Contact information
- bennie@jcarrollweaverinc.com
- Phone
- (361) 364-1569
- Fax
- (361) 364-4729
- Address
- 211 WEST WELDER, SINTON, TX 78387
- TxDOT prequalification
- Construction qualified
152BidsNov 6, 2013 to Oct 7, 2026
18Wins (low bidder)
11.8%Win rate
$106,355,553Total won
Competitor scorecard
Last 5 years in Texas17.7%Win rate11 of 62 bids
+0.8%Average bid vs estimate
-10.3%Winning bids vs estimate
+16.1%Over the low bid when they loseAverage field: 6.8 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| CK NEWBERRY, LLC | 54 | 27 | 27 | 50% |
| HUNTER INDUSTRIES, LTD. | 36 | 17 | 19 | 47% |
| ANDERSON COLUMBIA CO., INC. | 22 | 11 | 11 | 50% |
| STX CIVIL | 21 | 8 | 13 | 38% |
| ACME BRIDGE COMPANY, INC. | 17 | 10 | 7 | 59% |
| CLARK CONSTRUCTION OF TEXAS, INC. | 16 | 10 | 6 | 63% |
| J E CONSTRUCTION SERVICES, LLC | 16 | 8 | 8 | 50% |
| LCR TOTAL TRANSPORT LLC | 15 | 10 | 5 | 67% |
| SALINAS CONSTRUCTION TECHNOLOGIES, LTD. | 14 | 7 | 7 | 50% |
| BAY LTD. | 10 | 7 | 3 | 70% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Oct 7, 2026 | 0922-20-030 | Off-Syst Charlie Brown Rd @ DrawLa Salle · Laredo | 5 of 6 | $639,345 | $485,016PRESIDIO CONTRACTING, LLC | +31.8% |
| Sep 2, 2026 | 3632-01-002 | 363201002 SL 195 STARR (NEW LOC RELIEF)Starr · Pharr | 4 of 7 | $62,241,160 | $51,358,199IOC COMPANY LLC | +21.2% |
| Aug 6, 2026 | 0254-01-149 | FY 2029 US 281 Live Oak Co.Live Oak · Corpus Christi | 4 of 8 | $10,124,798 | $9,709,793STX CIVIL | +4.3% |
| Aug 5, 2026 | 0991-02-014 | FM 81 Karnes 181 to 1144 rehabKarnes · Corpus Christi | 7 of 9 | $10,746,061 | $8,343,314CLARK CONSTRUCTION OF TEXAS… | +28.8% |
| Jun 3, 2026 | 0916-26-024 | Lazy F RD(CR101)Goliad · Corpus Christi | 1 of 10 | $825,295 | $825,295 | Won |
| Jun 3, 2026 | 0916-37-038 | CR 308 Bridge Replacement HBPJim Wells · Corpus Christi | 4 of 8 | $935,814 | $877,585CK NEWBERRY, LLC | +6.6% |
| Jun 2, 2026 | 2150-04-080 | FM1472 Concrete PVMTWebb · Laredo | 2 of 7 | $3,107,871 | $2,951,706JAMES CONSTRUCTION GROUP, L… | +5.3% |
| Jun 2, 2026 | 0274-02-032 | US 183 MILLS C/L TO LOMETALampasas · Brownwood | 2 of 9 | $4,555,075 | $4,510,688BIG CREEK CONSTRUCTION, LTD. | +1.0% |
| Jun 2, 2026 | 0916-36-023 | CR 230 Bridge Replacement HBPKarnes · Corpus Christi | 10 of 10 | $1,037,493 | $817,325C & W SOUTHERN LLC | +26.9% |
| May 7, 2026 | 1271-01-013 | FM 1107; 1271-01-013; BRWilson · San Antonio | 14 of 17 | $1,388,823 | $948,875D&S CONCRETE CONTRACTORS LLC | +46.4% |
