118Let jobs
$627,719,289Total low bids
$614,111,675Total estimates
+2.2%Low bids vs estimates
May 2019 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| May 30, 2019 | 6335-60-001BPM - 633560001 | Wharton Yoakum |
EROSION REPAIRSUS 59 · | $298,292 | $409,819 | FNH CONSTRUCTION, LLC | +37.4% | 3 |
| May 8, 2019 | 0265-04-062NH 2019(613) | Bastrop Austin |
STR, GR, BASE, HMACP & PVMT MRKSSH 21 · | $48,524,348 | $50,359,853 | CAPITAL EXCAVATION COMPANY | +3.8% | 9 |
| May 8, 2019 | 3538-01-035STP 2019(952) | Montgomery Houston |
WIDEN FROM 2 TO 4 LANESSH 242 · | $40,937,493 | $36,793,630 | WILLIAMS BROTHERS CONSTRUCTION CO., INC. | -10.1% | 9 |
| May 8, 2019 | 0017-06-085NH 2019(900) | Frio San Antonio |
BASE REPAIR, SEALCOAT, OVERLAY & PAV MRK ON MAINLNIH 35 · | $28,275,867 | $25,532,106 | ANDERSON COLUMBIA CO., INC. | -9.7% | 4 |
| May 8, 2019 | 0313-02-057CM 2019(249) | Parker Fort Worth |
REHABILITATION OF EXISTING ROADFM 51 · | $20,831,841 | $23,361,070 | STERLING DELAWARE HOLDING COMPANY, INC. | +12.1% | 5 |
| May 8, 2019 | 0183-03-050STP 2019(839) | Hamilton Waco |
ADD PASS LNSSH 36 · | $11,978,826 | $12,587,706 | BIG CREEK CONSTRUCTION, LTD. | +5.1% | 3 |
| May 8, 2019 | 0222-01-058STP 2019(849) | Titus Atlanta |
CEMENT TRT,FL BS,SURF & PAV MARKSSH 49 · | $13,387,563 | $11,689,371 | EAST TEXAS BRIDGE, INC. | -12.7% | 5 |
| May 8, 2019 | 1899-01-018STP 2019(909) | Kendall San Antonio |
GRD, BSE, SURF, PAV'T MRKINGSRM 1376 · | $10,224,309 | $10,189,263 | Curran Contracting Company | -0.3% | 4 |
| May 8, 2019 | 0266-05-048STP 2019(730) | Wharton Yoakum |
ADD 2 LANES FOR 4-LANE UNDIVIDEDSH 71 · | $10,961,080 | $9,682,167 | HUNTER INDUSTRIES, LTD. | -11.7% | 4 |
| May 8, 2019 | 0833-03-045STP 2019(842)HES | McLennan Waco |
SFTY TR FX OBJSFM 1637 · | $9,385,341 | $9,304,002 | KNIFE RIVER CORPORATION - SOUTH | -0.9% | 3 |
| May 8, 2019 | 0836-02-073STP 2019(835)MM | Bell Waco |
TRNARND UNDRPSSH 195 · | $7,343,910 | $8,482,506 | TEXAS MATERIALS GROUP, INC. | +15.5% | 4 |
| May 8, 2019 | 0090-09-006BR 2019(915) | Oldham Amarillo |
2018 BMIP REPAIR BRIDGEBI 40-- · | $5,959,636 | $7,204,392 | GILVIN-TERRILL, LTD. | +20.9% | 2 |
| May 8, 2019 | 1586-01-076STP 2019(893) | Hidalgo Pharr |
REHABILITATE ROADWAYFM 907 · | $6,095,618 | $6,912,455 | TEXAS CORDIA CONSTRUCTION, LLC | +13.4% | 3 |
| May 8, 2019 | 0133-03-046NH 2019(833) | Knox Childress |
