18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Apr 9, 2020 | 6352-28-001RMC - 635228001 | Coryell Waco |
MISC. CONCRETE AND CULVERT REPAIRS-DISTRICT WIDEFM 116 · | $730,978 | $766,637 | CROSS PLUS CONSTRUCTION, LLC | +4.9% | 5 |
| Apr 9, 2020 | 0167-01-120NH 2020(874) | El Paso El Paso |
MILL AND INLAY (FRONTAGE ROAD)US 54 · | $993,343 | $719,532 | ALLIED PAVING CO. | -27.6% | 6 |
| Apr 9, 2020 | 0371-03-131STP 2020(774)HES | Refugio Corpus Christi |
INSTALLING MEDIAN CABLE BARRIERUS 77 · | $785,756 | $701,475 | VECTOR UTILITIES LLC | -10.7% | 8 |
| Apr 9, 2020 | 1286-01-018STP 2020(784)HES | Orange Beaumont |
SAFETY IMPROVEMENT PROJECTFM 1078 · | $691,343 | $697,979 | NORMAN HIGHWAY CONSTRUCTORS, INC. | +1.0% | 4 |
| Apr 9, 2020 | 6354-07-001RMC - 635407001 | Harris Houston |
REPL PVMT MRKGS-LONG LINE STRIPINGUS 90 · | $676,586 | $685,426 | TOTAL HIGHWAY MAINTENANCE, LLC | +1.3% | 2 |
| Apr 9, 2020 | 6356-83-001MMC - 635683001 | Bell Waco |
COLD MIX - MATERAL ONLYUS 190 · | $751,420 | $631,470 | KNIFE RIVER CORPORATION - SOUTH | -16.0% | 3 |
| Apr 9, 2020 | 0924-07-017STP 2020(072)TP | Presidio El Paso |
CONSTRUCTION OF SHARED USE PATH AND SIDEWALKSCS · | $470,999 | $531,477 | DAN WILLIAMS COMPANY | +12.8% | 5 |
| Apr 9, 2020 | 6356-92-001MMC - 635692001 | Coryell Waco |
HOT MIX - MATERIAL ONLYUS 84 · | $583,464 | $519,000 | BIG CREEK CONSTRUCTION, LTD. | -11.0% | 3 |
| Apr 9, 2020 | 6359-80-001RMC - 635980001 | Ector Odessa |
CALLOUT BRIDGE REPAIRIH 20 · | $616,000 | $490,575 | SCR CIVIL CONSTRUCTION, LLC | -20.4% | 5 |
| Apr 9, 2020 | 0054-02-035STP 2020(762)HES | Coleman Brownwood |
IMPROVE GUARDRAILUS 84 · | $488,257 | $444,117 | 3LW CIVIL LLC | -9.0% | 6 |
| Apr 9, 2020 | 6360-25-001RMC - 636025001 | Pecos Odessa |
BRIDGE REPAIR (CALLOUT)IH 10 · | $616,000 | $429,900 | RELMCO, INC. | -30.2% | 6 |
| Apr 9, 2020 | 6358-22-001RMC - 635822001 | Pecos Odessa |
STREET SWEEPINGIH 10 · | $495,906 | $395,870 | PAVEMENT PARTNERS, LLC | -20.2% | 3 |
| Apr 9, 2020 | 6359-41-001RMC - 635941001 | Bell Waco |
RAISED PAVEMENT MARKER MAINTENANCEUS 190 · | $520,944 | $318,759 | BRYDL CONTRACTING, INC. | -38.8% | 4 |
| Apr 9, 2020 | 6357-29-001RMC - 635729001 | McLennan Waco |
NON-SITE SPEC SPALL & FULL DEPTH REPAIRUS 77 · | $258,390 | $221,600 | CROSS PLUS CONSTRUCTION, LLC | -14.2% | 6 |
| Apr 9, 2020 | 0543-01-066STP 2020(696)HES | Waller Houston |
INSTALL LED FLASHING CHEVRONS (CURVE)FM 359 · | $78,197 | $48,725 | SYNERGY SIGNS & SERVICES LLC | -37.7% | 10 |
| Apr 9, 2020 | 6359-05-001MMC - 635905001 | Henderson Tyler |
HERBICIDE ADD. ATHENS RDC MATERIALS ONLYSH 31 · | $52,800 | $21,358 | NATURCHEM, INC | -59.6% | 1 |
| Apr 8, 2020 | 0016-02-152NH 2020(463) | Hays Austin |
FREEWAY OPERATIONAL IMPROVEMENTSIH 35 · | $23,384,139 | $21,992,737 | HUNTER INDUSTRIES, LTD. | -6.0% | 4 |
