18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jul 8, 2020 | 6364-93-001RMC - 636493001 | Kerr San Antonio |
PAVEMENT REPAIRSL 534 · | $989,435 | $959,228 | TEXAS MATERIALS GROUP, INC. | -3.1% | 7 |
| Jul 8, 2020 | 6353-47-001RMC - 635347001 | Angelina Lufkin |
MILL AND INLAYUS 59 · | $951,045 | $939,518 | MOORE BROTHERS CONSTRUCTION COMPANY | -1.2% | 2 |
| Jul 8, 2020 | 6348-08-001RMC - 634808001 | Tarrant Fort Worth |
ROADSIDE MOWING,HERBICIDE,LITTER REMOVAL,LANDSCAPEIH 20 · | $760,134 | $898,719 | JASCO | +18.2% | 2 |
| Jul 8, 2020 | 6365-10-001RMC - 636510001 | Victoria Yoakum |
ON CALL FLAGGING OPERATIONSUS 59 · | $975,000 | $846,000 | JCW CONSTRUCTION, LLC | -13.2% | 5 |
| Jul 8, 2020 | 0903-00-113C 903-00-113 | Wichita Wichita Falls |
INSTALL RUMBLE STRIPSVA · | $1,002,636 | $743,602 | STRIPE-A-ZONE, INC. | -25.8% | 8 |
| Jul 8, 2020 | 0911-28-039BR 1602(207) | Houston Lufkin |
REPLACE BRIDGE AND APPROACHESCR · | $817,528 | $732,077 | STATELINE CONSTRUCTION, LLC | -10.5% | 8 |
| Jul 8, 2020 | 6351-45-001RMC - 635145001 | Montgomery Houston |
REFLECTIVE PAVEMENT MARKINGS (LONGLINE)FM 1488 · | $806,042 | $722,407 | INTERSTATE BARRICADES & MARKINGS, INC. | -10.4% | 6 |
| Jul 8, 2020 | 3256-03-097STP 2B20(012)HES | Harris Houston |
IMPROV TRF SIGNALS SAFETY LIGHTING AT INTERSECTIONSL 8 · | $767,517 | $709,810 | TRAF-TEX, INC. | -7.5% | 5 |
| Jul 8, 2020 | 1685-01-109STP 2020(970)HES | Harris Houston |
IMPROVE TRAFFIC SIGNALSFM 1960 · | $864,133 | $702,778 | STATEWIDE TRAFFIC SIGNAL COMPANY | -18.7% | 6 |
| Jul 8, 2020 | 0901-27-052STP 2019(785)TAPS | Red River Paris |
HIKE AND/OR BIKEVA · | $668,333 | $682,513 | ENCINO LANDSCAPE, INC. | +2.1% | 6 |
| Jul 8, 2020 | 0903-00-116STP 2B20(038)HES | Wichita Wichita Falls |
INSTALL RUMBLE STRIPSVA · | $899,939 | $637,259 | STRIPE-A-ZONE, INC. | -29.2% | 9 |
| Jul 8, 2020 | 6359-12-001RMC - 635912001 | Johnson Fort Worth |
GUARDRAIL AND CABLE BARRIER REPAIRIH 35W · | $881,439 | $609,442 | JCW CONSTRUCTION, LLC | -30.9% | 3 |
| Jul 8, 2020 | 0913-18-035BR 1802(789) | Jackson Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $563,109 | $495,981 | CONSTAR CONSTRUCTION | -11.9% | 5 |
| Jul 8, 2020 | 0905-12-044BR 1802(835) | Hale Lubbock |
BRIDGE REPLACEMENTCR · | $381,373 | $436,230 | BLACKSTONE CONCRETE VENTURES, LLC | +14.4% | 4 |
| Jul 8, 2020 | 0681-08-024STP 2020(982)HES | Clay Wichita Falls |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 174 · | $270,145 | $367,887 | PEACHTREE CONSTRUCTION, LTD. | +36.2% | 2 |
