSTRUCTION LLC | -9.3% | 12 |
| Jan 9, 2019 | 0437-02-017STP 2019(394) | Callahan Abilene |
3"OVERLAYUS 283 · | $3,681,738 | $3,259,093 | J. H. STRAIN & SONS, INC. | -11.5% | 8 |
| Jan 9, 2019 | 2208-02-022C 2208-2-22 | Dallas Dallas |
FULL DEPTH REPAIR CP, OVERLAY & PAVEMENT MARKINGSSS 303 · | $2,586,374 | $2,756,289 | O. TREVINO CONSTRUCTION, LLC | +6.6% | 4 |
| Jan 9, 2019 | 2363-01-007C 2363-1-7 | Rockwall Dallas |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 2453 · | $2,874,972 | $2,753,945 | A. K. GILLIS & SONS, INC. | -4.2% | 8 |
| Jan 9, 2019 | 0177-07-114NH 1802(596) | Harris Houston |
BRIDGE DECK REPLACEMENTIH 69 · | $2,789,323 | $2,711,904 | ISI CONTRACTING, INC. | -2.8% | 1 |
| Jan 9, 2019 | 0134-03-032STP 2019(439) | Young Wichita Falls |
LEVEL UP AND OVERLAYUS 380 · | $2,714,623 | $2,678,507 | JAGOE-PUBLIC COMPANY | -1.3% | 5 |
| Jan 9, 2019 | 0914-00-411STP 2019(381) | Travis Austin |
INSTALL OR REBUILD TRAFFIC SIGNALSVA · | $2,258,762 | $2,524,409 | THE LEVY COMPANY, INC. | +11.8% | 3 |
| Jan 9, 2019 | 6336-47-001RMC - 633647001 | Parker Fort Worth |
FLEXIBLE PAV STR REPAIR (MILL AND INLAY)IH 20 · | $2,859,021 | $2,439,851 | NORTHEASTERN PAVERS, LLC | -14.7% | 6 |
| Jan 9, 2019 | 6337-64-001RMC - 633764001 | Menard San Angelo |
WIDENING OF ROADWAYRM 1773 · | $1,553,200 | $2,258,273 | ALLEN KELLER COMPANY | +45.4% | 1 |
| Jan 9, 2019 | 0687-01-013BR 2019(418) | Gonzales Yoakum |
REPLACE BRIDGE AND APPROACHESFM 77 · | $2,337,553 | $1,928,660 | HILL COUNTRY BRIDGE, INC. | -17.5% | 6 |
| Jan 9, 2019 | 6330-78-001RMC - 633078001 | Wise Fort Worth |
FLEXIBLE PAVEMENT REPAIRFM 51 · | $1,912,730 | $1,887,509 | JAGOE-PUBLIC COMPANY | -1.3% | 5 |
| Jan 9, 2019 | 0495-07-076NH 2019(436) | Gregg Tyler |
TBPFC&ACP SURF,PLNG,SHLDR TXTR, PV MKIH 20 · | $1,774,088 | $1,878,815 | EAST TEXAS BRIDGE, INC. | +5.9% | 3 |
| Jan 9, 2019 | 0200-10-067NH 1802(598) | Hardin Beaumont |
GR, BS, STR, PVMT, SIGNUS 69 · | $2,168,704 | $1,853,960 | TEXAS MATERIALS GROUP, INC. | -14.5% | 4 |
| Jan 9, 2019 | 6332-52-001RMC - 633252001 | Harris Houston |
REPLACE EXISTING OVH & GROUND MOUNT LARGE SIGNSIH 10 · | $2,189,092 | $1,820,450 | BATTERSON, LLP | -16.8% | 4 |
| Jan 9, 2019 | 0301-03-026C 301-3-26 | Frio San Antonio |
REHABILITATE EXISTING ROADWAYSH 85 · | $1,362,455 | $1,754,396 | ANDERSON COLUMBIA CO., INC. | +28.8% | 4 |
| Jan 9, 2019 | 1418-01-012C 1418-1-12 | Waller Houston |
BASE REPAIR,ACP OVERLAY AND PAVEMENT MARKINGSFM 1489 · | $1,439,222 | $1,597,058 | ANGEL BROTHERS HOLDINGS CORP. | +11.0% | 4 |
| Jan 9, 2019 | 0910-00-107STP 2019(324) | Smith Tyler |