| May 6, 2026 | 0916-26-023 | PostOakRD Goliad At Manahuilla Cr BridgeGoliad · Corpus Christi | 9 of 13 | $1,450,415 | $1,135,008DELGADO'S CONTRACTORS, LLC | +27.8% |
| May 6, 2026 | 0142-09-049 | RM 473; 0142-09-049; SFTKendall · San Antonio | 4 of 7 | $4,427,015 | $4,095,968STX CIVIL | +8.1% |
| Apr 7, 2026 | 0922-48-004 | LA PALOMA RD AT GALLINA SLOUGHZavala · Laredo | 3 of 5 | $1,824,936 | $1,523,016ACEE CONSTRUCTION LLC. | +19.8% |
| Mar 4, 2026 | 0074-05-104 | SanPatIH37WFrontage234-CooperSan Patricio · Corpus Christi | 3 of 7 | $2,639,651 | $2,258,368ANDERSON COLUMBIA CO., INC. | +16.9% |
| Feb 5, 2026 | 0101-04-130 | US181 SanPat Mustang Mott SB BRGSan Patricio · Corpus Christi | 10 of 12 | $2,349,103 | $1,812,290LISKA CONSTRUCTION COMPANY,… | +29.6% |
| Jan 7, 2026 | 0922-20-031 | TPW Project - Chaparral WMALa Salle · Laredo | 6 of 8 | $935,517 | $714,669ACME BRIDGE COMPANY, INC. | +30.9% |
| Jan 6, 2026 | 0989-02-057 | FM 624 Nueces CR73 to Wildcat Add Lanes.Nueces · Corpus Christi | 4 of 4 | $38,126,365 | $30,814,865J E CONSTRUCTION SERVICES, … | +23.7% |
| Nov 5, 2025 | 0087-02-053 | SH359 JimWells FM624toSnPtCL Rhb/Wdn/PssJim Wells · Corpus Christi | 5 of 7 | $17,433,210 | $14,897,452CK NEWBERRY, LLC | +17.0% |
| Oct 8, 2025 | 6481-55-001 | FY2026 RMC Seal CoatJim Wells · Corpus Christi | 4 of 7 | $2,031,625 | $1,868,073RONALD R. WAGNER & CO., LP | +8.8% |
| Sep 5, 2025 | 1209-01-030 | FM893 SanPat Stark Rd to W CR79 Add LnsSan Patricio · Corpus Christi | 4 of 7 | $14,246,616 | $11,945,410BAY LTD. | +19.3% |
| Sep 4, 2025 | 6483-27-001 | 6483-27-001 Rehab and WideningSan Patricio · Corpus Christi | 2 of 10 | $1,663,170 | $1,459,019HUNTER INDUSTRIES, LTD. | +14.0% |
| Sep 4, 2025 | 0916-35-253 | CR 18 (CR 232) Nueces at Drainage DitchNueces · Corpus Christi | 7 of 9 | $1,712,655 | $1,410,757PRESIDIO CONTRACTING, LLC | +21.4% |
| Jul 10, 2025 | 6485-88-001 | Webb County Concrete TurnaroundWebb · Laredo | 1 of 1 | $1,340,905 | $1,340,905 | Won |
| Jul 1, 2025 | 3171-01-012 | FM 3084 REHABILITATE ROADWAY HSIP 2605Calhoun · Yoakum | 5 of 7 | $5,092,932 | $4,398,168CLARK CONSTRUCTION OF TEXAS… | +15.8% |
| Jun 5, 2025 | 0074-03-049 | IH 37 San Pat frontage rehab/widen2San Patricio · Corpus Christi | 1 of 6 | $8,068,785 | $8,068,785 | Won |
| Jun 5, 2025 | 2485-02-013 | 2485-02, SL517 Widen RDWY IlluminationDimmit · Laredo | 5 of 6 | $1,779,995 | $1,400,125HUNTER INDUSTRIES, LTD. | +27.1% |
