239Let jobs
$1,225,369,730Total low bids
$1,237,773,799Total estimates
-1.0%Low bids vs estimates
Aug 2024 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 2, 2024 | 0353-05-128F 2B24(290) | Dallas Dallas |
REPAIR ROADWAYSL 12 · | $14,667,651 | $14,715,096 | FOUTSCO PAVING COMPANY, LLC | +0.3% | 6 |
| Aug 2, 2024 | 0074-01-062C 74-1-62 | Live Oak Corpus Christi |
RESURFACE ROADWAYIH 37 · | $17,609,534 | $14,385,828 | TEXAS MATERIALS GROUP, INC. | -18.3% | 3 |
| Aug 2, 2024 | 0852-02-013C 852-2-13 | La Salle Laredo |
REHABILITATE EXISTING ROADWAYFM 469 · | $14,758,446 | $12,342,228 | J. CARROLL WEAVER, INC. | -16.4% | 5 |
| Aug 2, 2024 | 0015-07-087STP 2024(924)TP | Bell Waco |
INFRASTRUCTURE IMPROVEMENTSIH 35 · | $12,215,676 | $12,103,561 | TEXAS MATERIALS GROUP, INC. | -0.9% | 6 |
| Aug 2, 2024 | 0195-03-088BR 2B24(289) | Denton Dallas |
BRIDGE REPLACEMENTIH 35E · | $13,211,118 | $11,749,150 | INDUS ROAD & BRIDGE, INC. | -11.1% | 6 |
| Aug 2, 2024 | 0048-04-106F 2B24(293) | Ellis Dallas |
REHABILITATE EXISTING ROADWAYIH 35E · | $10,755,475 | $9,843,419 | PEACHTREE CONSTRUCTION, LTD. | -8.5% | 7 |
| Aug 2, 2024 | 0340-01-043BR 2B24(380) | Houston Lufkin |
BRIDGE REPLACEMENTUS 287 · | $8,959,520 | $8,999,168 | MP HEAVY CONSTRUCTION INC | +0.4% | 6 |
| Aug 2, 2024 | 0176-05-201STP 2B24(377)HES | Polk Lufkin |
HAZARD ELIMINATION & SAFETYUS 59 · | $6,970,373 | $5,472,431 | SCOUT 5 CONSTRUCTION LLC | -21.5% | 4 |
| Aug 2, 2024 | 0197-04-086F 2B24(336) | Kaufman Dallas |
INTERSECTION IMPROVEMENTUS 175 · | $6,095,725 | $5,405,602 | GRANITE CONSTRUCTION COMPANY | -11.3% | 5 |
| Aug 2, 2024 | 0007-06-267C 7-6-267 | Eastland Brownwood |
SURFACING/ROADWAY RESTORATIONIH 20 · | $3,278,045 | $4,787,223 | HJC FARMS, INC. | +46.0% | 1 |
| Aug 2, 2024 | 0912-72-772F 2B24(351) | Harris Houston |
REHABILITATE BRIDGEVA · | $6,203,016 | $4,753,276 | ISI CONTRACTING, INC. | -23.4% | 4 |
| Aug 2, 2024 | 0185-03-033STP 2B24(387)HES | Milam Bryan |
INTERSECTION IMPROVEMENTS WITH TURN LANESUS 190 · | $2,941,639 | $3,193,317 | TEXAS MATERIALS GROUP, INC. | +8.6% | 4 |
| Aug 2, 2024 | 1844-01-029STP 2B24(354)VRU | Harris Houston |
HAZARD ELIMINATION & SAFETYFM 1959 · | $2,958,919 | $2,826,450 | SER CONSTRUCTION PARTNERS, LLC | -4.5% | 2 |
| Aug 2, 2024 | 1911-01-022STP 2B24(356)VRU | Galveston Houston |
HAZARD ELIMINATION & SAFETYFM 2004 · | $2,819,481 | $2,818,752 | MC2 CIVIL, LLC | 0.0% | 3 |
| Aug 2, 2024 | 0916-00-238F 2B24(425) | Nueces Corpus Christi |
HIGHWAY IMPROVEMENTVA · | $4,893,749 | $2,562,692 | HIGHWAY BARRICADES AND SERVICES, LLC | -47.6% | 6 |
| Aug 2, 2024 | 0902-90-207STP 2B24(404)VRUG | Tarrant Fort Worth |
REHABILITATE TRAFFIC SIGNALHU · | $2,367,808 | $2,474,213 | YUNEX LLC | +4.5% | 3 |