REHABILITATION OF EXISTING ROADWAYUS 82 · | $5,995,770 | $6,581,608 | A. L. HELMCAMP, INC. | +9.8% | 2 |
| May 8, 2019 | 1392-01-041STP 2019(932)HES | Collin Dallas |
PROVIDE ADDITIONAL PAVED SURFACE WIDTHFM 1378 · | $5,163,363 | $6,073,071 | JAGOE-PUBLIC COMPANY | +17.6% | 4 |
| May 8, 2019 | 2075-02-065NH 1902(022) | Smith Tyler |
PLN,BS RPR,SUPERPV,MEMB UNDRSL,PFC O/L,PV MKSL 323 · | $4,555,867 | $4,993,647 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | +9.6% | 2 |
| May 8, 2019 | 0162-03-042STP 2019(930)HES | Navarro Dallas |
INSTALL CABLE BARRIERSSH 31 · | $6,423,991 | $4,889,741 | GRATIOT CONSTRUCTION, LTD. | -23.9% | 10 |
| May 8, 2019 | 0102-04-105NH 2019(962) | Kleberg Corpus Christi |
OVERLAY ROADWAYUS 77 · | $4,374,607 | $4,658,417 | HAAS-ANDERSON CONSTRUCTION, LTD. | +6.5% | 3 |
| May 8, 2019 | 1812-01-023STP 2019(950) | Harris Houston |
BS RPR,MILL,SC,ACP OL,ADD LN & PAV MRKGFM 1942 · | $3,739,630 | $4,658,245 | DURWOOD GREENE CONSTRUCTION CO. | +24.6% | 2 |
| May 8, 2019 | 0208-02-045STP 2019(845) | Harrison Atlanta |
GRADING,CEM TRT BASE,ACP & PV MRKSSH 43 · | $4,890,559 | $4,592,940 | H. V. CAVER, INC. | -6.1% | 4 |
| May 8, 2019 | 8408-15-006BR 2019(910) | Comal San Antonio |
REHABILITATE BRIDGE & APPROACHESMH · | $4,568,464 | $4,518,896 | CAPITAL EXCAVATION COMPANY | -1.1% | 5 |
| May 8, 2019 | 0044-06-075NH 2019(956) | Montague Wichita Falls |
PAVEMENT REPAIR AND OVERLAYUS 82 · | $3,803,972 | $4,024,791 | JAGOE-PUBLIC COMPANY | +5.8% | 2 |
| May 8, 2019 | 0912-73-216STP 2019(949) | Galveston Houston |
UPGRADE MBGFVA · | $3,945,318 | $3,789,500 | TALBRAN ENTERPRISES LLC | -3.9% | 6 |
| May 8, 2019 | 0180-10-083C 180-10-83 | San Patricio Corpus Christi |
MILL AND INLAYSH 361 · | $3,466,771 | $3,356,713 | HAAS-ANDERSON CONSTRUCTION, LTD. | -3.2% | 3 |
| May 8, 2019 | 0912-31-296BR 1502(627) | Brazoria Houston |
REPLACE BRIDGE AND APPROACHESCR · | $2,529,569 | $2,849,524 | STERLING DELAWARE HOLDING COMPANY, INC. | +12.6% | 6 |
| May 8, 2019 | 0915-00-210STP 2019(903) | Bexar San Antonio |
INTERSECTION OPERATIONAL IMPROVEMENTSVA · | $2,550,498 | $2,758,844 | RELMCO, INC. | +8.2% | 2 |
| May 8, 2019 | 0867-07-013STP 2019(478)HES | San Saba Brownwood |
IMPROVE GUARDRAIL-SAFETY TREAT OBJECTS-PAVED SHLDRRM 501 · | $2,557,938 | $2,687,868 | BIG CREEK CONSTRUCTION, LTD. | +5.1% | 2 |
| May 8, 2019 | 0113-13-178BR 2019(828) | Travis Austin |
REHABILITATE BRIDGESL 360 · | $2,181,581 | $2,484,393 | SCR CIVIL CONSTRUCTION, LLC | +13.9% | 3 |
