| 1 | 134-6001 |
BACKFILL (TY A) | 105.92 | STA |
$159.95 |
$412.00 |
$850.00 |
| 2 | 162-6002 |
BLOCK SODDING | 260 | SY |
$18.00 |
$7.50 |
$8.50 |
| 3 | 168-6001 |
VEGETATIVE WATERING | 13 | MG |
$50.00 |
$145.00 |
$50.00 |
| 4 | 340-6064 |
D-GR HMA(SQ) TY-C SAC-B PG76-22 | 3,652 | TON |
$100.00 |
$105.00 |
$110.00 |
| 5 | 400-6005 |
CEM STABIL BKFL | 13 | CY |
$250.00 |
$100.00 |
$220.00 |
| 6 | 400-6008 |
CUT & RESTORE ASPH PAVING | 20 | SY |
$200.00 |
$100.00 |
$200.00 |
| 7 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 120 | LF |
$10.00 |
$12.00 |
$58.00 |
| 8 | 432-6002 |
RIPRAP (CONC)(5 IN) | 7.8 | CY |
$450.00 |
$595.00 |
$1,000.00 |
| 9 | 462-6052 |
CONC BOX CULV (5 FT X 4 FT)(EXTEND) | 36 | LF |
$1,887.16 |
$725.00 |
$2,550.00 |
| 10 | 464-6003 |
RC PIPE (CL III)(18 IN) | 24 | LF |
$125.00 |
$195.00 |
$175.00 |
| 11 | 467-6182 |
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C) | 6 | EA |
$9,000.00 |
$5,000.00 |
$9,300.00 |
| 12 | 467-6358 |
SET (TY II) (18 IN) (RCP) (4: 1) (C) | 6 | EA |
$1,700.00 |
$1,825.00 |
$1,500.00 |
| 13 | 467-6377 |
SET (TY II) (24 IN) (CMP) (4: 1) (C) | 2 | EA |
$1,500.00 |
$2,250.00 |
$1,750.00 |
| 14 | 480-6001 |
CLEAN EXIST CULVERTS | 5 | EA |
$1,000.00 |
$1,850.00 |
$4,500.00 |
| 15 | 496-6006 |
REMOV STR (HEADWALL) | 8 | EA |
$2,000.00 |
$1,300.00 |
$2,000.00 |
| 16 | 500-6001 |
MOBILIZATION | 1 | LS |
$98,182.22 |
$73,000.00 |
$64,000.00 |
| 17 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 | MO |
$3,500.00 |
$500.00 |
$3,000.00 |
| 18 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 750 | LF |
$5.81 |
$5.50 |
$7.00 |
| 19 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 750 | LF |
$1.15 |
$1.00 |
$1.50 |
| 20 | 510-6003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 3 | MO |
$12,000.00 |
$4,725.00 |
$10,000.00 |
| 21 | 530-6011 |
INTRSCT, DRVWAYS, & TURNOUT (ACP) | 1,142 | SY |
$21.85 |
$22.00 |
$50.00 |
| 22 | 530-6016 |
DRIVEWAYS (BASE) | 1,142 | SY |
$31.12 |
$17.00 |
$45.00 |
| 23 | 533-6004 |
RUMBLE STRIPS (CENTERLINE) ASPHALT | 9,854 | LF |
$0.3200 |
$0.7500 |
$0.7500 |
| 24 | 658-6048 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 4 | EA |
$80.00 |
$155.00 |
$165.00 |
| 25 | 658-6049 |
INSTL OM ASSM (OM-2Z)(FLX)GND(BI) | 8 | EA |
$80.00 |
$26.00 |
$30.00 |
| 26 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 1,089 | EA |
$1.15 |
$1.00 |
$2.50 |
| 27 | 666-6302 |
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) | 21,255 | LF |
$0.3100 |
$0.4000 |
$0.4000 |
| 28 | 666-6311 |
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) | 1,820 | LF |
$0.3200 |
$0.4000 |
$0.4200 |
| 29 | 666-6314 |
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) | 10,760 | LF |
$0.3100 |
$0.4000 |
$0.4000 |
| 30 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 25 | LF |
$14.25 |
$15.00 |
$16.50 |
| 31 | 672-6013 |
TRAFFIC BUTTON TY II-A-A | 256 | EA |
$4.11 |
$4.00 |
$4.50 |
| 32 | 752-6003 |
TREE TRIMMING / BRUSH REMOVAL | 1.13 | MI |
$14,443.72 |
$23,000.00 |
$15,000.00 |
| 33 | 6185-6001 |
TMA (STATIONARY) | 1 | EA |
$13,800.00 |
$10,000.00 |
$10,000.00 |
| 34 | 6185-6003 |
TMA (MOBILE OPERATION) | 16 | HR |
$50.00 |
$20.00 |
$25.00 |