| 1 | 132-6019 |
EMBANKMENT (VEHICLE)(ORD COMP)(TY B) | 50 | CY |
$150.00 |
$35.00 |
| 2 | 150-6001 |
BLADING | 73 | STA |
$150.00 |
$45.00 |
| 3 | 164-6039 |
DRILL SEEDING (PERM) (URBAN) (CLAY) | 6,389 | SY |
$0.6300 |
$0.2500 |
| 4 | 168-6001 |
VEGETATIVE WATERING | 108 | MG |
$85.68 |
$10.00 |
| 5 | 169-6001 |
SOIL RETENTION BLANKETS (CL 1) (TY A) | 6,389 | SY |
$1.65 |
$1.20 |
| 6 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 282 | CY |
$550.00 |
$455.00 |
| 7 | 500-6001 |
MOBILIZATION | 1 | LS |
$37,500.00 |
$40,000.00 |
| 8 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 | MO |
$5,500.00 |
$20,000.00 |
| 9 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 1,000 | LF |
$6.10 |
$4.00 |
| 10 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,000 | LF |
$1.50 |
$1.00 |
| 11 | 543-6002 |
CABLE BARRIER SYSTEM (TL-4) | 6,422 | LF |
$14.00 |
$14.25 |
| 12 | 543-6020 |
CABLE BARRIER TERMINAL SECTION (TL-4) | 12 | EA |
$3,000.00 |
$4,000.00 |
| 13 | 644-6076 |
REMOVE SM RD SN SUP&AM | 2 | EA |
$125.00 |
$200.00 |
| 14 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 100 | DAY |
$125.69 |
$100.00 |
| 15 | 6185-6002 |
TMA (STATIONARY) | 80 | DAY |
$200.00 |
$100.00 |