| May 8, 2019 | 0782-03-020STP 2019(958) | Cooke Wichita Falls |
PAVEMENT REPAIR AND OVERLAYFM 1201 · | $2,511,258 | $2,392,784 | EUROVIA ATLANTIC COAST LLC | -4.7% | 4 |
| May 8, 2019 | 0567-01-020STP 2019(840) | Coryell Waco |
WDN GR, STRS & SURFFM 107 · | $2,268,526 | $2,142,444 | BIG CREEK CONSTRUCTION, LTD. | -5.6% | 3 |
| May 8, 2019 | 0092-07-060NH 2019(927) | Dallas Dallas |
MILL,OVERLAY,AND FLEX PVMT REPAIRSH 356 · | $2,470,616 | $2,032,593 | PEACHTREE CONSTRUCTION, LTD. | -17.7% | 4 |
| May 8, 2019 | 0904-00-183STP 2019(917) | Potter Amarillo |
CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONSVA · | $2,144,554 | $1,985,313 | TI-ZACK CONCRETE, INC. | -7.4% | 3 |
| May 8, 2019 | 0915-12-566STP 2019(899)HES | Bexar San Antonio |
SIGNALS & ILLUMINATION, ETC.CS · | $2,005,524 | $1,774,683 | E-Z BEL CONSTRUCTION, LLC | -11.5% | 1 |
| May 8, 2019 | 0915-00-222STP 2019(904) | Bexar San Antonio |
DISTRICTWIDE PAVEMENT MARKINGS - FY 2019VA · | $1,499,137 | $1,519,049 | TRP CONSTRUCTION GROUP, LLC | +1.3% | 3 |
| May 8, 2019 | 0175-02-093C 175-2-93 | Shelby Lufkin |
RESURFACE WITH THIN OVERLAY MIXTUREUS 84 · | $1,388,381 | $1,365,032 | MOORE BROTHERS CONSTRUCTION COMPANY | -1.7% | 3 |
| May 8, 2019 | 6342-36-001RMC - 634236001 | McLennan Waco |
MBGF, CABLE BARRIER, BRIDGE RAIL REP/INSUS 84 · | $812,766 | $1,355,400 | VANN/ELLI, INC. | +66.8% | 1 |
| May 8, 2019 | 0320-03-100BR 2019(823) | Williamson Austin |
REHABILITATE BRIDGESH 95 · | $1,426,920 | $1,339,952 | FUQUA CONSTRUCTION CO., INC. | -6.1% | 3 |
| May 8, 2019 | 0002-06-055STP 2019(964)HES | Hudspeth El Paso |
INSTALL LED FLASHING CHEVRONIH 10 · | $1,474,894 | $1,232,441 | INTERNATIONAL EAGLE ENTERPRISES, INC. | -16.4% | 5 |
| May 8, 2019 | 0045-09-101STP 2019(939)HES | Lamar Paris |
SAFETY RELATED PROJECT - HSIPUS 82 · | $1,177,038 | $1,229,692 | 3LW CIVIL LLC | +4.5% | 3 |
| May 8, 2019 | 0065-04-079BR 2019(946) | Jasper Beaumont |
UPDATE BRIDGE AND APPROACH DETAILUS 96 · | $869,960 | $1,098,473 | SCR CIVIL CONSTRUCTION, LLC | +26.3% | 4 |
| May 8, 2019 | 0817-01-026STP 2019(976) | Denton Dallas |
MILL & INLAY, PAVEMENT REPAIR AND MARKINGSFM 428 · | $1,570,654 | $1,092,191 | JAGOE-PUBLIC COMPANY | -30.5% | 4 |
| May 8, 2019 | 0914-04-271BR 1502(647) | Travis Austin |
REPLACE BRIDGE & APPROACHESCR · | $935,814 | $1,078,645 | SB CONTRACTORS LLC | +15.3% | 6 |
| May 8, 2019 | 6341-39-001RMC - 634139001 | Harris Houston |