| Aug 2, 2024 | 0069-07-116F 2B24(366) | Tom Green San Angelo |
INSTALL TRAFFIC SIGNALUS 87 · | $2,221,106 | $2,447,859 | E-Z BEL CONSTRUCTION, LLC | +10.2% | 2 |
| Aug 2, 2024 | 0042-12-090BR 2024(847) | Childress Childress |
BRIDGE MAINTENANCEUS 287 · | $2,886,075 | $2,390,689 | ICOS MANAGEMENT, LLC | -17.2% | 8 |
| Aug 2, 2024 | 0924-00-168F 2B24(396) | El Paso El Paso |
ADVANCED TRAFFIC MANAGEMENT SYSTEMVA · | $2,125,590 | $2,231,207 | TRI STATE ELECTRIC, LTD. | +5.0% | 1 |
| Aug 2, 2024 | 0918-24-290STP 2B24(339)HES | Collin Dallas |
TRAFFIC SIGNAL IMPROVEMENTSCS · | $2,042,339 | $2,208,225 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +8.1% | 4 |
| Aug 2, 2024 | 0913-09-119BR 2B23(212) | Wharton Yoakum |
BRIDGE REPLACEMENTCO · | $2,107,469 | $2,156,908 | TREVWAY, INC. | +2.3% | 7 |
| Aug 2, 2024 | 6469-96-001MMC - 646996001 | Sherman Amarillo |
EMULSIONUS 54 · | $2,664,531 | $2,026,146 | ERGON ASPHALT & EMULSIONS, INC. | -24.0% | 2 |
| Aug 2, 2024 | 6463-63-001RMC - 646363001 | Brazoria Houston |
CONCRETE STRUCTURE REPAIRSH 288 · | $1,818,742 | $1,898,800 | MC2 CIVIL, LLC | +4.4% | 2 |
| Aug 2, 2024 | 0902-00-293C 902-00-293 | Tarrant Fort Worth |
INSTALL ILLUMINATIONVA · | $2,605,720 | $1,888,889 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | -27.5% | 4 |
| Aug 2, 2024 | 3417-03-032STP 2B24(410)HES | Travis Austin |
HAZARD ELIMINATION & SAFETYFM 734 · | $2,015,259 | $1,809,359 | THE LEVY COMPANY, INC. | -10.2% | 5 |
| Aug 2, 2024 | 6469-97-001MMC - 646997001 | Armstrong Amarillo |
EMULSIONSH 207 · | $2,356,171 | $1,759,440 | ERGON ASPHALT & EMULSIONS, INC. | -25.3% | 2 |
| Aug 2, 2024 | 6439-94-001RMC - 643994001 | Coke San Angelo |
CULVERTRM 2059 · | $1,814,404 | $1,693,487 | STX CIVIL | -6.7% | 5 |
| Aug 2, 2024 | 6470-42-001RMC - 647042001 | Bandera San Antonio |
MILL AND INLAYSH 16 · | $1,624,453 | $1,543,147 | TEXAS MATERIALS GROUP, INC. | -5.0% | 6 |
| Aug 2, 2024 | 6468-62-001RMC - 646862001 | Lamar Paris |
TRAFFIC CONTROL SERVICESUS 82 · | $2,314,000 | $1,542,915 | AWP SAFETY | -33.3% | 5 |
| Aug 2, 2024 | 6467-53-001MMC - 646753001 | Bell Waco |
HOT MIXUS 190 · | $1,488,800 | $1,496,929 | TEXAS MATERIALS GROUP, INC. | +0.5% | 4 |
| Aug 2, 2024 | 6469-95-001MMC - 646995001 | Gray Amarillo |
EMULSIONSH 70 · | $1,991,316 | $1,489,814 | ERGON ASPHALT & EMULSIONS, INC. | -25.2% | 2 |
| Aug 2, 2024 | 0165-01-109STP 2B24(305)VRU | Smith Tyler |
TRAFFIC SIGNAL IMPROVEMENTSUS 271 · | $1,449,886 | $1,416,148 | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | -2.3% | 4 |
| Aug 2, 2024 | 0902-41-002STP 2022(832)TAPS | Somervell |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREVA · | $1,628,621 | $1,348,858 | GARRET SHIELDS INFRASTRUCTURE | -17.2% | 7 |