| Jul 8, 2020 | 6362-77-001RMC - 636277001 | Hill Waco |
TREE TRIM, BRUSH REM, DRIFTWOOD & DEBRIS REMOVALFM 310 · | $390,799 | $362,572 | PATHFIELD INVESTMENTS LLC | -7.2% | 3 |
| Jul 8, 2020 | 6362-43-001MMC - 636243001 | Nacogdoches Lufkin |
MATERIAL ONLY (FLEXIBLE BASE)FM 2782 · | $377,500 | $330,000 | LONGVIEW ASPHALT, INC. | -12.6% | 3 |
| Jul 8, 2020 | 0908-00-101STP 2B20(011) | Taylor Abilene |
LANDSCAPEVA · | $288,709 | $326,024 | ENCINO LANDSCAPE, INC. | +12.9% | 4 |
| Jul 8, 2020 | 0235-02-047STP 2020(948) | Edwards San Angelo |
LED FLASHING CHEVRONS ON CURVESSH 55 · | $299,860 | $116,358 | L. UNITED BUILDING COMPANY | -61.2% | 7 |
| Jun 30, 2020 | 6352-42-001RMC - 635242001 | Concho San Angelo |
BRIDGE IDENTIFICATION NUMBERSUS 83 · | $155,300 | $88,628 | CANNON ASPHALT GROUP LLC | -42.9% | 17 |
| Jun 24, 2020 | 6361-54-001MMC - 636154001 | Brewster El Paso |
LIMESTONE ROCK ASPHALT (MATERIAL ONLY)SH 118 · | $146,127 | $144,309 | VULCAN CONSTRUCTION MATERIALS, LLC | -1.2% | 2 |
| Jun 12, 2020 | 6357-70-001RMC - 635770001 | Lubbock Lubbock |
ILLUMINATION MAINTENANCEIH 27 · | $246,506 | $261,763 | ARTEX ELECTRIC, INC. | +6.2% | 2 |
| Jun 12, 2020 | 6356-02-001MMC - 635602001 | Terry Lubbock |
ASPH PATCHING MATERIAL (MATERIAL ONLY)US 62 · | $150,000 | $176,380 | L A FULLER & SONS CONSTRUCTION, LTD. | +17.6% | 1 |
| Jun 12, 2020 | 6356-03-001MMC - 635603001 | Lamb Lubbock |
ASPH PATCH MATERIAL (MATERIAL ONLY)US 84 · | $125,000 | $133,780 | L A FULLER & SONS CONSTRUCTION, LTD. | +7.0% | 1 |
| Jun 12, 2020 | 6356-05-001MMC - 635605001 | Hale Lubbock |
ASPH PATCH MATERIAL (MATERIAL ONLY)IH 27 · | $125,000 | $128,210 | L A FULLER & SONS CONSTRUCTION, LTD. | +2.6% | 1 |
| Jun 12, 2020 | 6356-04-001MMC - 635604001 | Lubbock Lubbock |
ASPH PATCH MATERIAL (MATERIAL ONLY)IH 27 · | $50,000 | $54,490 | L A FULLER & SONS CONSTRUCTION, LTD. | +9.0% | 1 |
| Jun 11, 2020 | 6356-29-001RMC - 635629001 | Johnson Fort Worth |
POTHOLE REPAIRUS 67 · | $256,410 | $320,000 | PROENVIROTECH, INC. | +24.8% | 6 |
| Jun 11, 2020 | 6358-92-001RMC - 635892001 | Erath Fort Worth |
CLEANING AND SWEEPIN HIGHWAYSUS 377 · | $156,123 | $121,882 | TEXAS TMA RENTAL | -21.9% | 3 |
| Jun 9, 2020 | 6363-64-001RMC - 636364001 | Milam Bryan |
TREE REMOVALFM 486 · | $196,200 | $206,225 | K & R CONTRACTORS | +5.1% | 4 |
| Jun 9, 2020 | 6360-07-001RMC - 636007001 | Ellis Dallas |