MNT OF VIVDSIH 610 · | $971,976 | $993,653 | THIRD COAST SERVICES LLC | +2.2% | 4 |
| May 8, 2019 | 6344-54-001RMC - 634454001 | Collin Dallas |
FLEXIBLE PAVEMENT MILL AND OVERLAYSH 5 · | $1,147,620 | $982,775 | PEACHTREE CONSTRUCTION, LTD. | -14.4% | 3 |
| May 8, 2019 | 0188-01-039NH 2019(911) | Fort Bend Houston |
SPALL REP, SEAL COAT, 3/4" TOM, SIGN, PAV MRKSH 36 · | $762,042 | $949,220 | JAMES CONSTRUCTION GROUP, L.L.C. | +24.6% | 3 |
| May 8, 2019 | 6342-18-001RMC - 634218001 | Collin Dallas |
POTHOLE AND EDGE REPAIRUS 75 · | $787,500 | $813,000 | DBI SERVICES, LLC | +3.2% | 2 |
| May 8, 2019 | 6344-68-001RMC - 634468001 | Pecos Odessa |
CALLOUT TRAFFIC CONTROL SERVICESIH 10 · | $700,650 | $782,603 | BARRICADES UNLIMITED | +11.7% | 1 |
| May 8, 2019 | 0160-07-032BR 1802(207) | Val Verde Laredo |
BRIDGE MAINTENANCEUS 277 · | $481,875 | $720,100 | SJ&J CONSTRUCTION, LLC | +49.4% | 2 |
| May 8, 2019 | 0037-03-083STP 2019(820)HES | Zavala Laredo |
PROFILE EDGELINE AND CENTERLINE MARKINGSUS 83 · | $960,836 | $687,075 | D. I. J. CONSTRUCTION, INC. | -28.5% | 9 |
| May 8, 2019 | 0907-00-171NH 2019(832) | Tom Green San Angelo |
BRIDGE RAIL AND BRIDGE REPAIRSVA · | $665,148 | $682,830 | RELMCO, INC. | +2.7% | 4 |
| May 8, 2019 | 6344-40-001RMC - 634440001 | Ector Odessa |
CALLOUT TRAFFIC CONTROL SERVICESIH 20 · | $700,650 | $618,803 | BARRICADES UNLIMITED | -11.7% | 1 |
| May 8, 2019 | 6344-67-001RMC - 634467001 | Midland Odessa |
CALLOUT TRAFFIC CONTROL SERVICESIH 20 · | $700,650 | $618,803 | BARRICADES UNLIMITED | -11.7% | 1 |
| May 8, 2019 | 0198-07-015STP 2019(882)HESG | Cherokee Tyler |
CENTERLINE & PROFILE PAVEMENT MARKINGSSH 204 · | $656,699 | $562,314 | STRIPE-A-ZONE, INC. | -14.4% | 4 |
| May 8, 2019 | 0205-06-032STP 2019(892)HES | Freestone Bryan |
INSTALL INTERSECTION FLASHING BEACONUS 79 · | $400,415 | $486,288 | BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC. | +21.4% | 2 |
| May 8, 2019 | 6343-25-001RMC - 634325001 | Galveston Houston |
FULL DEPTH CONCRETE REPAIRFM 518 · | $448,541 | $461,950 | ISI CONTRACTING, INC. | +3.0% | 2 |
| May 8, 2019 | 0913-22-046BR 1602(617) | Gonzales Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $404,782 | $399,752 | TMES LLC | -1.2% | 9 |
| May 8, 2019 | 1690-01-120STP 2019(943)HES | Lamar Paris |
SAFETY RELATED PROJECT - HSIPUS 271 · | $286,674 | $375,116 | EAST TEXAS BRIDGE, INC. | +30.9% | 3 |
| May 8, 2019 | 6344-27-001RMC - 634427001 | Lamar Paris |