| Jun 4, 2025 | 0916-29-016 | CR 216 Live Oak Salt Creek BridgeLive Oak · Corpus Christi | 5 of 7 | $7,536,249 | $4,876,307RELMCO, INC. | +54.5% |
| Jun 4, 2025 | 0482-01-037 | 0482-01-037 - SH 16Jim Hogg · Pharr | 2 of 4 | $5,742,692 | $5,520,580ANDERSON COLUMBIA CO., INC. | +4.0% |
| Apr 4, 2025 | 0613-01-070 | SAT_SH0016_1of2: 0613-01-070: SFTBexar · San Antonio | 5 of 6 | $9,890,971 | $8,862,445CK NEWBERRY, LLC | +11.6% |
| Apr 3, 2025 | 6480-88-001 | 6480-88-001 On Call rehab & wideningKarnes · Corpus Christi | 3 of 4 | $1,368,744 | $1,289,866HUNTER INDUSTRIES, LTD. | +6.1% |
| Mar 5, 2025 | 0515-04-034 | FM 530 SURFACING RESTORATION 2303Lavaca · Yoakum | 2 of 8 | $6,622,943 | $5,948,468HUNTER INDUSTRIES, LTD. | +11.3% |
| Feb 7, 2025 | 1499-01-032 | SAT_FM1581: 1499-01-032: SFTFrio · San Antonio | 5 of 7 | $838,347 | $614,054HUNTER INDUSTRIES, LTD. | +36.5% |
| Feb 6, 2025 | 0748-04-042 | FM 140: 0748-04-042; RERFrio · San Antonio | 5 of 6 | $17,728,824 | $14,824,127HUNTER INDUSTRIES, LTD. | +19.6% |
| Jan 8, 2025 | 1556-01-029 | CRP_FM0024_1_1_NUECES_HSIPNueces · Corpus Christi | 7 of 7 | $1,076,293 | $846,576SALINAS CONSTRUCTION TECHNO… | +27.1% |
| Nov 6, 2024 | 0086-16-008 | 0086-16, SL20 Interchange Lomas Del SurWebb · Laredo | 3 of 5 | $51,048,920 | $49,586,907ANDERSON COLUMBIA CO., INC. | +2.9% |
| Aug 2, 2024 | 0852-02-013 | REHABILITATE EXISTING ROADWAYLa Salle · Laredo | 1 of 5 | $12,342,228 | $12,342,228 | Won |
| Aug 2, 2024 | 0916-28-083 | BRIDGE REPLACEMENTSan Patricio · Corpus Christi | 3 of 8 | $991,812 | $977,757LUCANIA CONTRACTORS LLC | +1.4% |
| Aug 1, 2024 | 0922-23-010 | BRIDGE REPLACEMENTDuval · Laredo | 6 of 7 | $3,000,817 | $2,301,233CK NEWBERRY, LLC | +30.4% |
| Aug 1, 2024 | 0916-28-082 | BRIDGE REPLACEMENTSan Patricio · Corpus Christi | 3 of 8 | $898,092 | $867,436CK NEWBERRY, LLC | +3.5% |
| Jun 6, 2024 | 0848-04-052 | REHABILITATE EXISTING ROADWAYMedina · San Antonio | 2 of 8 | $7,223,627 | $6,964,197SALINAS CONSTRUCTION TECHNO… | +3.7% |
| Jun 6, 2024 | 1087-01-018 | WIDEN ROAD - ADD SHOULDERSJim Wells · Corpus Christi | 4 of 7 | $2,466,083 | $1,993,022CLARK CONSTRUCTION OF TEXAS… | +23.7% |
| Jun 5, 2024 | 0922-33-198 | BRIDGE REPLACEMENTWebb · Laredo | 1 of 6 | $4,378,550 | $4,378,550 | Won |
| Jun 5, 2024 | 0916-35-230 | BRIDGE REPLACEMENTNueces · Corpus Christi | 4 of 4 | $766,579 | $649,4013LW CIVIL LLC | +18.0% |
