| 1 | 100-6001 |
PREPARING ROW | 0.1 | AC |
$5,000.00 |
$150,000.00 |
$30,000.00 |
$858,291.90 |
$100.00 |
$480,000.00 |
$12,000.00 |
| 2 | 420-6066 |
CL C CONC (RAIL FOUNDATION) | 4 | CY |
$600.00 |
$3,100.00 |
$900.00 |
$427.00 |
$2,000.00 |
$1,100.00 |
$1,870.00 |
| 3 | 450-6006 |
RAIL (TY T223) | 150 | LF |
$100.00 |
$240.00 |
$150.00 |
$244.00 |
$300.00 |
$375.00 |
$157.00 |
| 4 | 496-6012 |
REMOV STR (BRIDGE 1000 FT OR GREATER) | 1 | EA |
$2,200,000.00 |
$2,144,634.00 |
$2,500,000.00 |
$2,966,174.21 |
$2,900,000.00 |
$4,380,000.00 |
$8,640,000.00 |
| 5 | 500-6001 |
MOBILIZATION | 1 | LS |
$290,000.00 |
$350,000.00 |
$250,000.00 |
$200,000.00 |
$400,000.00 |
$495,000.00 |
$1,556,000.00 |
| 6 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 | MO |
$6,500.00 |
$1,000.00 |
$3,000.00 |
$4,270.00 |
$2,000.00 |
$16,000.00 |
$22,543.00 |
| 7 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 370 | LF |
$5.00 |
$66.00 |
$25.00 |
$24.40 |
$10.00 |
$20.00 |
$22.00 |
| 8 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 370 | LF |
$1.00 |
$14.00 |
$25.00 |
$12.20 |
$2.00 |
$9.00 |
$22.00 |
| 9 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 60 | LF |
$5.00 |
$16.00 |
$5.00 |
$30.50 |
$5.00 |
$18.00 |
$2.00 |
| 10 | 545-6012 |
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2) | 1 | EA |
$8,500.00 |
$24,500.00 |
$15,000.00 |
$19,520.00 |
$30,000.00 |
$28,000.00 |
$32,000.00 |
| 11 | 658-6059 |
INSTL OM ASSM (OM-4)(FLX)GND | 6 | EA |
$125.00 |
$1,185.00 |
$200.00 |
$305.00 |
$100.00 |
$450.00 |
$160.00 |
| 12 | 5048-6002 |
FLOATING TURBIDITY BARRIER(FUR & INST) | 500 | LF |
$25.00 |
$54.00 |
$35.00 |
$91.50 |
$200.00 |
$55.00 |
$260.00 |
| 13 | 5048-6003 |
FLOATING TURBIDITY BARRIER (REMOVE) | 500 | LF |
$5.00 |
$15.00 |
$20.00 |
$30.50 |
$100.00 |
$5.00 |
$260.00 |
| 14 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$8,000.00 |
$9,400.00 |
$1,000.00 |
$24,400.00 |
$5,000.00 |
$28,000.00 |
$24,000.00 |