ILLUMINATION MAINTENANCEUS 82 · | $297,210 | $307,223 | STRIPING TECHNOLOGY, L.P. | +3.4% | 1 |
| May 8, 2019 | 6326-49-001RMC - 632649001 | McLennan Waco |
DISTRICT WIDE MAINTENANCE OF ILLUMINATIONUS 84 · | $326,593 | $287,348 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | -12.0% | 4 |
| May 8, 2019 | 6326-50-001RMC - 632650001 | Bell Waco |
LARGE SIGN MAINTENANCEUS 190 · | $304,700 | $285,750 | CROSS PLUS CONSTRUCTION, LLC | -6.2% | 2 |
| May 8, 2019 | 0047-02-147STP 2019(940)HES | Grayson Paris |
SAFETY RELATED PROJECT - HSIPSH 91 · | $235,553 | $219,910 | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | -6.6% | 2 |
| May 8, 2019 | 3510-05-042STP 2019(951) | Harris Houston |
PAVEMENT WIDENING, STORM SEWER, AND PAV MARKINGSSH 99 · | $204,059 | $183,439 | TREVWAY, INC. | -10.1% | 2 |
| May 7, 2019 | 0048-09-029NH 2019(834) | Hill Waco |
WDN, GR, STRS, SURFIH 35E · | $121,792,371 | $133,117,086 | SACYR CONSTRUCTION USA LLC | +9.3% | 12 |
| May 7, 2019 | 0051-09-024NH 2019(988) | Galveston Houston |
INST CROSS CULV & OVERLAYFM 3005 · | $43,905,821 | $35,347,635 | ANGEL BROTHERS HOLDINGS CORP. | -19.5% | 3 |
| May 7, 2019 | 0095-14-029NH 2019(928) | Kaufman Dallas |
BRDG DECK REPL,RUBBLIZE,OVERLAY,PAV RPR, PAV MRKIH 20 · | $16,456,439 | $22,030,033 | TEXAS MATERIALS GROUP, INC. | +33.9% | 1 |
| May 7, 2019 | 1158-06-006C 1158-6-6 | Culberson El Paso |
ROADWAY REHABILITATIONFM 3541 · | $9,408,525 | $11,896,485 | INTERNATIONAL EAGLE ENTERPRISES, INC. | +26.4% | 2 |
| May 7, 2019 | 0006-07-080NH 2019(920) | Callahan Abilene |
MILL & SMA OVRLAYIH 20 · | $9,844,142 | $10,684,705 | A. L. HELMCAMP, INC. | +8.5% | 6 |
| May 7, 2019 | 0027-01-044BR 2019(850) | Colorado Yoakum |
CONSTRUCT ONE WAY BRIDGE AND APPRUS 90 · | $8,536,799 | $8,244,675 | HARPER BROTHERS CONSTRUCTION LLC | -3.4% | 4 |
| May 7, 2019 | 0179-04-099STP 2019(759) | Matagorda Yoakum |
ACP OVERLAY AND ADD SHOULDERSSH 35 · | $7,750,820 | $7,279,319 | DURWOOD GREENE CONSTRUCTION CO. | -6.1% | 4 |
| May 7, 2019 | 0838-03-024STP 2019(918) | Fort Bend Houston |
SHOULDERS, BASE REP, O/L, BRIDGE & PV MRKSFM 361 · | $7,095,365 | $7,225,989 | DURWOOD GREENE CONSTRUCTION CO. | +1.8% | 3 |
| May 7, 2019 | 0912-73-183C 912-73-183 | Galveston Houston |
CONSTRUCT NEW ROADSCR · | $5,816,585 | $6,676,661 | ANGEL BROTHERS HOLDINGS CORP. | +14.8% | 4 |
| May 7, 2019 | 0256-02-031STP 2019(921) | Stephens Brownwood |