SPECIALTY MARKINGSIH 35E · | $188,948 | $196,094 | STRIPING TECHNOLOGY, L.P. | +3.8% | 2 |
| Jun 9, 2020 | 6362-32-001MMC - 636232001 | Angelina Lufkin |
ASPHALT CUTBACK RC250 (MATERIAL ONLY)US 59 · | $138,875 | $179,230 | MARTIN RESOURCE MANAGEMENT CORPORATION | +29.1% | 1 |
| Jun 9, 2020 | 6360-68-001RMC - 636068001 | Ellis Dallas |
TREE & BRUSH REMOVAL AND TRIMMINGSH 34 · | $203,845 | $159,070 | TERRY ENTERPRISES | -22.0% | 7 |
| Jun 9, 2020 | 6360-21-001RMC - 636021001 | Collin Dallas |
TREE & BRUSH REMOVAL AND TRIMMINGSH 289 · | $176,962 | $142,036 | TERRY ENTERPRISES | -19.7% | 6 |
| Jun 9, 2020 | 6361-07-001MMC - 636107001 | San Jacinto Lufkin |
ASPHALT CUTBACK RC250 (MATERIAL ONLY)SH 150 · | $150,000 | $135,000 | MARTIN RESOURCE MANAGEMENT CORPORATION | -10.0% | 1 |
| Jun 9, 2020 | 6351-11-001RMC - 635111001 | Navarro Dallas |
FULL DEPTH CONCRETE REPAIRSH 31 · | $148,500 | $134,950 | ROY JORGENSEN ASSOCIATES, INC. | -9.1% | 4 |
| Jun 9, 2020 | 6363-62-001RMC - 636362001 | Washington Bryan |
INSTALL/REMOVE RAISED PAVEMENT MARKERSUS 290 · | $125,120 | $122,585 | BRYDL CONTRACTING, INC. | -2.0% | 2 |
| Jun 9, 2020 | 6357-01-001MMC - 635701001 | Houston Lufkin |
ASPHALT CUTBACK RC250 (MATERIAL ONLY)SL 304 · | $90,000 | $109,800 | MARTIN RESOURCE MANAGEMENT CORPORATION | +22.0% | 1 |
| Jun 9, 2020 | 6362-31-001MMC - 636231001 | Trinity Lufkin |
(MATERIAL ONLY) ASPHALT CUTBACK RC250US 287 · | $70,500 | $83,425 | MARTIN RESOURCE MANAGEMENT CORPORATION | +18.3% | 1 |
| Jun 9, 2020 | 6355-67-001MMC - 635567001 | Henderson Tyler |
CONCRETE MATERIALS ONLYUS 175 · | $59,800 | $61,400 | BIG CREEK CONSTRUCTION, LTD. | +2.7% | 1 |
| Jun 9, 2020 | 6355-70-001MMC - 635570001 | Cherokee Tyler |
CONCRETE MATERIAL_ONLYUS 79 · | $59,800 | $61,400 | BIG CREEK CONSTRUCTION, LTD. | +2.7% | 1 |
| Jun 9, 2020 | 6355-73-001MMC - 635573001 | Anderson Tyler |
CONCRETE MATERIALS ONLYSH 155 · | $59,800 | $61,400 | BIG CREEK CONSTRUCTION, LTD. | +2.7% | 1 |
| Jun 9, 2020 | 6356-94-001MMC - 635694001 | Nacogdoches Lufkin |
ASPHALT CUTBACK RC250 (MATERIAL ONLY)FM 343 · | $45,000 | $54,900 | MARTIN RESOURCE MANAGEMENT CORPORATION | +22.0% | 1 |
| Jun 9, 2020 | 6357-21-001MMC - 635721001 | Polk Lufkin |
(MATERIAL ONLY) ASPHALT CUTBACK RC250US 59 · | $27,000 | $24,300 | MARTIN RESOURCE MANAGEMENT CORPORATION | -10.0% | 1 |
| Jun 5, 2020 | 3559-02-007NH 2020(493) | Tarrant Fort Worth |