| Jun 5, 2024 | 0375-03-017 | WIDEN SHLDRS, FL BS, SURF TREAT, SETS, & PAV. MK.Maverick · Laredo | 1 of 7 | $1,757,674 | $1,757,674 | Won |
| Jun 5, 2024 | 0916-37-036 | BRIDGE REPLACEMENTJim Wells · Corpus Christi | 1 of 5 | $1,411,096 | $1,411,096 | Won |
| May 3, 2024 | 0301-01-087 | WIDEN ROAD - ADD SHOULDERSDimmit · Laredo | 3 of 7 | $4,136,538 | $4,036,048TEXAS MATERIALS GROUP, INC. | +2.5% |
| May 2, 2024 | 2234-02-009 | WIDEN ROAD - ADD SHOULDERSKarnes · Corpus Christi | 2 of 8 | $8,138,799 | $8,073,873CK NEWBERRY, LLC | +0.8% |
| Apr 5, 2024 | 1133-02-030 | SURFACING/ROADWAY RESTORATIONGonzales · Yoakum | 2 of 11 | $5,116,190 | $4,879,726BIG CREEK CONSTRUCTION, LTD. | +4.8% |
| Mar 5, 2024 | 0507-01-021 | TRAFFIC SIGNAL IMPROVEMENTSSan Patricio · Corpus Christi | 1 of 4 | $5,492,231 | $5,492,231 | Won |
| Feb 2, 2024 | 6459-31-001 | BASE REPAIR WITH SEAL COAT AND/OR OVERLAYNueces · Corpus Christi | 2 of 2 | $3,157,120 | $3,090,451CK NEWBERRY, LLC | +2.2% |
| Feb 1, 2024 | 1113-01-030 | REHABILITATE EXISTING ROADWAYDe Witt · Yoakum | 5 of 6 | $16,032,818 | $11,601,489CLARK CONSTRUCTION OF TEXAS… | +38.2% |
| Jan 4, 2024 | 6460-50-001 | ASPHALT PAVEMENT REPAIRKarnes · Corpus Christi | 1 of 5 | $1,188,210 | $1,188,210 | Won |
| Dec 5, 2023 | 0155-06-213 | WIDEN ROAD - ADD LANESRefugio · Corpus Christi | 2 of 4 | $13,445,431 | $13,060,414ANDERSON COLUMBIA CO., INC. | +2.9% |
| Oct 6, 2023 | 1843-01-023 | TRAFFIC SIGNAL IMPROVEMENTSGoliad · Corpus Christi | 5 of 5 | $3,545,524 | $2,869,911BRANNAN PAVING CO., LTD. | +23.5% |
| Sep 7, 2023 | 0074-04-047 | REHABILITATE EXISTING ROADWAYSan Patricio · Corpus Christi | 4 of 7 | $6,260,122 | $6,031,422BRANNAN PAVING CO., LTD. | +3.8% |
| Aug 3, 2023 | 0483-01-052 | REHABILITATE EXISTING ROADWAYLa Salle · Laredo | 3 of 3 | $7,913,568 | $7,207,235HUNTER INDUSTRIES, LTD. | +9.8% |
| Aug 3, 2023 | 1095-03-017 | TRAFFIC SIGNAL IMPROVEMENTSKarnes · Corpus Christi | 2 of 4 | $2,689,548 | $2,555,559CK NEWBERRY, LLC | +5.2% |
| Jun 28, 2023 | 0086-10-053 | REHABILITATE EXISTING ROADWAYDuval · Laredo | 2 of 5 | $4,225,208 | $4,204,392MAKO CONTRACTING, LLC | +0.5% |
| Feb 1, 2023 | 1553-02-008 | REHABILITATE EXISTING ROADWAYLive Oak · Corpus Christi | 4 of 5 | $9,030,940 | $7,861,814CK NEWBERRY, LLC | +14.9% |
| Mar 4, 2022 | 0018-02-086 | BASE, SEAL COAT, PAV MRKSLa Salle · Laredo | 2 of 5 | $11,472,445 | $11,045,138CK NEWBERRY, LLC | +3.9% |
