117Let jobs
$825,697,888Total low bids
$845,062,254Total estimates
-2.3%Low bids vs estimates
Jul 2020 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jul 29, 2020 | 6360-40-001RMC - 636040001 | Johnson Fort Worth |
CRACKSEALIH 35W · | $97,732 | $154,716 | D & M CONTRACTORS, LLC | +58.3% | 3 |
| Jul 9, 2020 | 0025-02-215C 25-2-215 | Bexar San Antonio |
EXPAND 4 TO 6 LN EXPRESSWAY & FROM 4 TO 4 LN FRIH 10 · | $158,203,252 | $149,200,124 | ZACHRY CONSTRUCTION CORPORATION | -5.7% | 8 |
| Jul 9, 2020 | 0216-01-057STP 2B20(029)MM | Comal San Antonio |
CONSTRUCT GRADE SEPARATIONSL 337 · | $14,258,767 | $14,284,639 | HUNTER INDUSTRIES, LTD. | +0.2% | 8 |
| Jul 9, 2020 | 0063-03-065NH 2020(979) | Panola Atlanta |
REHABILITATE EXISTING 4 LANE HIGHWAYUS 59 · | $8,869,831 | $8,864,786 | LONGVIEW BRIDGE AND ROAD, LTD. | -0.1% | 4 |
| Jul 9, 2020 | 0088-05-104NH 2020(988) | Victoria Yoakum |
INSTALL MEDIAN BARRIER AND WIDEN ROADWAYUS 59 · | $6,402,470 | $6,878,588 | HUNTER INDUSTRIES, LTD. | +7.4% | 3 |
| Jul 9, 2020 | 0684-03-022STP 2B20(170) | Cameron Pharr |
REHABILITATE ROADWAYFM 1732 · | $5,976,836 | $6,603,454 | FOREMOST PAVING, INC. | +10.5% | 5 |
| Jul 9, 2020 | 1735-01-017STP 2B20(036)HES | Collin Dallas |
RECONST EXT PAV & PROVIDE ADD PAVED SURF WIDTHFM 1778 · | $7,060,395 | $5,875,117 | A. K. GILLIS & SONS, LLC | -16.8% | 9 |
| Jul 9, 2020 | 0179-03-034NH 2020(968) | Brazoria Houston |
PFC OVERLAYSH 35 · | $5,870,139 | $5,289,598 | ANGEL BROTHERS HOLDINGS CORP. | -9.9% | 3 |
| Jul 9, 2020 | 6362-99-001RMC - 636299001 | Lamar Paris |
SITE SPECIFIC MILL & INLAYUS 82 · | $5,462,029 | $4,785,265 | RK HALL, LLC | -12.4% | 4 |
| Jul 9, 2020 | 0204-06-060STP 2019(460)TAPS | Milam Bryan |
SIDEWALK, RAMPS, BENCHES & LIGHT'GUS 79 · | $5,504,346 | $4,509,032 | BIG CREEK CONSTRUCTION, LTD. | -18.1% | 7 |
| Jul 9, 2020 | 0902-50-131STP 2B20(190) | Johnson Fort Worth |
INSTALL CABLE BARRIER FENCEVA · | $5,577,010 | $3,988,518 | GRATIOT CONSTRUCTION, LTD. | -28.5% | 5 |
| Jul 9, 2020 | 6363-32-001RMC - 636332001 | Dallas Dallas |
FULL DEPTH CONCRETE REPAIRUS 80 · | $4,605,050 | $3,968,790 | O. TREVINO CONSTRUCTION, LLC | -13.8% | 3 |
| Jul 9, 2020 | 1482-01-014C 1482-1-14 | Fannin Paris |
REHABILITATE EXISTING ROADWAYFM 1550 · | $3,936,474 | $3,637,498 | HARRISON, WALKER AND HARPER, LP | -7.6% | 5 |
| Jul 9, 2020 | 3510-06-025C 3510-6-25 | Harris Houston |