CONSTRUCT NEW ROADWAY LANESSH 170 · | $141,479,076 | $98,999,997 | ZACHRY CONSTRUCTION CORPORATION | -30.0% | 8 |
| Jun 5, 2020 | 0028-14-091NH 2020(966) | Orange Beaumont |
WIDEN EXISTING MAINLANES FROM 4 TO 6 LANESIH 10 · | $47,457,145 | $52,363,934 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | +10.3% | 3 |
| Jun 5, 2020 | 6349-05-001RMC - 634905001 | Galveston Houston |
LANDING MAINTENANCESH 87 · | $21,162,122 | $16,023,070 | TEXAS GULF CONSTRUCTION COMPANY, INC. | -24.3% | 2 |
| Jun 5, 2020 | 2121-03-060C 2121-3-60 | El Paso El Paso |
CONSTRUCT ASPHALT CONCRETE PVMNT MILL AND INLAYIH 10 · | $10,960,314 | $9,796,784 | DAN WILLIAMS COMPANY | -10.6% | 4 |
| Jun 5, 2020 | 7124-01-003FRA 2020(875) | Presidio El Paso |
INFRASTRUCTURE REHABILITATION TO RAIL LINERL SO · | $9,065,208 | $9,519,163 | RAILWORKS TRACK SYSTEMS, INC. | +5.0% | 1 |
| Jun 5, 2020 | 0451-01-055C 451-1-55 | Rockwall Dallas |
FLEXIBLE PAVEMENT REPAIR, MILL, OVERLAY, PAVEMENTSH 205 · | $7,233,818 | $6,382,563 | TEXAS MATERIALS GROUP, INC. | -11.8% | 6 |
| Jun 5, 2020 | 0139-03-047NH 2B20(021) | Reeves Odessa |
ROADWAY REHABILITATIONUS 285 · | $6,489,899 | $5,198,387 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | -19.9% | 11 |
| Jun 5, 2020 | 0367-06-064NH 2020(412) | Galveston Houston |
RENOVATIONS AT THE GALVESTON FERRYSH 87 · | $4,001,242 | $4,615,527 | TEXAS GULF CONSTRUCTION COMPANY, INC. | +15.4% | 1 |
| Jun 5, 2020 | 1013-01-034STP 2020(487)HES | Collin Dallas |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 546 · | $3,940,406 | $4,241,991 | A. K. GILLIS & SONS, LLC | +7.7% | 9 |
| Jun 5, 2020 | 0112-01-019STP 2020(906)HES | Kimble San Angelo |
SAFETY TREAT FIXED OBJECTSUS 290 · | $5,108,595 | $4,234,053 | RELMCO, INC. | -17.1% | 4 |
| Jun 5, 2020 | 0330-01-033BR 2019(848) | Bowie Atlanta |
REPLACE BRIDGES AND APPROACHESSH 98 · | $4,498,344 | $3,919,949 | EAST TEXAS BRIDGE, INC. | -12.9% | 6 |
| Jun 5, 2020 | 3278-01-003STP 2020(929)HES | Blanco Austin |
HAZARD ELIMINATION AND SAFETYRM 473 · | $3,895,930 | $3,837,576 | RAY FARIS, INC. | -1.5% | 4 |
| Jun 5, 2020 | 1903-01-012STP 2020(928)HES | Gillespie Austin |
HAZARD ELIMINATION AND SAFETYFM 2093 · | $3,834,480 | $3,785,507 | ALLEN KELLER COMPANY | -1.3% | 5 |
| Jun 5, 2020 | 0683-03-039STP 2020(965)HES | Hays Austin |
HIGHWAY IMPROVEMENTRM 12 · | $3,607,186 | $3,603,618 | LONE STAR SITEWORK, LLC | -0.1% | 7 |
| Jun 5, 2020 | 0228-06-095STP 2020(904)HES | Ector Odessa |