PAVMT/STRUCTURE/DITCH REPAIR-SAFETY TRT-SEAL_COATSH 67 · | $5,348,242 | $5,063,902 | PEACHTREE CONSTRUCTION, LTD. | -5.3% | 3 |
| May 7, 2019 | 0247-03-032STP 2019(657)HES | Panola Atlanta |
ACP SURFACE & PAV MARKINGSUS 79 · | $4,684,581 | $4,609,876 | MADDEN CONTRACTING COMPANY, LLC. | -1.6% | 4 |
| May 7, 2019 | 1558-01-019C 1558-1-19 | Nueces Corpus Christi |
RESTORATION OF EXISTING ROADWAYFM 70 · | $4,218,585 | $4,592,255 | TIERRA LEASE SERVICE, LLC | +8.9% | 6 |
| May 7, 2019 | 0053-15-024STP 2018(628)HES | Nolan Abilene |
SAFETY TREAT ENDS & WIDEN PAVEMENTFM 608 · | $2,676,116 | $4,261,779 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | +59.3% | 2 |
| May 7, 2019 | 0915-00-223STP 2019(905) | Bexar San Antonio |
INTERSECTION OPERATIONAL IMPROVEMENTS-SOUTHVA · | $3,591,227 | $3,461,235 | CAPITAL EXCAVATION COMPANY | -3.6% | 6 |
| May 7, 2019 | 0720-03-134NH 2019(947) | Harris Houston |
INSTALL ITS EQUIPMENT & INFRASTRUCTURESH 249 · | $3,587,753 | $3,339,516 | SICE, INC. | -6.9% | 4 |
| May 7, 2019 | 0816-05-022STP 2019(931)HES | Collin Dallas |
FM 2862 · | $3,172,422 | $3,291,225 | A. K. GILLIS & SONS, INC. | +3.7% | 6 |
| May 7, 2019 | 6343-66-001RMC - 634366001 | Lamar Paris |
ON CALL MILL & INLAYUS 82 · | $3,007,861 | $3,130,824 | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | +4.1% | 3 |
| May 7, 2019 | 0035-01-035STP 2019(830)HES | Runnels San Angelo |
SAFETY TREAT FIXED OBJECTSUS 83 · | $2,387,845 | $3,077,659 | RELMCO, INC. | +28.9% | 2 |
| May 7, 2019 | 0001-03-058STP 2019(963)HES | El Paso El Paso |
IMPROVE TRAFFIC SIGNALSSH 20 · | $3,615,797 | $3,024,947 | TRI STATE ELECTRIC, LTD. | -16.3% | 1 |
| May 7, 2019 | 0918-00-295NH 2019(966) | Dallas Dallas |
CONSTRUCTION OF RUMBLE STRIPS AND PAVEMENT MARKINGVA · | $3,202,096 | $2,989,898 | STRIPE-A-ZONE, INC. | -6.6% | 5 |
| May 7, 2019 | 0495-08-116NH 2019(847) | Harrison Atlanta |
CEMENT TREAT BASE, ACP AND PAV MRKSIH 20 · | $2,526,187 | $2,388,394 | EAST TEXAS BRIDGE, INC. | -5.5% | 4 |
| May 7, 2019 | 0133-03-047STP 2019(772) | Knox Childress |
RECONSTRUCTION OF SAFETY REST AREAUS 82 · | $2,463,399 | $2,268,300 | ANTHONY INMAN CONSTRUCTION, INC. | -7.9% | 3 |
| May 7, 2019 | 0720-03-137STP 2019(948)HES | Harris Houston |
TRAFFIC SIGNAL IMPROVEMENTSSH 249 · | $2,219,969 | $2,179,892 | STATEWIDE TRAFFIC SIGNAL COMPANY | -1.8% | 3 |
| May 7, 2019 | 0041-05-052BR 2019(914) | Potter Amarillo |