| Jan 7, 2022 | 0018-01-094 | REHABILITATE EXISTING ROADWAYLa Salle · Laredo | 1 of 7 | $4,380,302 | $4,380,302 | Won |
| Dec 2, 2021 | 3075-01-011 | REHABILITATE EXISTING ROADWAYGoliad · Corpus Christi | 1 of 5 | $14,990,021 | $14,990,021 | Won |
| Nov 4, 2021 | 6390-97-001 | MILL AND INLAYSan Patricio · Corpus Christi | 4 of 5 | $1,403,187 | $1,139,243TEXAS MATERIALS GROUP, INC. | +23.2% |
| Aug 5, 2021 | 0017-08-111 | CONSTRUCT RAMPSLa Salle · Laredo | 4 of 4 | $2,500,718 | $1,809,941TEXAS MATERIALS GROUP, INC. | +38.2% |
| Aug 5, 2021 | 6383-53-001 | REHABILITATION OF EXISTING ROADWAYSan Patricio · Corpus Christi | 1 of 8 | $1,301,899 | $1,301,899 | Won |
| Aug 4, 2021 | 6379-42-001 | REHABILITATION OF EXISTING ROADWAYKarnes · Corpus Christi | 2 of 7 | $582,814 | $516,751CK NEWBERRY, LLC | +12.8% |
| Jul 2, 2021 | 1207-05-008 | WIDEN ROAD - ADD SHOULDERSLive Oak · Corpus Christi | 5 of 9 | $2,805,358 | $2,348,364SALINAS CONSTRUCTION TECHNO… | +19.5% |
| Jul 1, 2021 | 0691-01-040 | ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDEKarnes · Corpus Christi | 7 of 9 | $9,731,474 | $7,699,689CK NEWBERRY, LLC | +26.4% |
| Jun 4, 2021 | 2373-01-022 | WIDEN SHLDR, SEALCOAT, PROF MRK ON EDGE&CTR LINESLa Salle · Laredo | 3 of 10 | $5,908,881 | $5,569,436BRANNAN PAVING CO., LTD. | +6.1% |
| Jun 3, 2021 | 1557-01-043 | SURFACING/ROADWAY RESTORATIONNueces · Corpus Christi | 6 of 7 | $5,709,112 | $5,154,966HAAS-ANDERSON CONSTRUCTION,… | +10.7% |
| Mar 4, 2021 | 6369-58-001 | ON CALL PAVEMENT REPAIRSGonzales · Yoakum | 4 of 7 | $3,560,142 | $3,203,924HUNTER INDUSTRIES, LTD. | +11.1% |
| Feb 5, 2021 | 0180-02-041 | WIDEN ROAD - ADD LANESRefugio · Corpus Christi | 4 of 7 | $5,965,113 | $4,992,798HUNTER INDUSTRIES, LTD. | +19.5% |
| Feb 4, 2021 | 0516-02-029 | REHABILITATE EXISTING ROADWAYGoliad · Corpus Christi | 4 of 7 | $8,352,954 | $7,455,640HUNTER INDUSTRIES, LTD. | +12.0% |
| Dec 16, 2020 | 6366-21-001 | PAVING AND STRIPING OF PARKING LOTNueces · Corpus Christi | 5 of 5 | $363,649 | $238,830DOUBLE L CONTRACTING, LLC | +52.3% |
| Dec 3, 2020 | 0017-08-096 | GRAD,BASE,ASPH,DRAIN,STRUC,CONC PAVE,SIGN,& STRIPELa Salle · Laredo | 1 of 4 | $11,436,092 | $11,436,092 | Won |
| Nov 4, 2020 | 2150-04-076 | GRADE, INLETS, CONC. PAV., SIGNS, & PAV. MRKGS.Webb · Laredo | 2 of 4 | $6,636,199 | $6,359,706ANDERSON COLUMBIA CO., INC. | +4.3% |
| Nov 4, 2020 | 1123-02-016 | REHAB ROADWAY AND WIDENKarnes · Corpus Christi | 5 of 7 | $9,980,255 | $8,531,764HUNTER INDUSTRIES, LTD. | +17.0% |