| Apr 8, 2020 | 2451-03-017STP 2020(752) | Reeves Odessa |
ROADWAY REHABILITATIONRM 652 · | $19,019,375 | $20,145,623 | CI CONSTRUCTORS, INC. | +5.9% | 7 |
| Apr 8, 2020 | 2073-01-009STP 2013(212) | Gregg Tyler |
GR, STR, ACP BASE & SURF, PV MKFM 2206 · | $15,218,265 | $15,164,541 | EAST TEXAS BRIDGE, INC. | -0.4% | 2 |
| Apr 8, 2020 | 1154-01-020C 1154-1-20 | Fannin Paris |
2R REHABILITATIONFM 824 · | $6,017,407 | $5,973,030 | HIGHWAY 19 CONSTRUCTION LLC | -0.7% | 4 |
| Apr 8, 2020 | 0151-06-149NH 2020(757) | Travis Austin |
OPERATIONAL IMPROVEMENTSUS 183 · | $3,963,719 | $5,815,911 | GIBSON & ASSOCIATES, INC. | +46.7% | 2 |
| Apr 8, 2020 | 6355-15-001MMC - 635515001 | Henderson Tyler |
HERBICIDE AND INSECTICIDE ATHENS RDC (MAT ONLY)SH 31 · | $5,690,494 | $5,403,487 | NUTRIEN AG SOLUTIONS, INC. | -5.0% | 3 |
| Apr 8, 2020 | 6356-22-001MMC - 635622001 | Potter Amarillo |
ASPHALT OILS & EMULSIONS (MATERIAL ONLY)IH 40 · | $5,570,776 | $4,970,378 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -10.8% | 2 |
| Apr 8, 2020 | 0090-02-053STP 2020(777)HES | Oldham Amarillo |
IMPROVE GUARDRAIL TO DESIGN STANDARDSIH 40 · | $4,469,165 | $3,945,747 | HJC FARMS, INC. | -11.7% | 2 |
| Apr 8, 2020 | 2072-01-016STP 2020(708)HES | Gregg Tyler |
IMPROVE DRAINAGE, CULVERTS AND UPGRADE GUARD RAILFM 2204 · | $4,806,415 | $3,889,931 | STATELINE CONSTRUCTION, LLC | -19.1% | 8 |
| Apr 8, 2020 | 6355-14-001MMC - 635514001 | Garza Maintenance Division |
HERBICIDE & INSECTICIDE POST RDC (MATERIALS ONLY)US 84 · | $3,993,860 | $3,786,880 | NUTRIEN AG SOLUTIONS, INC. | -5.2% | 3 |
| Apr 8, 2020 | 3370-01-008C 3370-1-8 | Hopkins Paris |
2R REHABILITATIONFM 3389 · | $4,444,626 | $3,763,142 | D. L. LENNON INCORPORATED - CONTRACTOR | -15.3% | 5 |
| Apr 8, 2020 | 6357-98-001RMC - 635798001 | Kaufman Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 175 · | $4,433,114 | $3,633,670 | TEXAS MATERIALS GROUP, INC. | -18.0% | 4 |
| Apr 8, 2020 | 0747-04-076NH 2020(721) | Tarrant Fort Worth |
RESURFACE ROADWAYFM 157 · | $3,971,218 | $3,418,267 | AUSTIN BRIDGE & ROAD SERVICES, LP | -13.9% | 4 |
| Apr 8, 2020 | 0573-04-017STP 2020(710) | Gonzales Yoakum |
REHABILITATION OF EXISTING ROADWAYFM 1116 · | $3,864,100 | $3,364,665 | HUNTER INDUSTRIES, LTD. | -12.9% | 7 |
| Apr 8, 2020 | 6355-16-001MMC - 635516001 | Guadalupe San Antonio |
HERBICIDE/INSECTICIDE SEGUIN RDC (MATERIALS ONLY)IH 10 · | $3,319,859 | $3,175,613 | NUTRIEN AG SOLUTIONS, INC. | -4.3% | 3 |
| Apr 8, 2020 | 2247-01-011STP 2020(723)HES | Collin Dallas |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 2194 · | $3,210,783 | $3,089,623 | A. K. GILLIS & SONS, LLC | -3.8% | 6 |
| Apr 8, 2020 | 0140-11-046NH 2020(748) | Crockett San Angelo |
MICROSURFACINGIH 10 · | $3,097,661 | $2,925,471 | INTERMOUNTAIN SLURRY SEAL, INC. | -5.6% | 3 |
| Apr 8, 2020 | 6359-15-001RMC - 635915001 | Bexar San Antonio |