REPLACE BRIDGE RAILUS 87 · | $1,652,756 | $1,849,686 | STATELINE CONSTRUCTION, LLC | +11.9% | 3 |
| May 7, 2019 | 6341-38-001RMC - 634138001 | Harris Houston |
LOOP DET REP AND/OR REPLMNTIH 610 · | $1,205,163 | $1,654,294 | SOUTHWEST SIGNAL SUPPLY, INC. | +37.3% | 2 |
| May 7, 2019 | 0915-17-067BR 2019(908) | Comal San Antonio |
REPLACE BRIDGE AND APPROACHESCS · | $1,790,990 | $1,589,567 | SB CONTRACTORS LLC | -11.2% | 11 |
| May 7, 2019 | 6342-37-001RMC - 634237001 | Atascosa San Antonio |
GUARDRAIL REPAIRSH 16 · | $1,618,901 | $1,471,268 | K-BAR SERVICES, INC. | -9.1% | 5 |
| May 7, 2019 | 0174-04-033STP 2019(941)HES | Fannin Paris |
HAZARD ELIMINATION & SAFETYFM 100 · | $1,455,374 | $1,423,585 | STRIPE-A-ZONE, INC. | -2.2% | 4 |
| May 7, 2019 | 0109-03-037STP 2019(864)HES | Houston Lufkin |
INSTALL SIGNS AND PAVEMENT MARKINGSUS 287 · | $1,124,506 | $1,390,005 | STRIPING TECHNOLOGY, L.P. | +23.6% | 1 |
| May 7, 2019 | 0915-00-209STP 2019(902) | Bexar San Antonio |
INTERSECTION OPERATIONAL IMPROVEMENTS-NORTHVA · | $1,628,273 | $1,371,713 | Curran Contracting Company | -15.8% | 5 |
| May 7, 2019 | 0914-00-400STP 2019(825) | Travis Austin |
FY 2019 SITE SPECIFIC SIGNALSVA · | $1,339,325 | $1,358,621 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +1.4% | 2 |
| May 7, 2019 | 0039-01-094STP 2019(953)HES | Starr Pharr |
CONSTRUCT MEDIAN CROSSOVERUS 83 · | $759,390 | $1,161,965 | REIM CONSTRUCTION, INC. | +53.0% | 3 |
| May 7, 2019 | 0166-07-062STP 2019(878)HES | Madison Bryan |
INSTALL CONTINUOUS LEFT TURN LANESH 75 · | $946,250 | $1,084,259 | ANGEL BROTHERS HOLDINGS CORP. | +14.6% | 1 |
| May 7, 2019 | 0391-03-031STP 2019(957) | Clay Wichita Falls |
REHABILITATE EXISTING SHOULDERS AND OVERLAYSH 148 · | $914,851 | $1,041,711 | ZACK BURKETT CO. | +13.9% | 4 |
| May 7, 2019 | 0435-01-079BR 2019(942) | Lamar Paris |
BRIDGE REPLACEMENTFM 137 · | $1,027,742 | $1,008,565 | HIGHWAY 19 CONSTRUCTION LLC | -1.9% | 7 |
| May 7, 2019 | 0092-02-129NH 2019(926) | Dallas Dallas |
INSTALL GUIDE SIGNSIH 45 · | $1,058,879 | $1,008,155 | CREATIVE DESIGN CONCEPTS, LLC | -4.8% | 6 |
| May 7, 2019 | 6330-76-001RMC - 633076001 | Denton Dallas |
FLEXIBLE PAVEMENT REPAIRFM 424 · | $838,327 | $994,626 | EUROVIA ATLANTIC COAST LLC | +18.6% | 3 |
| May 7, 2019 | 0909-38-080BR 2018(294) | Limestone Waco |
REPL BR & APPRSCR · | $1,056,773 | $933,888 | JAMES CONSTRUCTION GROUP, L.L.C. | -11.6% | 8 |
1–100 of 118Next ›
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.