LANDSCAPE DEVELOPMENTSH 99 · | $4,364,514 | $3,179,979 | CENTRAL NORTH CONSTRUCTION, LLC | -27.1% | 5 |
| Jul 9, 2020 | 0231-03-147STP 2020(941)MM | Bell Waco |
CONSTRUCT WEST TO EAST TURNAROUND @ FM 2410IH 14 · | $3,095,819 | $3,098,000 | J.D. ABRAMS, L.P. | +0.1% | 3 |
| Jul 9, 2020 | 0115-01-014STP 2020(958)HES | Guadalupe San Antonio |
SAFETY TREAT FIXED OBJECTSFM 20 · | $3,529,861 | $3,093,093 | THE TRUESDELL CORPORATION | -12.4% | 5 |
| Jul 9, 2020 | 0495-08-127C 495-8-127 | Harrison Atlanta |
TREE REMOVAL ON RIGHT OF WAYIH 20 · | $4,057,600 | $2,944,013 | A. L. HELMCAMP, INC. | -27.4% | 6 |
| Jul 9, 2020 | 1186-02-020STP 2B20(027) | Bastrop Austin |
LEVEL-UP, REPAIR, OVERLAY & PVMNT MRKFM 969 · | $3,181,151 | $2,826,333 | LONE STAR PAVING COMPANY | -11.2% | 5 |
| Jul 9, 2020 | 0014-23-038C 14-23-38 | Hill Waco |
ROADWAY LANE DEPARTURE - CABLE MEDIAN BARRIERSIH 35W · | $3,348,708 | $2,336,016 | GRATIOT CONSTRUCTION, LTD. | -30.2% | 6 |
| Jul 9, 2020 | 0908-19-026BR 1802(837) | Scurry Abilene |
BRIDGE REPLACEMENTCS · | $1,965,458 | $2,002,574 | HODGES AND SON CONSTRUCTION COMPANY, INC. | +1.9% | 5 |
| Jul 9, 2020 | 0114-01-063NH 2B20(025) | Travis Austin |
OVERLAY, MILL AND INLAY TOM FR ONLYUS 290 · | $2,131,694 | $1,949,774 | LONE STAR PAVING COMPANY | -8.5% | 3 |
| Jul 9, 2020 | 6365-04-001RMC - 636504001 | Medina San Antonio |
PAVEMENT REPAIRUS 90 · | $2,108,934 | $1,879,400 | CLARK CONSTRUCTION OF TEXAS, INC. | -10.9% | 7 |
| Jul 9, 2020 | 0458-01-025STP 2020(960)HES | Henderson Tyler |
GRADING,ACP BS&SURF, BS RPR, OCST,MBGF,SIGNS,PVMKFM 59 · | $1,754,399 | $1,730,130 | BIG CREEK CONSTRUCTION, LTD. | -1.4% | 6 |
| Jul 9, 2020 | 6353-48-001RMC - 635348001 | San Jacinto Lufkin |
OVERLAY & MILL AND INLAYUS 59 · | $2,305,792 | $1,721,052 | BIG CREEK CONSTRUCTION, LTD. | -25.4% | 4 |
| Jul 9, 2020 | 0074-03-047STP 2B20(013)HES | San Patricio Corpus Christi |
INSTALL ILLUMINATIONIH 37 · | $2,183,044 | $1,690,177 | TRAF-TEX, INC. | -22.6% | 5 |
| Jul 9, 2020 | 0911-00-082STP 2020(973) | Angelina Lufkin |
CONSTRUCTION OF PEDESTRIAN SIDEWALKS & CURB RAMPSVA · | $2,016,319 | $1,630,093 | PROJECT ALLIED RESOURCES, LLC | -19.2% | 8 |
| Jul 9, 2020 | 0920-00-129C 920-00-129 | Liberty Beaumont |
HAZARD ELIMINATION & SAFETYVA · | $1,448,102 | $1,556,025 | STRIPE-A-ZONE, INC. | +7.5% | 6 |
| Jul 9, 2020 | 0459-01-079STP 2020(953)HES | Freestone Bryan |
SAFETY TREAT FIXED OBJECTSFM 488 · | $1,407,021 | $1,492,224 | A. L. HELMCAMP, INC. | +6.1% | 4 |