| Aug 6, 2020 | 0359-02-005 | REHABILITATION AND WIDENING OF SHOULDERSGoliad · Corpus Christi | 4 of 5 | $11,549,137 | $9,793,593HUNTER INDUSTRIES, LTD. | +17.9% |
| Aug 6, 2020 | 0507-04-045 | SAFETY WIDENINGAransas · Corpus Christi | 2 of 8 | $1,288,983 | $1,267,487BRANNAN PAVING CO., LTD. | +1.7% |
| Aug 5, 2020 | 0359-04-005 | REHAB ROADWAY AND ADD 10' SHLDRS AND ADD PASSING LKarnes · Corpus Christi | 4 of 6 | $22,295,652 | $20,496,430ANDERSON COLUMBIA CO., INC. | +8.8% |
| Jul 9, 2020 | 0684-03-022 | REHABILITATE ROADWAYCameron · Pharr | 3 of 5 | $8,163,951 | $6,603,454FOREMOST PAVING, INC. | +23.6% |
| Jul 8, 2020 | 0100-08-095 | SURFACING/ROADWAY RESTORATIONBee · Corpus Christi | 6 of 7 | $19,203,677 | $14,739,738HUNTER INDUSTRIES, LTD. | +30.3% |
| Jun 5, 2020 | 0180-04-130 | DEMOLITION OF EXISTING TIMBER STRUCTUREAransas · Corpus Christi | 3 of 6 | $3,470,993 | $2,681,504RUSSELL MARINE, LLC | +29.4% |
| Jun 5, 2020 | 0237-03-035 | FIXED OBJECT REPLACEMENT (MBGF) WITH SETSWebb · Laredo | 6 of 7 | $1,498,538 | $831,198VECTOR UTILITIES LLC | +80.3% |
| Jun 4, 2020 | 0447-05-075 | HAZARD ELIMINATION & SAFETYRefugio · Corpus Christi | 3 of 8 | $2,895,931 | $2,846,447VECTOR UTILITIES LLC | +1.7% |
| May 8, 2020 | 1545-02-023 | GRADE, ACP, STR, MBGF, PAV MRKS, SIGNSLa Salle · Laredo | 3 of 5 | $16,298,484 | $15,239,643ANDERSON COLUMBIA CO., INC. | +6.9% |
| Apr 8, 2020 | 0573-04-017 | REHABILITATION OF EXISTING ROADWAYGonzales · Yoakum | 4 of 7 | $3,662,934 | $3,364,665HUNTER INDUSTRIES, LTD. | +8.9% |
| Mar 17, 2020 | 6352-36-001 | DITCH CLEANING & DRAINAGE IMPROVEMENTSSan Patricio · Corpus Christi | 3 of 5 | $379,229 | $262,989TIERRA LEASE SERVICE, LLC | +44.2% |
| Feb 7, 2020 | 2150-02-009 | BASE,GRADE,ACP,PAV MARKWebb · Laredo | 3 of 6 | $3,489,126 | $3,148,791ANDERSON COLUMBIA CO., INC. | +10.8% |
| Feb 7, 2020 | 6354-20-001 | SPOT BASE REPAIRZavala · Laredo | 4 of 4 | $2,293,227 | $1,349,226ANDERSON COLUMBIA CO., INC. | +70.0% |
| Jan 14, 2020 | 6353-89-001 | MILL & FILLNueces · Corpus Christi | 2 of 2 | $474,012 | $465,843HAAS-ANDERSON CONSTRUCTION,… | +1.8% |
| Jan 9, 2020 | 6350-58-001 | MILL & INLAYNueces · Corpus Christi | 3 of 3 | $3,586,410 | $2,995,402HAAS-ANDERSON CONSTRUCTION,… | +19.7% |
| Nov 6, 2019 | 0073-07-064 | REHAB AND OVERLAY WEST AND EAST FRONTAGE ROADSLive Oak · Corpus Christi | 3 of 6 | $7,604,548 | $6,699,673HUNTER INDUSTRIES, LTD. | +13.5% |