INSTALL TRAFFIC SIGNAL ADVANCE WARNING SIGNALSUS 385 · | $1,753,370 | $2,939,900 | REECE ALBERT, INC. | +67.7% | 2 |
| Jun 5, 2020 | 0180-04-130C 180-4-130 | Aransas Corpus Christi |
DEMOLITION OF EXISTING TIMBER STRUCTURESH 35 · | $2,602,670 | $2,681,504 | RUSSELL MARINE, LLC | +3.0% | 6 |
| Jun 5, 2020 | 0914-00-446STP 2020(967) | Travis Austin |
CONSTRUCT ADA CURB RAMPS, SIDEWALK & PED SIGNALSVA · | $2,650,698 | $2,592,102 | LONE STAR SITEWORK, LLC | -2.2% | 4 |
| Jun 5, 2020 | 6365-15-001RMC - 636515001 | Harris Houston |
DEBRIS REMOVAL AND DISPOSALIH 69 · | $2,679,000 | $2,122,400 | DRC EMERGENCY SERVICES, LLC | -20.8% | 5 |
| Jun 5, 2020 | 0322-01-051STP 2020(964)HES | Bastrop Austin |
HAZARD ELIMINATION & SAFETYSH 95 · | $1,843,085 | $1,850,412 | AARON CONCRETE CONTRACTORS, L.P. | +0.4% | 7 |
| Jun 5, 2020 | 0519-01-030STP 2020(490)HES | Johnson Fort Worth |
HAZARD ELIMINATION AND SAFETYSH 174 · | $2,044,215 | $1,837,416 | ACCELERATED CRITICAL PATH, INC. | -10.1% | 6 |
| Jun 5, 2020 | 6359-55-001RMC - 635955001 | Parker Fort Worth |
ROADSIDE MOWING AND HERBICIDEIH 20 · | $1,675,434 | $1,800,851 | CROSS PLUS CONSTRUCTION, LLC | +7.5% | 3 |
| Jun 5, 2020 | 0015-08-413C 15-8-413 | Williamson Austin |
LANDSCAPING & IRRIGATIONIH 35 · | $1,963,472 | $1,659,187 | APEX LANDSCAPE & IRRIGATION, LLC | -15.5% | 2 |
| Jun 5, 2020 | 0913-09-070BR 2014(680) | Wharton Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $1,358,189 | $1,496,611 | TREVWAY, INC. | +10.2% | 4 |
| Jun 5, 2020 | 0395-03-046STP 2020(883)HES | San Jacinto Lufkin |
CONSTRUCTION OF SAFETY WORKSH 150 · | $1,058,128 | $1,480,992 | DBI SERVICES, LLC | +40.0% | 2 |
| Jun 5, 2020 | 6364-91-001RMC - 636491001 | Jefferson Beaumont |
CALLOUT DEBRIS REMOVAL AND DISPOSALIH 10 · | $1,648,500 | $1,202,547 | TOM-MAC, INC. | -27.1% | 5 |
| Jun 5, 2020 | 0917-29-133STP 2019(462)TAPS | Brazos Bryan |
CONCRETE SIDEWALKS AND BIKE LANESCS · | $1,258,455 | $1,198,244 | TI-ZACK CONCRETE, INC. | -4.8% | 6 |
| Jun 5, 2020 | 0065-14-026STP 2020(781)HES | Hardin Beaumont |
TRAFFIC SIGNAL INSTALLATIONBU 96-F · | $1,203,929 | $1,167,485 | TRAF-TEX, INC. | -3.0% | 3 |
| Jun 5, 2020 | 0573-05-022STP 2020(916)HES | De Witt Yoakum |
SAFETY TREAT FIXED OBJECTSFM 240 · | $1,233,006 | $1,092,155 | REXCO CONSTRUCTION SERVICES, INC. | -11.4% | 6 |
| Jun 5, 2020 | 0176-01-112NH 2020(882) | Nacogdoches Lufkin |
WIDENING EXIST PAVEMENT FOR ACCELERATION LANEUS 59 · | $1,353,958 | $1,067,728 | MOORE BROTHERS CONSTRUCTION COMPANY | -21.1% | 5 |