| Aug 2, 2024 | 0049-12-150STP 2B24(359)HES | Brazos Bryan |
INSTALL CABLE MEDIAN BARRIERUS 190 · | $2,189,450 | $1,348,041 | MASSANA CONSTRUCTION INC. | -38.4% | 5 |
| Aug 2, 2024 | 1986-01-072STP 2B24(357)HES | Montgomery Houston |
HAZARD ELIMINATION & SAFETYFM 1314 · | $2,007,352 | $1,309,536 | SICE, INC. | -34.8% | 5 |
| Aug 2, 2024 | 6419-89-001RMC - 641989001 | Sutton San Angelo |
MILLINGUS 277 · | $1,160,880 | $1,277,999 | EMERY SAPP & SON'S INC. | +10.1% | 5 |
| Aug 2, 2024 | 0009-13-197F 2B24(374) | Hunt Paris |
HAZARD ELIMINATION & SAFETYIH 30 · | $1,350,648 | $1,270,585 | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | -5.9% | 4 |
| Aug 2, 2024 | 0008-02-079STP 2B24(302)HES | Parker Fort Worth |
INSTALL RAISED MEDIANUS 180 · | $1,719,354 | $1,239,440 | HJC FARMS, INC. | -27.9% | 5 |
| Aug 2, 2024 | 6470-41-001RMC - 647041001 | Bell Waco |
CRACK SEALFM 438 · | $1,145,632 | $1,167,326 | D & M CONTRACTORS, LLC | +1.9% | 5 |
| Aug 2, 2024 | 6469-76-001RMC - 646976001 | Live Oak Corpus Christi |
PAVEMENT MARKINGSUS 281 · | $2,079,982 | $1,055,857 | HIGHWAY BARRICADES AND SERVICES, LLC | -49.2% | 4 |
| Aug 2, 2024 | 0110-06-155STP 2B24(342)VRU | Harris Houston |
HAZARD ELIMINATION & SAFETYSS 261 · | $1,065,255 | $998,083 | STATEWIDE TRAFFIC SIGNAL COMPANY | -6.3% | 1 |
| Aug 2, 2024 | 0916-28-083BR 2024(947) | San Patricio Corpus Christi |
BRIDGE REPLACEMENTRI · | $906,124 | $977,757 | LUCANIA CONTRACTORS LLC | +7.9% | 8 |
| Aug 2, 2024 | 0915-12-716STP 2024(786)HESG | Bexar San Antonio |
TRAFFIC SIGNAL IMPROVEMENTSZA · | $1,006,758 | $880,880 | ELECNOR BELCO ELECTRIC, INC. | -12.5% | 2 |
| Aug 2, 2024 | 6467-34-001RMC - 646734001 | Bowie Atlanta |
RAISED PAVEMENT MARKERSUS 59 · | $1,075,005 | $858,521 | TRP INFRASTRUCTURE SERVICES, LLC | -20.1% | 5 |
| Aug 2, 2024 | 0178-03-159STP 2B24(344)HES | Brazoria Houston |
HAZARD ELIMINATION & SAFETYSH 35 · | $978,738 | $835,254 | TRAF-TEX, INC. | -14.7% | 3 |
| Aug 2, 2024 | 0918-47-457STP 2B24(223)HES | Dallas Dallas |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREVA · | $737,050 | $773,400 | GARRET SHIELDS INFRASTRUCTURE | +4.9% | 3 |
| Aug 2, 2024 | 6469-94-001MMC - 646994001 | Hemphill Amarillo |
SNOW AND ICE CONTROLUS 83 · | $724,724 | $726,393 | VOLCANIC STONE CO. | +0.2% | 2 |
| Aug 2, 2024 | 0502-01-237STP 2B24(345)HES | Harris Houston |
HAZARD ELIMINATION & SAFETYSH 225 · | $902,285 | $658,352 | TRAF-TEX, INC. | -27.0% | 3 |
| Aug 2, 2024 | 6409-05-001MMC - 640905001 | Travis Austin |
WINTER WEATHER MATERIALIH 35 · | $631,635 | $595,820 | SOUTHWEST ENVIROTX PARTNERS, LLC | -5.7% | 2 |
| Aug 2, 2024 | 0177-14-045STP 2B24(343)HES | Montgomery Houston |
HAZARD ELIMINATION & SAFETYSL 494 · | $745,470 | $573,846 | TRAF-TEX, INC. | -23.0% | 4 |
