| 1 | 110-6003 |
EXCAVATION (SPECIAL) | 100 | CY |
$22.92 |
$21.00 |
$75.00 |
| 2 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 100 | CY |
$16.50 |
$45.00 |
$125.00 |
| 3 | 132-6035 |
EMBANK(FINAL)(DC)(TY E)(CSBE) | 50 | CY |
$69.50 |
$65.00 |
$190.00 |
| 4 | 401-6001 |
FLOWABLE BACKFILL | 50 | CY |
$425.00 |
$420.00 |
$250.00 |
| 5 | 429-6002 |
CONC STR REPAIR (EPOXY MORTAR) | 1,000 | SF |
$1,000.00 |
$110.00 |
$220.00 |
| 6 | 429-6003 |
CONC STR REPAIR(DECK REP(PART DEPTH)) | 155 | SF |
$408.33 |
$163.00 |
$250.00 |
| 7 | 429-6005 |
CONC STR REPAIR(DECK REP (FULL DEPTH)) | 155 | SF |
$55.00 |
$171.00 |
$275.00 |
| 8 | 429-6007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 2,000 | SF |
$598.75 |
$110.00 |
$180.00 |
| 9 | 429-6008 |
CONC STR REPR(RAPID VERT AND OVERHEAD) | 2,000 | SF |
$151.67 |
$110.00 |
$180.00 |
| 10 | 432-6006 |
RIPRAP (CONC)(CL B) | 50 | CY |
$997.88 |
$1,522.00 |
$1,200.00 |
| 11 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 50 | CY |
$249.56 |
$151.00 |
$300.00 |
| 12 | 438-6001 |
CLEANING AND SEALING EXISTING JOINTS | 8,000 | LF |
$27.83 |
$39.00 |
$30.00 |
| 13 | 438-6004 |
CLEANING AND SEALING EXIST JOINTS(CL7) | 5,000 | LF |
$42.50 |
$48.00 |
$60.00 |
| 14 | 438-6009 |
CLEANING EXISTING JOINTS | 8,000 | LF |
$15.00 |
$19.00 |
$35.00 |
| 15 | 442-6008 |
STR STEEL (MISCELLANEOUS BRIDGE) | 1,500 | LB |
$37.00 |
$20.00 |
$30.00 |
| 16 | 500-6033 |
MOBILIZATION (CALLOUT) | 12 | EA |
$550.14 |
$1,000.00 |
$2,000.00 |
| 17 | 500-6034 |
MOBILIZATION (EMERGENCY) | 8 | EA |
$944.44 |
$3,500.00 |
$5,000.00 |
| 18 | 721-6002 |
FIBER REINFORCED POLYMER PATCHING MATLS | 2,000 | LB |
$5.40 |
$3.00 |
$10.00 |
| 19 | 738-6011 |
CLEANING / SWEEPING (HANDWORK) | 1,000 | SY |
$2.03 |
$1.00 |
$2.00 |
| 20 | 780-6002 |
CNC CRACK REPAIR (DISCRETE)(INJECT) | 400 | LF |
$147.50 |
$123.00 |
$75.00 |
| 21 | 780-6010 |
CNC CRACK REPAIR (DISCRETE)(SURF SEAL) | 200 | LF |
$59.12 |
$65.00 |
$35.00 |
| 22 | 784-6034 |
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB) | 8 | EA |
$4,150.00 |
$9,395.00 |
$40,000.00 |
| 23 | 785-6002 |
BRIDGE JOINT REPAIR (POLYMER) | 60 | LF |
$477.00 |
$1,277.00 |
$350.00 |
| 24 | 785-6010 |
BRIDGE JOINT REPLACEMENT (ARMOR) | 440 | LF |
$600.00 |
$741.00 |
$1,100.00 |
| 25 | 785-6011 |
BRIDGE JOINT REPLACEMENT (SEJ) | 440 | LF |
$650.00 |
$764.00 |
$1,200.00 |
| 26 | 786-6002 |
CARBON FIBER REINF POLYMER STRENGTHNING | 550 | SF |
$160.00 |
$86.00 |
$250.00 |
| 27 | 788-6001 |
CONCRETE BEAM REPAIR | 5 | EA |
$2,500.00 |
$6,408.00 |
$40,000.00 |
| 28 | 788-6002 |
CONCRETE BEAM REPAIR (CFRP) | 5 | EA |
$23,700.00 |
$12,816.00 |
$60,000.00 |
| 29 | 788-6003 |
CONCRETE BEAM REP(STRAND SPLICE & CFRP) | 5 | EA |
$8,850.00 |
$19,759.00 |
$70,000.00 |
| 30 | 4207-6018 |
DEFLT PAINT SYS | 8 | EA |
$12,000.00 |
$10,000.00 |
$20,000.00 |
| 31 | 4207-6019 |
ALT PAINT SYS | 8 | EA |
$15,500.00 |
$20,000.00 |
$40,000.00 |
| 32 | 5087-6001 |
BIRD DETERRENT | 100 | LF |
$40.00 |
$71.00 |
$40.00 |
| 33 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 365 | DAY |
$139.04 |
$433.00 |
$200.00 |
| 34 | 6185-6002 |
TMA (STATIONARY) | 365 | DAY |
$495.82 |
$1,000.00 |
$400.00 |
| 35 | 6185-6003 |
TMA (MOBILE OPERATION) | 500 | HR |
$126.24 |
$350.00 |
$50.00 |