PAV MARKINGS & MRKRS CENTERLINE TEXTUREIH 35 · | $2,895,554 | $2,792,098 | TRP CONSTRUCTION GROUP, LLC | -3.6% | 4 |
| Apr 8, 2020 | 0191-01-092NH 2020(705) | Smith Tyler |
REPAIR AND RESURFACE ROADWAYUS 69 · | $2,825,315 | $2,060,600 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -27.1% | 3 |
| Apr 8, 2020 | 0808-01-061BR 2020(742) | Falls Waco |
BRIDGE RE-DECKING. CONCRETE OVERLAY BRIDGE REHAB.FM 413 · | $2,033,804 | $1,990,000 | JAMES CONSTRUCTION GROUP, L.L.C. | -2.2% | 4 |
| Apr 8, 2020 | 0911-28-047BR 1602(213) | Houston Lufkin |
BRIDGE REPLACEMENTCR · | $2,090,203 | $1,895,914 | STATELINE CONSTRUCTION, LLC | -9.3% | 7 |
| Apr 8, 2020 | 0905-00-081STP 2020(750) | Lubbock Lubbock |
TRAFFIC SMALL SIGN INSTALLATIONVA · | $1,988,313 | $1,723,006 | L&L COMPANY | -13.3% | 4 |
| Apr 8, 2020 | 0133-01-052NH 2020(735) | King Childress |
REALIGNMENT, HOTMIX, STRIPING, SIGNING & LIGHTINGUS 82 · | $1,385,813 | $1,641,062 | A. L. HELMCAMP, INC. | +18.4% | 2 |
| Apr 8, 2020 | 6356-65-001RMC - 635665001 | Collin Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRFM 981 · | $1,716,219 | $1,625,332 | A. K. GILLIS & SONS, LLC | -5.3% | 2 |
| Apr 8, 2020 | 0918-47-227STP 2020(722)HES | Dallas Dallas |
TRAFFIC SIGNAL AND SIDEWALK INSTALLATIONCS · | $1,613,093 | $1,568,006 | SELECT MAINTENANCE, L.L.C. | -2.8% | 3 |
| Apr 8, 2020 | 6342-67-001RMC - 634267001 | Dallas Dallas |
RETROREFLECT PAVEMENT MARKINGS & MARKERSUS 75 · | $1,281,271 | $1,402,828 | TOTAL HIGHWAY MAINTENANCE, LLC | +9.5% | 3 |
| Apr 8, 2020 | 6356-14-001RMC - 635614001 | Dallas Dallas |
ON-CALL RETROREFLECT PAVEMENT MARKINGSSL 12 · | $1,141,470 | $1,385,985 | STRIPING TECHNOLOGY, L.P. | +21.4% | 3 |
| Apr 8, 2020 | 6342-66-001RMC - 634266001 | Dallas Dallas |
RETROREFLECTORIZED PAVEMENT MARKINGS & MARKERSIH 45 · | $1,305,559 | $1,154,075 | TOTAL HIGHWAY MAINTENANCE, LLC | -11.6% | 3 |
| Apr 8, 2020 | 0010-12-072STP 2020(817) | Bowie Atlanta |
INSTALL SAFETY LIGHTINGUS 67 · | $1,100,689 | $1,089,559 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | -1.0% | 4 |
| Apr 8, 2020 | 0593-01-122STP 2020(782)HES | Liberty Beaumont |
SFT-SAFETY IMPROVEMENT PROJECTSSH 321 · | $1,123,194 | $1,074,621 | NORMAN HIGHWAY CONSTRUCTORS, INC. | -4.3% | 7 |
| Apr 8, 2020 | 6354-61-001RMC - 635461001 | Navarro Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRFM 1603 · | $1,169,093 | $1,009,303 | RAYFORD'S TRUCK & TRACTOR | -13.7% | 7 |
| Apr 8, 2020 | 0043-09-142C 43-9-142 | Wichita Wichita Falls |
UPGRADE BRIDGE AND APPROACH RAILINGUS 287 · | $889,187 | $948,264 | HJC FARMS, INC. | +6.6% | 7 |
| Apr 8, 2020 | 0015-09-177BR 2020(843) | Williamson Austin |
UPGRADE BRIDGE AND APPROACH RAILING, REHABILITATEIH 35 · | $846,980 | $939,069 | FUQUA CONSTRUCTION CO., INC. | +10.9% | 4 |
| Apr 8, 2020 | 0916-00-091STP 2020(775) | Nueces Corpus Christi |
