| 1 | 110-6003 |
EXCAVATION (SPECIAL) | 11.5 | CY |
$61.15 |
$550.00 |
| 2 | 401-6001 |
FLOWABLE BACKFILL | 30 | CY |
$250.00 |
$450.00 |
| 3 | 416-6003 |
DRILL SHAFT (30 IN) | 175 | LF |
$225.00 |
$450.00 |
| 4 | 416-6005 |
DRILL SHAFT (42 IN) | 125 | LF |
$240.00 |
$525.00 |
| 5 | 416-6006 |
DRILL SHAFT (48 IN) | 84 | LF |
$365.00 |
$575.00 |
| 6 | 432-6001 |
RIPRAP (CONC)(4 IN) | 18.75 | CY |
$348.78 |
$500.00 |
| 7 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 89 | CY |
$335.48 |
$500.00 |
| 8 | 500-6001 |
MOBILIZATION | 1 | LS |
$150,000.00 |
$86,000.00 |
| 9 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 | MO |
$10,000.00 |
$5,200.00 |
| 10 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 1,025 | LF |
$25.14 |
$36.00 |
| 11 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 6 | EA |
$1,055.00 |
$2,500.00 |
| 12 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 6 | EA |
$2,992.00 |
$4,800.00 |
| 13 | 618-6023 |
CONDT (PVC) (SCH 40) (2") | 8,069 | LF |
$11.00 |
$12.50 |
| 14 | 618-6024 |
CONDT (PVC) (SCH 40) (2") (BORE) | 644 | LF |
$24.24 |
$45.00 |
| 15 | 618-6029 |
CONDT (PVC) (SCH 40) (3") | 25,131 | LF |
$16.25 |
$16.50 |
| 16 | 618-6030 |
CONDT (PVC) (SCH 40) (3") (BORE) | 1,996 | LF |
$33.50 |
$35.00 |
| 17 | 620-6002 |
ELEC CONDR (NO.14) INSULATED | 31,470 | LF |
$0.8000 |
$1.00 |
| 18 | 620-6008 |
ELEC CONDR (NO.8) INSULATED | 11,103 | LF |
$1.60 |
$1.95 |
| 19 | 620-6010 |
ELEC CONDR (NO.6) INSULATED | 16,706 | LF |
$1.60 |
$2.25 |
| 20 | 620-6012 |
ELEC CONDR (NO.4) INSULATED | 5,256 | LF |
$1.65 |
$3.00 |
| 21 | 624-6002 |
GROUND BOX TY A (122311)W/APRON | 32 | EA |
$1,564.71 |
$1,250.00 |
| 22 | 624-6019 |
GROUND BOX TY 1 (364860)W/APRON | 26 | EA |
$1,800.00 |
$3,850.00 |
| 23 | 624-6022 |
GROUND BOX TY 2 (366048)W/APRON | 15 | EA |
$4,218.50 |
$6,500.00 |
| 24 | 628-6225 |
ELC SRV TY D 120/240 100(NS)GS(N)GC(O) | 6 | EA |
$7,470.00 |
$6,800.00 |
| 25 | 650-6028 |
INS OH SN SUP(30 FT BAL TEE) | 3 | EA |
$26,700.00 |
$31,000.00 |
| 26 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 20 | DAY |
$106.15 |
$125.00 |
| 27 | 6003-6001 |
ITS SYSTEM SUPPORT EQUIPMENT | 1 | LS |
$15,000.00 |
$25,000.00 |
| 28 | 6007-6011 |
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER) | 1,213 | LF |
$5.00 |
$12.00 |
| 29 | 6007-6015 |
FIBER OPTIC CBL (SNGLE-MODE)(72 FIBER) | 30,257 | LF |
$8.00 |
$5.05 |
| 30 | 6007-6023 |
FIBER OPTIC PATCH PANEL (12 POSITION) | 15 | EA |
$3,000.00 |
$2,600.00 |
| 31 | 6007-6025 |
FIBER OPTIC PATCH PANEL (72 POSITION) | 1 | EA |
$4,500.00 |
$4,500.00 |
| 32 | 6007-6087 |
FO SPLICE ENCLOSURE (TYPE 1) | 15 | EA |
$2,013.37 |
$3,500.00 |
| 33 | 6008-6023 |
ITS GRND MNT CAB (TY 4) (CONF 1) | 1 | EA |
$15,700.00 |
$11,500.00 |
| 34 | 6008-6043 |
ITS GRND MNT CAB (TY 6) (CONF 2) | 1 | EA |
$15,000.00 |
$12,000.00 |
| 35 | 6010-6011 |
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY) | 5 | EA |
$1,353.78 |
$450.00 |
| 36 | 6064-6010 |
ITS POLE (30 FT)(90 MPH) | 7 | EA |
$8,720.00 |
$7,800.00 |
| 37 | 6064-6046 |
ITS POLE (55 FT)(90 MPH) | 5 | EA |
$21,000.00 |
$9,800.00 |
| 38 | 6064-6084 |
ITS POLE MNT CAB (TY 2)(CONF 2) | 12 | EA |
$6,133.05 |
$4,500.00 |
| 39 | 6064-6092 |
ITS POLE MNT CAB (TY 3)(CONF 2) | 3 | EA |
$7,200.00 |
$6,500.00 |
| 40 | 6137-6001 |
INSTALLATION OF VE | 1 | EA |
$600.00 |
$2,500.00 |
| 41 | 6137-6002 |
INSTALLATION OF VD | 1 | EA |
$600.00 |
$2,500.00 |
| 42 | 6137-6005 |
INSTALLATION OF FES (FIELD CABINET) | 16 | EA |
$600.00 |
$1,250.00 |
| 43 | 6137-6006 |
INSTALLATION OF FES (HUB CABINET) | 3 | EA |
$600.00 |
$2,500.00 |
| 44 | 6185-6002 |
TMA (STATIONARY) | 207 | DAY |
$209.13 |
$350.00 |
| 45 | 6304-6003 |
ITS RVSD (DC ONLY) (INSTALL ONLY) | 11 | EA |
$600.00 |
$450.00 |
| 46 | 6322-6001 |
COLOR DMS (POLE MNT CABINET) | 3 | EA |
$172,000.00 |
$160,500.00 |
| 47 | 6386-6001 |
INSTALLATION OF CELLULAR MODEM | 2 | EA |
$1,200.00 |
$9,500.00 |
| 48 | 6395-6001 |
CENTRAL PROCESSING UNIT | 1 | EA |
$25,000.00 |
$105,000.00 |
| 49 | 6403-6001 |
6001 SYSTEM INTEGRATION | 1 | LS |
$50,000.00 |
$45,000.00 |