| Jul 9, 2020 | 0906-00-190NH 2020(841) | Ector Odessa |
PAVEMENT MARKINGS (IH)VA · | $2,251,821 | $1,449,295 | VIZCAINO, L.P. | -35.6% | 8 |
| Jul 9, 2020 | 0906-00-191STP 2020(651) | Ector Odessa |
PAVEMENT MARKINGS (NON-IH)VA · | $2,627,798 | $1,241,992 | L&L COMPANY | -52.7% | 6 |
| Jul 9, 2020 | 0883-02-087STP 2020(146)HES | Orange Beaumont |
SFT - SAFETY IMPROVEMENTSFM 105 · | $1,210,853 | $1,226,990 | TEXAS MATERIALS GROUP, INC. | +1.3% | 2 |
| Jul 9, 2020 | 0071-03-041STP 2B20(024) | Mason Austin |
OVERLAYUS 87 · | $855,902 | $1,046,951 | LONE STAR PAVING COMPANY | +22.3% | 3 |
| Jul 9, 2020 | 6365-12-001RMC - 636512001 | De Witt Yoakum |
ON CALL FLAGGING OPERATIONSSH 111 · | $1,112,500 | $978,250 | JCW CONSTRUCTION, LLC | -12.1% | 4 |
| Jul 9, 2020 | 0911-40-029STP 2019(355)TAPS | Trinity Lufkin |
HIGHWAY IMPROVEMENTVA · | $795,247 | $975,968 | TI-ZACK CONCRETE, INC. | +22.7% | 2 |
| Jul 9, 2020 | 0231-02-064STP 2B20(063)HES | Coryell Waco |
IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALSBU 190E · | $955,126 | $905,128 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -5.2% | 3 |
| Jul 9, 2020 | 6357-03-001RMC - 635703001 | Wichita Wichita Falls |
BRIDGE PREVENTIVE MAINTENANCEUS 287 · | $893,524 | $903,670 | RESTEK, INC. | +1.1% | 9 |
| Jul 9, 2020 | 6361-72-001RMC - 636172001 | Jefferson Beaumont |
FLEXIBLE PAVEMENT STRUCTURE REPAIRIH 10 · | $1,140,732 | $902,312 | PTSS INVESTMENTS, LLC | -20.9% | 5 |
| Jul 9, 2020 | 0045-09-105STP 2020(939)HES | Lamar Paris |
HAZARD ELIMINATION & SAFETYBU 82-H · | $944,050 | $883,850 | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | -6.4% | 1 |
| Jul 9, 2020 | 6365-11-001RMC - 636511001 | Colorado Yoakum |
ON CALL FLAGGING OPERATIONSSH 71 · | $887,500 | $826,350 | SHORT-LINE CORPORATION | -6.9% | 6 |
| Jul 9, 2020 | 6357-67-001RMC - 635767001 | Grayson Paris |
FULL DEPTH CONCRETE REPAIRUS 75 · | $741,800 | $683,911 | O. TREVINO CONSTRUCTION, LLC | -7.8% | 4 |
| Jul 9, 2020 | 0903-00-112C 903-00-112 | Wichita Wichita Falls |
INSTALL SAFETY ILLUMINATIONVA · | $560,654 | $613,325 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +9.4% | 3 |
| Jul 9, 2020 | 6363-37-001RMC - 636337001 | Kimble San Angelo |
METAL BEAM GUARDFENCE REPAIR/UPGRADEIH 10 · | $624,910 | $577,089 | ELITE CASTLE RESOURCES LLC | -7.7% | 2 |
| Jul 9, 2020 | 0020-02-019C 20-2-19 | Culberson El Paso |