INSTALL AND REPLACE SIGNSVA · | $1,258,697 | $885,744 | HIGHWAY BARRICADES AND SERVICES, LLC | -29.6% | 5 |
| Apr 8, 2020 | 0204-02-033STP 2020(758)HES | Williamson Austin |
INSTALL INTERSECTION FLASHING BEACON, ETC.US 79 · | $786,461 | $874,837 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +11.2% | 2 |
| Apr 8, 2020 | 0114-04-073BR 2020(844) | Bastrop Austin |
REHABILITATE BRIDGEUS 290 · | $907,709 | $863,708 | RESTEK, INC. | -4.8% | 4 |
| Apr 8, 2020 | 6357-09-001RMC - 635709001 | Harrison Atlanta |
CALLOUT MBGF REPAIR - SOUTHUS 59 · | $589,775 | $852,050 | JCW CONSTRUCTION, LLC | +44.5% | 2 |
| Apr 8, 2020 | 0251-04-026STP 2020(765)HES | Lampasas Brownwood |
IMPROVE GUARDRAIL & SAFETY TREAT FIXED OBJECTSUS 281 · | $790,994 | $788,695 | ODUM SERVICES, LLC | -0.3% | 4 |
| Apr 8, 2020 | 6357-75-001MMC - 635775001 | Hemphill Amarillo |
D-GR HMA TY D PG 64-28 (MATERIALS ONLY)US 60 · | $727,000 | $772,400 | L A FULLER & SONS CONSTRUCTION, LTD. | +6.2% | 2 |
| Apr 8, 2020 | 0079-01-043STP 2020(764)HES | Brown Brownwood |
IMPROVE GUARDRAIL & SAFETY TREAT FIXED OBJECTSUS 67 · | $764,279 | $735,534 | 3LW CIVIL LLC | -3.8% | 6 |
| Apr 8, 2020 | 6357-10-001RMC - 635710001 | Titus Atlanta |
CALLOUT MBGF REPAIR - WESTUS 271 · | $589,775 | $713,880 | CATOCON, INC. | +21.0% | 2 |
| Apr 8, 2020 | 6357-08-001RMC - 635708001 | Bowie Atlanta |
CALLOUT METAL BEAM GUARD FENCE REPAIR - NORTHUS 59 · | $589,775 | $702,035 | CATOCON, INC. | +19.0% | 2 |
| Apr 8, 2020 | 0167-01-127CM 2020(778) | El Paso El Paso |
INSTALLATION OF RVSD AND CCTVSUS 54 · | $535,791 | $587,855 | TRI STATE ELECTRIC, LTD. | +9.7% | 1 |
| Apr 8, 2020 | 6357-16-001RMC - 635716001 | Gaines Lubbock |
ROADSIDE MOWINGUS 62 · | $569,800 | $517,150 | TEXAS BLACKTOPS LLC | -9.2% | 4 |
| Apr 8, 2020 | 0389-12-092NH 2020(695) | Harris Houston |
INTERSECTION IMPROVEMENTSSH 146 · | $593,805 | $496,375 | STATEWIDE TRAFFIC SIGNAL COMPANY | -16.4% | 6 |
| Apr 8, 2020 | 0917-20-039BR 2019(179) | Freestone Bryan |
BRIDGE REPLACEMENTCR · | $475,352 | $479,341 | KNIFE RIVER CORPORATION - SOUTH | +0.8% | 11 |
| Apr 8, 2020 | 6354-74-001RMC - 635474001 | Nueces Corpus Christi |
FERRY LANDING GRATING PANEL SYSTEMSH 361 · | $1,247,000 | $400,545 | TEXAS GULF CONSTRUCTION COMPANY, INC. | -67.9% | 5 |
| Apr 8, 2020 | 6360-81-001RMC - 636081001 | Taylor Abilene |
MOWING HIGHWAY RIGHT OF WAYIH 20 · | $310,042 | $394,082 | ABESCAPE LANDSCAPING, LLC | +27.1% | 2 |
| Apr 8, 2020 | 1685-05-128STP 2020(698)HES | Harris Houston |
TRAFFIC SIGNAL IMPROVEMENTSSH 6 · | $503,166 | $387,861 | STATEWIDE TRAFFIC SIGNAL COMPANY | -22.9% | 6 |
| Apr 8, 2020 | 0683-02-080NH 2020(760) | Travis Austin |
INSTALL RAISED CONCRETE MEDIANRM 620 · | $504,639 | $378,218 | AARON CONCRETE CONTRACTORS, L.P. | -25.1% | 4 |
| Apr 8, 2020 | 6349-50-001BPM - 634950001 | Wilson San Antonio |