| Aug 2, 2024 | 6460-96-001RMC - 646096001 | Taylor Abilene |
CLEANING AND SEALING CRACKSIH 20 · | $666,507 | $553,523 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -17.0% | 4 |
| Aug 2, 2024 | 6467-55-001MMC - 646755001 | Bell Waco |
DE-ICING SALTUS 190 · | $537,675 | $529,033 | NSG LOGISTICS, LLC | -1.6% | 2 |
| Aug 2, 2024 | 0549-02-035C 549-2-35 | Fannin Paris |
INTERSECTION IMPROVEMENTSH 121 · | $528,887 | $516,689 | WG ENGINEERING & CONSTRUCTION, LLC | -2.3% | 3 |
| Aug 2, 2024 | 6469-88-001BPM - 646988001 | Wichita Wichita Falls |
BRIDGE PREVENTATIVE MAINTENANCEUS 287 · | $546,685 | $448,995 | ICOS MANAGEMENT, LLC | -17.9% | 12 |
| Aug 2, 2024 | 0113-09-077STP 2B24(415)HES | Travis Austin |
HAZARD ELIMINATION & SAFETYUS 290 · | $413,697 | $406,603 | DAN WILLIAMS COMPANY | -1.7% | 1 |
| Aug 2, 2024 | 0920-00-170F 2B24(406) | Jefferson Beaumont |
INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEMVA · | $260,000 | $181,194 | TRAF-TEX, INC. | -30.3% | 3 |
| Aug 1, 2024 | 0271-07-326C 271-7-326 | Harris Houston |
RECONSTRUCT EXISTING ROADWAYIH 10 · | $344,977,612 | $407,810,028 | WEBBER, LLC | +18.2% | 2 |
| Aug 1, 2024 | 0046-03-038F 2025(050) | Bowie Atlanta |
GRADING,STRUCT, ACP, CRCP & PAV MRKUS 82 · | $96,579,814 | $114,513,432 | DRAKE COMPANIES LLC | +18.6% | 2 |
| Aug 1, 2024 | 0327-04-037F 2B24(398) | Kenedy Pharr |
INTERSTATE DESIGNATIONUS 77 · | $40,574,001 | $33,508,386 | FOREMOST PAVING, INC. | -17.4% | 5 |
| Aug 1, 2024 | 2121-06-052F 2B24(070) | Hudspeth El Paso |
CONSTRUCT REST AREAIH 10 · | $24,305,693 | $20,919,512 | INTERNATIONAL EAGLE ENTERPRISES, INC. | -13.9% | 2 |
| Aug 1, 2024 | 0172-05-129F 2B24(322) | Ellis Dallas |
INTERSECTION IMPROVEMENTUS 287 · | $10,910,393 | $10,720,299 | TEXAS MATERIALS GROUP, INC. | -1.7% | 2 |
| Aug 1, 2024 | 0093-01-106F 2B24(067) | Navarro Dallas |
EMBANKMENT STABILIZATIONIH 45 · | $5,985,598 | $7,778,331 | FNH CONSTRUCTION, LLC | +30.0% | 3 |
| Aug 1, 2024 | 6465-25-001RMC - 646525001 | Palo Pinto Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRFM 919 · | $4,756,111 | $5,457,150 | NORTHEASTERN PAVERS, LLC | +14.7% | 1 |
| Aug 1, 2024 | 0134-01-027F 2B24(287) | Young Wichita Falls |
SURFACING/ROADWAY RESTORATIONSH 251 · | $4,748,282 | $4,490,410 | ZACK BURKETT CO. | -5.4% | 5 |
| Aug 1, 2024 | 0500-03-635C 500-3-635 | Harris Houston |
SURFACING/ROADWAY RESTORATIONIH 45 · | $5,144,476 | $4,137,771 | DURWOOD GREENE CONSTRUCTION CO. | -19.6% | 4 |
| Aug 1, 2024 | 6465-60-001RMC - 646560001 | Tarrant Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRIH 820 · | $4,319,936 | $4,068,900 | EUROVIA ATLANTIC COAST LLC | -5.8% | 5 |
| Aug 1, 2024 | 0601-04-013C 601-4-13 | Liberty Beaumont |