INSTALL CENTERLINE/SHOULDER RUMBLE STRIPSUS 90 · | $740,820 | $539,479 | CENTERLINE TECHNOLOGIES, LLC | -27.2% | 6 |
| Jul 9, 2020 | 0271-10-012C 271-10-12 | Fort Bend Houston |
LANDSCAPE & SCENIC ENHANCEMENTSUS 90 · | $457,109 | $538,631 | APEX LANDSCAPE & IRRIGATION, LLC | +17.8% | 4 |
| Jul 9, 2020 | 2121-02-171C 2121-2-171 | El Paso El Paso |
GREEN RIBBON LANDSCAPE IMPROVEMENTIH 10 · | $645,428 | $507,007 | INTERNATIONAL EAGLE ENTERPRISES, INC. | -21.4% | 7 |
| Jul 9, 2020 | 6365-58-001RMC - 636558001 | Cameron Pharr |
CLEANING AND SWEEPING OF HIGHWAYSBU 83S · | $682,579 | $496,748 | PAVEMENT PARTNERS, LLC | -27.2% | 3 |
| Jul 9, 2020 | 0013-05-063STP 2020(981)HES | Montague Wichita Falls |
INSTALL MEDIAN BARRIERUS 81 · | $521,855 | $482,811 | MASSANA, INC. | -7.5% | 5 |
| Jul 9, 2020 | 6362-21-001RMC - 636221001 | Galveston Houston |
ASPHALT PAVEMENT REPAIRSH 146 · | $480,623 | $481,515 | MAIN LANE INDUSTRIES LTD. | +0.2% | 3 |
| Jul 9, 2020 | 0913-29-048BR 2016(324) | Lavaca Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $369,133 | $469,444 | HILL COUNTRY BRIDGE, INC. | +27.2% | 7 |
| Jul 9, 2020 | 1068-01-228STP 2B20(008)HES | Tarrant Fort Worth |
HAZARD ELIMINATION & SAFETYIH 30 · | $502,860 | $466,497 | SELECT MAINTENANCE, L.L.C. | -7.2% | 5 |
| Jul 9, 2020 | 0914-00-449STP 2020(937) | Travis Austin |
LANDSCAPE & SCENIC ENHANCEMENTVA · | $570,928 | $428,805 | TIGHT LINE CONSTRUCTION, LLC | -24.9% | 4 |
| Jul 9, 2020 | 0914-33-079STP 2019(349)TAPS | Hays Austin |
PEDESTRIAN SIDEWALKS AND CURB RAMPSCS · | $423,347 | $396,803 | A GREATER AUSTIN DEVELOPMENT COMPANY, INC. | -6.3% | 7 |
| Jul 9, 2020 | 6362-34-001RMC - 636234001 | Kimble San Angelo |
CRACKSEAL_PROJECTUS 377 · | $395,059 | $342,668 | D & M CONTRACTORS, LLC | -13.3% | 2 |
| Jul 9, 2020 | 0495-08-129NH 2020(908) | Harrison Atlanta |
PLANT WILDFLOWERS ON R.O.W.IH 20 · | $350,800 | $241,346 | HX FARMS, INC. | -31.2% | 9 |
| Jul 9, 2020 | 6362-80-001RMC - 636280001 | Coryell Waco |
TREE TRIM,BRUSH,DRIFTWOOD & DEBRIS REMOVFM 184 · | $265,419 | $224,870 | CROSS PLUS CONSTRUCTION, LLC | -15.3% | 2 |
| Jul 9, 2020 | 6362-78-001RMC - 636278001 | McLennan Waco |
TREE TRIM, BRUSH, DRIFTWOOD & DEBRIS REMFM 185 · | $248,991 | $206,653 | CEN-TEX IRRIGATION SYSTEMS, INC. | -17.0% | 5 |
| Jul 9, 2020 | 0910-16-151C 910-16-151 | Smith Tyler |
DRAINAGE IMPROVEMENTS, STRS, EMBANKMENT & SEEDINGVA · | $149,744 | $177,736 | BAKER & COMPANY CONSTRUCTION, LLC | +18.7% | 8 |