BRIDGE PREVENTATIVE MAINTENANCE_EROSION CONTROLUS 87 · | $420,107 | $370,338 | ACME BRIDGE COMPANY, INC. | -11.8% | 9 |
| Apr 8, 2020 | 6360-80-001RMC - 636080001 | Callahan Abilene |
MOWING HIGHWAY RIGHT OF WAY CALLAHAN COUNTYIH 20 · | $322,603 | $354,020 | ABESCAPE LANDSCAPING, LLC | +9.7% | 2 |
| Apr 8, 2020 | 6355-75-001RMC - 635575001 | Dallas Dallas |
STORM SEWER AND INLET CLEANINGUS 80 · | $318,617 | $346,010 | SHALOM SERVICES CORPORATION | +8.6% | 1 |
| Apr 8, 2020 | 6359-27-001RMC - 635927001 | Gregg Tyler |
TREE REMOVALSH 31 · | $321,200 | $338,303 | ROAD SOLUTIONS L.L.C. | +5.3% | 3 |
| Apr 8, 2020 | 6357-15-001RMC - 635715001 | Dawson Lubbock |
ROADSIDE MOWINGUS 87 · | $319,600 | $287,800 | TEXAS BLACKTOPS LLC | -9.9% | 4 |
| Apr 8, 2020 | 0183-01-047STP 2020(770)HES | Comanche Brownwood |
INSTALL INTERSECTION FLASHING BEACONSH 36 · | $253,484 | $274,719 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +8.4% | 4 |
| Apr 8, 2020 | 6357-14-001RMC - 635714001 | Terry Lubbock |
ROADSIDE MOWINGUS 62 · | $293,680 | $264,600 | BERT WHITAKER | -9.9% | 5 |
| Apr 8, 2020 | 0065-05-153STP 2020(780)HES | Hardin Beaumont |
SAFETY IMPROVEMENT PROJECTSUS 96 · | $279,713 | $223,223 | THE TRUESDELL CORPORATION | -20.2% | 3 |
| Apr 8, 2020 | 1685-05-123STP 2020(697)HES | Harris Houston |
IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNINGSH 6 · | $239,084 | $207,829 | STATEWIDE TRAFFIC SIGNAL COMPANY | -13.1% | 7 |
| Apr 8, 2020 | 0492-04-039STP 2020(706) | Smith Tyler |
INSTALL TRAFFIC SIGNALFM 346 · | $203,802 | $200,525 | STRIPING TECHNOLOGY, L.P. | -1.6% | 1 |
| Apr 8, 2020 | 1855-01-028STP 2020(833)HES | Cooke Wichita Falls |
SAFETY TREAT FIXED OBJECTSFM 922 · | $152,712 | $159,018 | 3LW CIVIL LLC | +4.1% | 6 |
| Apr 7, 2020 | 6359-95-001RMC - 635995001 | Wichita Wichita Falls |
RAISED PAVEMENT MARKER REPLACEMENTUS 287 · | $269,754 | $229,159 | BRYDL CONTRACTING, INC. | -15.0% | 2 |
| Apr 7, 2020 | 6357-85-001MMC - 635785001 | Wichita Wichita Falls |
HOT MIX (MATERIALS ONLY)US 287 · | $200,100 | $206,796 | AUSTIN ASPHALT, INC. | +3.3% | 3 |
| Apr 7, 2020 | 6357-40-001MMC - 635740001 | Baylor Wichita Falls |
HOT MIX (MATERIALS ONLY)US 82 · | $161,000 | $158,328 | AUSTIN ASPHALT, INC. | -1.7% | 3 |
| Apr 7, 2020 | 6355-58-001RMC - 635558001 | Cherokee Tyler |
ASPHALT AND CONCRETE DRIVEWAY REPAIRSUS 69 · | $80,889 | $90,738 | LELAND & BRADLEE CONSTRUCTION, INC. | +12.2% | 1 |
| Apr 7, 2020 | 6349-69-001RMC - 634969001 | Wood Tyler |
LAWN MAINTENANCESL 564 · | $54,160 | $76,000 | HX FARMS, INC. | +40.3% | 2 |
| Apr 7, 2020 | 6355-74-001MMC - 635574001 | Smith Tyler |
CONCRETE_MATERIALS ONLYUS 69 · | $30,000 | $31,820 | 849 RED BARON SUPPLY COMPANY, LLC | +6.1% | 1 |
| Apr 1, 2020 | 6353-87-001RMC - 635387001 | Walker Bryan |
SH 75 TOM OVERLAY, WIDENING, RESTRIPINGSH 75 · | $299,888 | $372,662 | KNIFE RIVER CORPORATION - SOUTH | +24.3% | 4 |