SURFACING/ROADWAY RESTORATIONFM 1009 · | $3,734,209 | $3,702,742 | VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC | -0.8% | 5 |
| Aug 1, 2024 | 6437-04-001RMC - 643704001 | Harris Houston |
BRIDGE REPAIRIH 610 · | $4,766,060 | $3,560,810 | ISI CONTRACTING, INC. | -25.3% | 2 |
| Aug 1, 2024 | 6450-69-001RMC - 645069001 | Parker Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRIH 20 · | $3,366,438 | $3,345,738 | JAGOE-PUBLIC COMPANY | -0.6% | 3 |
| Aug 1, 2024 | 0912-00-711C 912-00-711 | Harris Houston |
REHABILITATE BRIDGEVA · | $5,423,928 | $3,184,595 | RAGLE CONSTRUCTION, INC. | -41.3% | 5 |
| Aug 1, 2024 | 0918-11-110C 918-11-110 | Kaufman Dallas |
BICYCLE AND PEDESTRIAN IMPROVEMENTSVA · | $2,888,828 | $3,012,842 | FNH CONSTRUCTION, LLC | +4.3% | 4 |
| Aug 1, 2024 | 6470-10-001MMC - 647010001 | Bowie Atlanta |
LIMESTONE ROCK ASPHALTIH 30 · | $2,701,000 | $2,893,160 | VULCAN CONSTRUCTION MATERIALS, LLC | +7.1% | 2 |
| Aug 1, 2024 | 0907-00-237F 2B24(368) | Tom Green San Angelo |
TRAFFIC SURVEILLANCEVA · | $2,657,356 | $2,806,718 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +5.6% | 3 |
| Aug 1, 2024 | 6469-93-001MMC - 646993001 | Moore Amarillo |
DE-ICING SALTUS 87 · | $2,505,217 | $2,393,353 | UNITED SALT CORPORATION | -4.5% | 3 |
| Aug 1, 2024 | 0922-23-010BR 2B23(173) | Duval Laredo |
BRIDGE REPLACEMENTTO · | $2,644,774 | $2,301,233 | CK NEWBERRY, LLC | -13.0% | 7 |
| Aug 1, 2024 | 6470-28-001RMC - 647028001 | Comal San Antonio |
MILL AND INLAYSH 46 · | $2,608,172 | $2,292,837 | CLARK CONSTRUCTION OF TEXAS, INC. | -12.1% | 7 |
| Aug 1, 2024 | 6467-51-001MMC - 646751001 | McLennan Waco |
HOT MIXUS 84 · | $2,252,250 | $2,213,910 | TEXAS MATERIALS GROUP, INC. | -1.7% | 3 |
| Aug 1, 2024 | 6469-27-001MMC - 646927001 | Wood Tyler |
HOT MIXUS 80 · | $1,764,400 | $1,896,800 | TEXAS MATERIALS GROUP, INC. | +7.5% | 2 |
| Aug 1, 2024 | 6467-54-001MMC - 646754001 | Coryell Waco |
HOT MIXUS 84 · | $1,783,500 | $1,892,350 | BIG CREEK CONSTRUCTION, LTD. | +6.1% | 4 |
| Aug 1, 2024 | 6467-88-001RMC - 646788001 | Hunt Paris |
TRAFFIC CONTROL SERVICESIH 30 · | $2,021,144 | $1,785,001 | RHINO EQUITY, LLC | -11.7% | 3 |
| Aug 1, 2024 | 6467-50-001MMC - 646750001 | Hill Waco |
HOT MIXSH 81 · | $1,696,600 | $1,778,575 | BIG CREEK CONSTRUCTION, LTD. | +4.8% | 3 |
| Aug 1, 2024 | 0028-03-116STP 2B24(203)HES | Liberty Beaumont |
HAZARD ELIMINATION & SAFETYUS 90 · | $1,973,210 | $1,654,703 | 3LW CIVIL LLC | -16.1% | 11 |
| Aug 1, 2024 | 0911-28-063C 911-28-63 | Houston Lufkin |
SURFACING/ROADWAY RESTORATIONVA · | $823,652 | $1,536,462 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +86.5% | 1 |
| Aug 1, 2024 | 6466-87-001MMC - 646687001 | Grayson Paris |