| Jul 8, 2020 | 0074-05-098NH 2B20(014) | San Patricio Corpus Christi |
WIDEN FREEWAYIH 37 · | $79,704,837 | $111,997,767 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY | +40.5% | 2 |
| Jul 8, 2020 | 2552-03-049NH 2013(875) | El Paso El Paso |
WIDEN FROM 4 TO 6 LANES DIVIDEDSL 375 · | $72,014,802 | $75,428,369 | J.D. ABRAMS, L.P. | +4.7% | 4 |
| Jul 8, 2020 | 0015-08-147NH 2020(185) | Williamson Austin |
INTERCHANGE (NEW OR RECONSTRUCTED)IH 35 · | $60,342,307 | $61,721,948 | J.D. ABRAMS, L.P. | +2.3% | 6 |
| Jul 8, 2020 | 1685-03-058C 1685-3-58 | Harris Houston |
WIDEN FROM 4 TO 6 LANESFM 1960 · | $63,558,062 | $58,199,301 | ANGEL BROTHERS HOLDINGS CORP. | -8.4% | 6 |
| Jul 8, 2020 | 0353-03-100NH 2B20(006) | Tarrant Fort Worth |
WIDEN ROAD-ADD SHOULDERSSH 114 · | $35,077,363 | $31,553,079 | ZACHRY CONSTRUCTION CORPORATION | -10.0% | 7 |
| Jul 8, 2020 | 0523-08-007C 523-8-7 | Montgomery Houston |
WIDENING OF A NON-FREEWAYFM 1488 · | $31,340,369 | $29,787,408 | LINDSEY CONSTRUCTION, INC. | -5.0% | 7 |
| Jul 8, 2020 | 0249-08-042STP 2B20(004) | Palo Pinto Fort Worth |
CONSTRUCT NEW ROADWAY LANESUS 281 · | $26,052,555 | $22,988,076 | JAY MILLS CONTRACTING, INCORPORATED | -11.8% | 5 |
| Jul 8, 2020 | 0228-06-086NH 2B20(126) | Ector Odessa |
ROADWAY REHABILITATION & SAFETY IMPROVEMENTUS 385 · | $25,485,438 | $20,120,000 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -21.1% | 4 |
| Jul 8, 2020 | 0100-08-095C 100-8-95 | Bee Corpus Christi |
SURFACING/ROADWAY RESTORATIONUS 181 · | $17,136,769 | $14,739,738 | HUNTER INDUSTRIES, LTD. | -14.0% | 7 |
| Jul 8, 2020 | 0016-02-149NH 2020(853) | Hays Austin |
FREEWAY OPERATIONAL IMPROVEMENTSIH 35 · | $14,192,050 | $14,020,542 | HUNTER INDUSTRIES, LTD. | -1.2% | 2 |
| Jul 8, 2020 | 0133-03-038NH 2020(738) | Knox Childress |
SUPER 2US 82 · | $12,994,556 | $12,684,228 | A. L. HELMCAMP, INC. | -2.4% | 6 |
| Jul 8, 2020 | 1539-02-026STP 2020(046) | Travis Austin |
RECONSTRUCT EXST 2-LN RDWY TO A 4-LN RDWY W/CLTLFM 1626 · | $11,893,052 | $10,089,973 | ANGEL BROTHERS HOLDINGS CORP. | -15.2% | 5 |
| Jul 8, 2020 | 0573-01-039STP 2B20(067)HES | Bastrop Austin |
SAFETY IMPROVEMENT PROJECTSH 304 · | $8,646,475 | $7,305,240 | BIG CREEK CONSTRUCTION, LTD. | -15.5% | 5 |
| Jul 8, 2020 | 0255-04-099NH 2B20(153) | Brooks Maintenance Division |
INSTALL CABLE BARRIERUS 281 · | $8,073,768 | $6,056,600 | MASSANA, INC. | -25.0% | 5 |
| Jul 8, 2020 | 0275-01-215C 275-1-215 | Potter Amarillo |