| Mar 31, 2020 | 6358-04-001MMC - 635804001 | Haskell Abilene |
MATERIALS ONLY: LIMESTONE ROCK ASPHALTUS 380 · | $240,784 | $249,530 | VULCAN CONSTRUCTION MATERIALS, LLC | +3.6% | 1 |
| Mar 31, 2020 | 6358-00-001MMC - 635800001 | Haskell Abilene |
MATERIALS ONLY: EMULSIONUS 380 · | $174,840 | $155,580 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -11.0% | 2 |
| Mar 31, 2020 | 6358-06-001MMC - 635806001 | Taylor Abilene |
MATERIALS ONLY: EMULSIONIH 20 · | $24,720 | $26,640 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | +7.8% | 2 |
| Mar 31, 2020 | 6358-02-001MMC - 635802001 | Haskell Abilene |
MATERIALS ONLY: FLEXIBLE BASEUS 380 · | $3,818 | $4,800 | ZACK BURKETT CO. | +25.7% | 2 |
| Mar 26, 2020 | 6356-95-001RMC - 635695001 | Jefferson Beaumont |
SUMP PUMP CLEANINGSH 347 · | $78,875 | $82,752 | AIMS COMPANIES | +4.9% | 1 |
| Mar 25, 2020 | 6356-55-001MMC - 635655001 | Gonzales Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)IH 10 · | $292,500 | $292,500 | BRAUNTEX MATERIALS, INC. | 0.0% | 5 |
| Mar 25, 2020 | 6356-53-001MMC - 635653001 | De Witt Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)US 87 · | $298,200 | $289,800 | BRAUNTEX MATERIALS, INC. | -2.8% | 5 |
| Mar 25, 2020 | 6356-57-001MMC - 635657001 | Fayette Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)IH 10 · | $294,800 | $286,000 | QUALITY HOT MIX, INC. | -3.0% | 5 |
| Mar 25, 2020 | 6356-60-001MMC - 635660001 | Wharton Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)US 59 · | $292,500 | $279,000 | QUALITY HOT MIX, INC. | -4.6% | 4 |
| Mar 25, 2020 | 6356-56-001MMC - 635656001 | Lavaca Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)US 77 · | $299,200 | $277,200 | QUALITY HOT MIX, INC. | -7.4% | 4 |
| Mar 25, 2020 | 6356-19-001MMC - 635619001 | Victoria Yoakum |
AGGREGATES FOR SURFACE TREATMENTS (MATERIAL ONLY)US 59 · | $298,050 | $272,915 | QUALITY HOT MIX, INC. | -8.4% | 3 |
| Mar 25, 2020 | 6356-62-001MMC - 635662001 | Austin Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)IH 10 · | $296,700 | $270,900 | QUALITY HOT MIX, INC. | -8.7% | 4 |
| Mar 25, 2020 | 6349-88-001RMC - 634988001 | Culberson El Paso |
METAL BEAM GUARDRAIL REPAIRIH 10 · | $213,835 | $266,840 | SYNERGY PROJECT CONTRACTORS, INC. | +24.8% | 3 |
| Mar 25, 2020 | 6356-52-001MMC - 635652001 | Colorado Yoakum |
HOT-MIX COLD-LAID (MATERIAL ONLY)IH 10 · | $299,200 | $264,000 | QUALITY HOT MIX, INC. | -11.8% | 4 |
| Mar 25, 2020 | 6356-20-001MMC - 635620001 | Fayette Yoakum |
AGGREGATES FOR SURFACE TREATMENTS (MATERIAL ONLY)IH 10 · | $294,000 | $252,915 | COLORADO MATERIALS, LTD. | -14.0% | 3 |
| Mar 25, 2020 | 6349-85-001RMC - 634985001 | Culberson El Paso |
BARRICADES, SIGNS, TRAFFIC CONTROLIH 10 · | $213,305 | $240,350 | APACHE BARRICADE & SIGN | +12.7% | 3 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.