| Jun 5, 2020 | 0005-15-090STP 2020(910)HES | Midland Odessa |
INSTALL TRAFFIC SIGNAL AND SAFETY LIGHTING AT INTEIH 20 · | $1,011,376 | $1,043,835 | WILLIS ELECTRIC CO., LP | +3.2% | 4 |
| Jun 5, 2020 | 0231-01-058STP 2020(832)HES | Lampasas Brownwood |
CONSTRUCT SIGNALIZED INTERSECTIONUS 190 · | $958,467 | $882,906 | TEXAS MATERIALS GROUP, INC. | -7.9% | 2 |
| Jun 5, 2020 | 0237-03-035STP 2020(668)HES | Webb Laredo |
FIXED OBJECT REPLACEMENT (MBGF) WITH SETSSH 44 · | $1,146,765 | $831,198 | VECTOR UTILITIES LLC | -27.5% | 7 |
| Jun 5, 2020 | 0134-15-013C 134-15-13 | Wise Fort Worth |
RESURFACE ROADWAYSL 373 · | $814,312 | $808,032 | NORTHEASTERN PAVERS, LLC | -0.8% | 7 |
| Jun 5, 2020 | 0753-02-022STP 2020(739)HES | Carson Amarillo |
SFT - SAFETY IMPROVEMENT PROJECTSFM 293 · | $735,917 | $799,569 | L A FULLER & SONS CONSTRUCTION, LTD. | +8.6% | 3 |
| Jun 5, 2020 | 0086-14-094C 86-14-94 | Webb Laredo |
INSTALLATION OF CONCRETE MEDIAN BARRIER.US 59 · | $634,701 | $688,548 | ANGEL BROTHERS HOLDINGS CORP. | +8.5% | 4 |
| Jun 5, 2020 | 6360-24-001RMC - 636024001 | Orange Beaumont |
OVERLAY ROADWAYFM 1130 · | $1,088,882 | $681,342 | TEXAS MATERIALS GROUP, INC. | -37.4% | 2 |
| Jun 5, 2020 | 6361-21-001MMC - 636121001 | Angelina Lufkin |
HOT MIX ASPHALT TYPE C & D (MATERIAL ONLY)US 59 · | $675,005 | $645,500 | EAST TEXAS ASPHALT CO., LTD. | -4.4% | 1 |
| Jun 5, 2020 | 6361-26-001MMC - 636126001 | Houston Lufkin |
HOT MIX ASPHALT TYPE C & D (MATERIAL ONLY)SL 304 · | $630,050 | $594,200 | VULCAN CONSTRUCTION MATERIALS, LLC | -5.7% | 3 |
| Jun 5, 2020 | 6359-50-001RMC - 635950001 | Jefferson Beaumont |
METAL BEAM GUARD FENCE REPAIRSIH 10 · | $583,770 | $583,680 | ELITE CASTLE RESOURCES LLC | 0.0% | 2 |
| Jun 5, 2020 | 6358-21-001RMC - 635821001 | Harris Houston |
PAVEMENT MARKINGS LONG LINEIH 69 · | $607,652 | $581,349 | BATTERSON, LLP | -4.3% | 6 |
| Jun 5, 2020 | 0923-06-058BR 2020(869) | Brown Brownwood |
REPLACE BRIDGE AND APPROACHESCR · | $556,091 | $570,000 | PIERCE R & B LLC | +2.5% | 7 |
| Jun 5, 2020 | 6361-28-001MMC - 636128001 | Trinity Lufkin |
HOT MIX ASPHALT TYPE D (MATERIAL ONLY)FM 356 · | $688,230 | $564,750 | VULCAN CONSTRUCTION MATERIALS, LLC | -17.9% | 2 |
| Jun 5, 2020 | 6361-05-001MMC - 636105001 | Shelby Lufkin |
HOTMIX ASPHALT TYPE C & D (MATERIAL ONLY)SH 7 · | $663,861 | $551,799 | EAST TEXAS ASPHALT CO., LTD. | -16.9% | 2 |