HAZARD ELIMINATION & SAFETYIH 40 · | $4,447,234 | $4,539,711 | GILVIN-TERRILL, LTD. | +2.1% | 3 |
| Jul 8, 2020 | 0918-00-305NH 2B20(032) | Dallas Dallas |
INSTALL CABLE BARRIERSVA · | $3,849,255 | $4,220,770 | ALTUS CONSTRUCTION LLC | +9.7% | 8 |
| Jul 8, 2020 | 0166-03-033STP 2020(951)HES | Freestone Bryan |
SAFETY TREAT FIXED OBJECTSSH 75 · | $4,244,866 | $4,091,805 | BEAR CREEK CONTRACTING, LLC | -3.6% | 4 |
| Jul 8, 2020 | 2121-05-051C 2121-5-51 | El Paso El Paso |
INSTALL MEDIAN CABLE BARRIERIH 10 · | $5,397,225 | $4,020,480 | LESNA CONSTRUCTION, INC. | -25.5% | 11 |
| Jul 8, 2020 | 0910-00-127STP 2B20(022) | Smith Tyler |
SIDEWALKS & ADA PED RAMPSVA · | $4,112,570 | $3,512,939 | HIGHWAY 19 CONSTRUCTION LLC | -14.6% | 8 |
| Jul 8, 2020 | 6360-69-001RMC - 636069001 | Erath Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRUS 377 · | $2,751,395 | $3,141,214 | NORTHEASTERN PAVERS, LLC | +14.2% | 3 |
| Jul 8, 2020 | 0833-06-019STP 2020(942)HES | Falls Waco |
SAFETY TREAT FIXED OBJECTS, WIDEN PAVED SHOULDER TFM 2027 · | $3,402,505 | $3,054,891 | KNIFE RIVER CORPORATION - SOUTH | -10.2% | 4 |
| Jul 8, 2020 | 6363-01-001RMC - 636301001 | Grayson Paris |
SITE SPECIFIC FLEXIBLE PAVEMENT REPAIRFM 697 · | $3,330,430 | $2,960,213 | D. L. LENNON INCORPORATED - CONTRACTOR | -11.1% | 3 |
| Jul 8, 2020 | 0002-07-054C 2-7-54 | Hudspeth El Paso |
INSTALLATION OF QUEUE DETECTION SYSTEMIH 10 · | $2,707,251 | $2,841,820 | TRI STATE ELECTRIC, LTD. | +5.0% | 1 |
| Jul 8, 2020 | 0918-47-299NH 2B20(034) | Dallas Dallas |
CONSTRUCTION OF HAZARD ELIMINATION & SAFETY ON MLVA · | $2,785,968 | $2,753,152 | SELECT MAINTENANCE, L.L.C. | -1.2% | 9 |
| Jul 8, 2020 | 6359-17-001RMC - 635917001 | Haskell Abilene |
CALL OUT TRAFFIC CONTROLUS 277 · | $2,824,915 | $2,744,047 | AREA WIDE PROTECTIVE, INC. | -2.9% | 3 |
| Jul 8, 2020 | 0172-06-094BR 2B20(020) | Tarrant Fort Worth |
BRIDGE MAINTENANCESS 280 · | $3,411,858 | $2,609,024 | GIBSON & ASSOCIATES, INC. | -23.5% | 6 |
| Jul 8, 2020 | 3138-01-029STP 2020(954)HES | Brazos Bryan |
INSTALL RAISED MEDIANFM 2347 · | $2,515,560 | $2,417,982 | LARRY YOUNG PAVING, INC. | -3.9% | 4 |
| Jul 8, 2020 | 0769-02-033STP 2020(940) | Lamar Paris |
REHABILITATE EXISTING ROADWAYFM 906 · | $2,691,911 | $2,265,146 | D. L. LENNON INCORPORATED - CONTRACTOR | -15.9% | 7 |
| Jul 8, 2020 | 0039-04-129STP 2020(986)HES | Hidalgo Pharr |