THERMOPLASTIC PAVEMENT MARKINGSVA · | $1,947,371 | $1,530,350 | CENTERLINE TECHNOLOGIES, LLC | -21.4% | 6 |
| Jan 9, 2019 | 0907-00-173STP 2019(397) | Tom Green San Angelo |
PAVEMENT MARKINGSVA · | $1,354,953 | $1,514,295 | VIZCAINO, L.P. | +11.8% | 5 |
| Jan 9, 2019 | 6336-61-001RMC - 633661001 | McLennan Waco |
SPALL & FULL DEPTH CONCRETE REPAIRUS 84 · | $1,543,968 | $1,496,038 | CROSS PLUS CONSTRUCTION, LLC | -3.1% | 5 |
| Jan 9, 2019 | 0009-11-245C 9-11-245 | Dallas Dallas |
FULL DEPTH CONCRETE REPAIRIH 30 · | $1,415,897 | $1,336,468 | O. TREVINO CONSTRUCTION, LLC | -5.6% | 4 |
| Jan 9, 2019 | 2103-01-035STP 2019(382) | Williamson Austin |
DEPTH REPAIR, UNDERSEAL & THIN OVERLAYRM 2243 · | $1,384,336 | $1,310,876 | ANGEL BROTHERS HOLDINGS CORP. | -5.3% | 5 |
| Jan 9, 2019 | 0043-08-076STP 2019(305)HES | Wichita Wichita Falls |
SAFETY LIGHTINGUS 287 · | $976,809 | $1,090,137 | VACA UNDERGROUND UTILITIES INC | +11.6% | 5 |
| Jan 9, 2019 | 0184-03-038C 184-3-38 | Bell Waco |
MILL/OVLYSH 53 · | $1,194,128 | $1,032,768 | LONE STAR PAVING COMPANY | -13.5% | 4 |
| Jan 9, 2019 | 6337-40-001RMC - 633740001 | Kaufman Dallas |
VEGETATION MANAGEMENT (NORTH SIDE)IH 20 · | $879,114 | $1,030,803 | CROSS PLUS CONSTRUCTION, LLC | +17.3% | 2 |
| Jan 9, 2019 | 0016-01-125STP 2019(380) | Travis Austin |
TOM OVERLAY WITH EDGE MILLINGSL 275 · | $1,087,037 | $1,030,070 | AUSTIN MATERIALS, LLC | -5.2% | 6 |
| Jan 9, 2019 | 6333-83-001RMC - 633383001 | Gonzales Yoakum |
ON CALL LUMINAIRE/TRAFFIC SIGNAL/GUIDE SIGN REPAIRIH 10 · | $589,994 | $925,501 | THIRD COAST SERVICES LLC | +56.9% | 1 |
| Jan 9, 2019 | 6340-54-001RMC - 634054001 | Victoria Yoakum |
ON CALL LUMINAIRE AND SIGNSUS 59 · | $589,994 | $925,501 | THIRD COAST SERVICES LLC | +56.9% | 1 |
| Jan 9, 2019 | 6337-35-001RMC - 633735001 | Hardin Beaumont |
FLEXIBLE PAVEMENT STRUCTURE REPAIRFM 770 · | $726,658 | $768,059 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +5.7% | 6 |
| Jan 9, 2019 | 6338-95-001RMC - 633895001 | Harris Houston |
FULL DEPTH CONC & ASPHALT REPAIRSH 249 · | $772,249 | $733,405 | MAIN LANE INDUSTRIES LTD. | -5.0% | 2 |
| Jan 9, 2019 | 6338-02-001RMC - 633802001 | Medina San Antonio |
MOWING AND LITTER REMOVALUS 90 · | $698,732 | $665,750 | R&M INCORPORATED | -4.7% | 3 |
| Jan 9, 2019 | 6339-35-001RMC - 633935001 | Wood Tyler |
TREE REMOVALSH 37 · | $758,400 | $656,928 | CATOCON, INC. | -13.4% | 5 |
| Jan 9, 2019 | 6338-01-001RMC - 633801001 | Kerr San Antonio |
MOWING AND LITTER REMOVALIH 10 · | $534,858 | $656,697 | SOUTH TEXAS MAINTENANCE, INC. | +22.8% | 2 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.