AGGREGATEUS 75 · | $1,654,500 | $1,495,416 | RK HALL, LLC | -9.6% | 2 |
| Aug 1, 2024 | 0231-03-160F 2B24(459) | Bell Waco |
REPLACE MAINLANE STRIPINGIH 14 · | $1,995,966 | $1,467,609 | BATTERSON, LLP | -26.5% | 5 |
| Aug 1, 2024 | 6470-17-001MMC - 647017001 | Erath Fort Worth |
HOT MIXUS 377 · | $1,356,000 | $1,425,000 | NORTHEASTERN PAVERS, LLC | +5.1% | 1 |
| Aug 1, 2024 | 6466-59-001RMC - 646659001 | Harris Houston |
TRAFFIC CONTROL SERVICESSL 8 · | $1,604,385 | $1,287,900 | REPUBLIC TRAFFIC SAFETY, INC. | -19.7% | 6 |
| Aug 1, 2024 | 6467-08-001RMC - 646708001 | Calhoun Yoakum |
THERMOPLASTIC PAVEMENT MARKINGSSH 185 · | $1,986,616 | $1,257,941 | HIGHWAY BARRICADES AND SERVICES, LLC | -36.7% | 7 |
| Aug 1, 2024 | 0114-02-113STP 2B24(411)HES | Travis Austin |
HAZARD ELIMINATION & SAFETYUS 290 · | $1,511,336 | $1,219,421 | DAN WILLIAMS COMPANY | -19.3% | 3 |
| Aug 1, 2024 | 6470-02-001RMC - 647002001 | Brazos Bryan |
SPOT PAVEMENT MARKINGSSH 6 · | $1,854,000 | $1,138,950 | TRP INFRASTRUCTURE SERVICES, LLC | -38.6% | 8 |
| Aug 1, 2024 | 0921-02-501STP 2B24(399)VRUG | Hidalgo Pharr |
HAZARD ELIMINATION & SAFETYMI · | $1,112,465 | $1,125,348 | THE LEVY COMPANY, INC. | +1.2% | 3 |
| Aug 1, 2024 | 6470-61-001RMC - 647061001 | Garza Maintenance Division |
REHABILITATION OF EXISTING ROADWAYUS 84 · | $896,622 | $1,099,066 | WINDING ROAD CONSTRUCTION, INC. | +22.6% | 2 |
| Aug 1, 2024 | 6462-63-001RMC - 646263001 | Rusk Tyler |
TREE REMOVALUS 59 · | $1,015,331 | $1,069,580 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +5.3% | 4 |
| Aug 1, 2024 | 0686-02-032STP 2B24(175)VRU | Galveston Houston |
HAZARD ELIMINATION & SAFETYFM 1765 · | $1,693,032 | $1,024,066 | ALLSTATE SIGNAL & CONSTRUCTION, LLC | -39.5% | 6 |
| Aug 1, 2024 | 0055-15-082F 2B24(408) | McLennan Waco |
LANDSCAPE DEVELOPMENTUS 84 · | $983,606 | $1,013,078 | ENCINO LANDSCAPE, INC. | +3.0% | 6 |
| Aug 1, 2024 | 6469-91-001MMC - 646991001 | Randall Amarillo |
FLEXIBLE BASEIH 27 · | $1,074,068 | $999,165 | L A FULLER & SONS CONSTRUCTION, LTD. | -7.0% | 3 |
| Aug 1, 2024 | 6470-85-001MMC - 647085001 | Johnson Fort Worth |
HOT MIXIH 35W · | $991,305 | $979,138 | TEXAS MATERIALS GROUP, INC. | -1.2% | 3 |
| Aug 1, 2024 | 0916-29-019STP 2024(774)TAPS | Live Oak Corpus Christi |
CONSTRUCT PEDESTRIAN INFRASTRUCTUREVA · | $1,069,870 | $968,540 | MAKO CONTRACTING, LLC | -9.5% | 4 |
| Aug 1, 2024 | 0385-04-053STP 2B24(303)HES | Hood Fort Worth |
INSTALL RAISED MEDIANSH 144 · | $1,554,332 | $941,156 | ROADWAY SPECIALTIES, INC. | -39.4% | 4 |
| Aug 1, 2024 | 0117-05-059STP 2B24(386)HES | Madison Bryan |
CONSTRUCT TWO-WAY LEFT TURN LANESH 21 · | $802,040 | $938,332 | LARRY YOUNG PAVING, INC. | +17.0% | 4 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.