IMPROVE TRAFFIC SIGNALSBU 83-S · | $2,219,526 | $2,216,224 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -0.1% | 3 |
| Jul 8, 2020 | 0024-02-075STP 2020(956)HES | Uvalde San Antonio |
INST ADV WARN SIGNS, LED FLASH CHEVRONS, PAV MRKSUS 90 · | $2,443,352 | $2,070,932 | E-Z BEL CONSTRUCTION, LLC | -15.2% | 1 |
| Jul 8, 2020 | 0204-01-068NH 2B20(026) | Williamson Austin |
OVERLAYUS 79 · | $2,221,852 | $1,976,494 | LONE STAR PAVING COMPANY | -11.0% | 4 |
| Jul 8, 2020 | 0911-00-103C 911-00-103 | Angelina Lufkin |
PROFILE PAVEMENT MARKINGS/MILLED RUMBLE STRIPSVA · | $2,544,477 | $1,943,451 | STRIPE-A-ZONE, INC. | -23.6% | 6 |
| Jul 8, 2020 | 0920-00-128C 920-00-128 | Jefferson Beaumont |
HAZARD ELIMINATION & SAFETYVA · | $1,597,233 | $1,799,977 | STRIPE-A-ZONE, INC. | +12.7% | 7 |
| Jul 8, 2020 | 6364-26-001MMC - 636426001 | Morris Atlanta |
MATERIAL ONLY, (LRA)US 259 · | $1,890,000 | $1,784,410 | VULCAN CONSTRUCTION MATERIALS, LLC | -5.6% | 2 |
| Jul 8, 2020 | 0008-13-234CM 2B20(019) | Tarrant Fort Worth |
CONSTRUCT RAMPSIH 20 · | $1,680,876 | $1,779,730 | SEMA CONSTRUCTION, INC. | +5.9% | 9 |
| Jul 8, 2020 | 0906-00-230C 906-00-230 | Ector Odessa |
SAFETY LIGHTINGVA · | $2,073,361 | $1,741,329 | WILLIS ELECTRIC CO., LP | -16.0% | 3 |
| Jul 8, 2020 | 6363-00-001RMC - 636300001 | Hopkins Paris |
SITE SPECIFIC FULL DEPTH CONCRETE REPAIRIH 30 · | $1,611,688 | $1,413,270 | O. TREVINO CONSTRUCTION, LLC | -12.3% | 4 |
| Jul 8, 2020 | 0909-40-075BR 2018(476) | Limestone Waco |
REPLACE BRIDGE AND APPROACHESCR · | $1,443,255 | $1,360,592 | A. L. HELMCAMP, INC. | -5.7% | 10 |
| Jul 8, 2020 | 0011-09-073C 11-9-73 | Stephens Brownwood |
PROFILE MARKINGS & MILLED RUMBLE STRIPSUS 180 · | $1,553,567 | $1,289,678 | L&L COMPANY | -17.0% | 6 |
| Jul 8, 2020 | 0919-00-080STP 2020(980) | Cass Atlanta |
SEAL COAT PAVEMENT MARKINGSVA · | $1,516,997 | $1,260,630 | STRIPE-A-ZONE, INC. | -16.9% | 3 |
| Jul 8, 2020 | 6360-00-001RMC - 636000001 | Navarro Dallas |
VEGETATION MANAGEMENTIH 45 · | $1,196,189 | $1,192,205 | CLASSIC IRRIGATION & LANDSCAPE LLC | -0.3% | 3 |
| Jul 8, 2020 | 6364-93-001RMC - 636493001 | Kerr San Antonio |
PAVEMENT REPAIRSL 534 · | $989,435 | $959,228 | TEXAS MATERIALS GROUP, INC. | -3.1% | 7 |
| Jul 8, 2020 | 6353-47-001RMC - 635347001 | Angelina Lufkin |
MILL AND INLAYUS 59 · | $951,045 | $939,518 | MOORE BROTHERS CONSTRUCTION COMPANY | -1.2% | 2 |
1–100 of 117Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.