| Jun 5, 2020 | 6361-92-001RMC - 636192001 | Camp Atlanta |
INSTALLATION OF PAVEMENT MARKINGSFM 1975 · | $530,645 | $549,004 | STRIPING TECHNOLOGY, L.P. | +3.5% | 4 |
| Jun 5, 2020 | 6361-17-001MMC - 636117001 | Sabine Lufkin |
HOT MIX ASPHALT TYPE B & F (MATERIAL ONLY)FM 83 · | $505,330 | $530,250 | EAST TEXAS ASPHALT CO., LTD. | +4.9% | 1 |
| Jun 5, 2020 | 6361-08-001MMC - 636108001 | San Jacinto Lufkin |
HOT MIX ASPHALT TYPE C & D (MATERIAL ONLY)US 59 · | $581,110 | $516,880 | VULCAN CONSTRUCTION MATERIALS, LLC | -11.1% | 2 |
| Jun 5, 2020 | 6361-11-001MMC - 636111001 | Nacogdoches Lufkin |
HOT MIX ASPHALT TYPE B, C & D (MATERIAL ONLY)SL 224 · | $453,210 | $460,500 | LONGVIEW ASPHALT, INC. | +1.6% | 1 |
| Jun 5, 2020 | 6359-87-001RMC - 635987001 | Harris Houston |
PAVEMENT MARKINGSIH 10 · | $365,115 | $411,779 | INTERSTATE BARRICADES & MARKINGS, INC. | +12.8% | 3 |
| Jun 5, 2020 | 0205-07-078STP 2020(878)HES | Anderson Tyler |
IMPROVE AND INTERCONNECT SIGNALSUS 79 · | $367,685 | $406,417 | STRIPING TECHNOLOGY, L.P. | +10.5% | 1 |
| Jun 5, 2020 | 6362-56-001RMC - 636256001 | Lavaca Yoakum |
CRACK SEALUS 77 · | $426,313 | $401,994 | ICOS MANAGEMENT, LLC | -5.7% | 2 |
| Jun 5, 2020 | 0086-11-051STP 2020(900)HES | Jim Wells Corpus Christi |
MODERNIZE INTERSECTION FLASHING BEACONSH 44 · | $475,856 | $400,665 | MALDONADO-BURKETT, LLP | -15.8% | 4 |
| Jun 5, 2020 | 6361-09-001MMC - 636109001 | Polk Lufkin |
HOT MIX ASPHALT TYPE C & D (MATERIAL ONLY)US 59 · | $486,200 | $381,000 | VULCAN CONSTRUCTION MATERIALS, LLC | -21.6% | 2 |
| Jun 5, 2020 | 6360-74-001RMC - 636074001 | Orange Beaumont |
RUBBER ASPHALT CRACKSEALINGSH 62 · | $392,532 | $320,956 | D & M CONTRACTORS, LLC | -18.2% | 5 |
| Jun 5, 2020 | 6363-41-001RMC - 636341001 | Midland Odessa |
MEDIAN CABLE BARRIER REPAIRIH 20 · | $326,175 | $301,950 | ELITE CASTLE RESOURCES LLC | -7.4% | 3 |
| Jun 5, 2020 | 6353-66-001RMC - 635366001 | Webb Laredo |
CLEANING & CRACK SEALING OF HIGHWAYSIH 35 · | $324,938 | $252,680 | PAVEMENT PARTNERS, LLC | -22.2% | 4 |
| Jun 5, 2020 | 6353-67-001RMC - 635367001 | Val Verde Laredo |
CLEANING & CRACK SEALING OF HIGHWAYSUS 277 · | $318,771 | $252,430 | PAVEMENT PARTNERS, LLC | -20.8% | 4 |
| Jun 5, 2020 | 0736-02-017STP 2020(491)HES | Palo Pinto Fort Worth |
REHABILITATE EXISTING ROADWAYFM 129 · | $391,868 | $174,588 | TRP CONSTRUCTION GROUP, LLC | -55.4% | 5 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.