| Sep 6, 2019 | 1087-01-014 | PROVIDE ADDITIONAL PAVED SURFACE WIDTHJim Wells · Corpus Christi | 1 of 5 | $1,150,495 | $1,150,495 | Won |
| Aug 7, 2019 | 0100-12-009 | PROVIDE ADDITIONAL PAVED SURFACE WIDTHKarnes · Corpus Christi | 3 of 6 | $3,663,254 | $3,244,111TIERRA LEASE SERVICE, LLC | +12.9% |
| May 7, 2019 | 1558-01-019 | RESTORATION OF EXISTING ROADWAYNueces · Corpus Christi | 2 of 6 | $4,799,565 | $4,592,255TIERRA LEASE SERVICE, LLC | +4.5% |
| Apr 2, 2019 | 2886-02-017 | REHAB ROADWAY AND WIDENNueces · Corpus Christi | 1 of 5 | $4,689,384 | $4,689,384 | Won |
| Mar 6, 2019 | 0074-01-055 | REHAB AND WIDEN-WEST FRTG LANES ONLYLive Oak · Corpus Christi | 5 of 8 | $2,137,278 | $1,839,972HUNTER INDUSTRIES, LTD. | +16.2% |
| Jan 8, 2019 | 0691-01-042 | REHAB AND WIDEN ROADWAYKarnes · Corpus Christi | 4 of 8 | $9,051,351 | $7,894,058RAY FARIS, INC. | +14.7% |
| Nov 7, 2018 | 0037-01-042 | REHAB EXISTING ROADWAYUvalde · San Antonio | 5 of 5 | $12,307,257 | $10,197,041HUNTER INDUSTRIES, LTD. | +20.7% |
| Nov 7, 2018 | 0018-01-093 | REHABILITATION OF EXISTING HIGHWAYLa Salle · Laredo | 1 of 5 | $10,878,130 | $10,878,130 | Won |
| Nov 6, 2018 | 0941-02-020 | REHABILITATE EXISTING ROADWAYDe Witt · Yoakum | 3 of 8 | $4,483,724 | $4,185,511TIERRA LEASE SERVICE, LLC | +7.1% |
| Sep 6, 2018 | 0102-10-030 | MILL AND INLAYKleberg · Corpus Christi | 2 of 5 | $2,072,611 | $2,030,652TEXAS SAI, INC. | +2.1% |
| Aug 8, 2018 | 0101-03-088 | CONSTRUCT GRADE SEPARATIONSan Patricio · Corpus Christi | 2 of 4 | $15,918,736 | $15,437,893HAAS-ANDERSON CONSTRUCTION,… | +3.1% |
| Aug 8, 2018 | 0237-07-015 | BASE,ACP,GRAD,STR,PAV MRKDimmit · Laredo | 4 of 4 | $19,052,284 | $16,183,209ANGEL BROTHERS HOLDINGS COR… | +17.7% |
| Aug 7, 2018 | 0301-04-020 | BASE, ACP, GRAD, STR, PAV MRKDimmit · Laredo | 1 of 5 | $12,607,041 | $12,607,041 | Won |
| Jul 11, 2018 | 3026-01-026 | UPGRADE TO 5-LANE URBAN ROADWAYSan Patricio · Corpus Christi | 3 of 4 | $19,723,316 | $17,126,620BAY LTD. | +15.2% |
| Jul 11, 2018 | 0922-00-064 | BRIDGE RAIL,SET,MBGF,SGTWebb · Laredo | 2 of 3 | $2,515,061 | $2,482,190RELMCO, INC. | +1.3% |
| Jul 10, 2018 | 0691-01-035 | WIDEN OR REPLACE STRUCTUREKarnes · Corpus Christi | 8 of 10 | $5,448,710 | $4,236,891LISKA CONSTRUCTION COMPANY,… | +28.6% |
| Jun 6, 2018 | 0100-05-184 | RECONSTRUCT INTERSECTIONKarnes · Corpus Christi | 5 of 8 | $7,740,405 | $6,543,323RELMCO, INC. | +18.3% |
| Jun 6, 2018 | 1423-01-034 | SAFETY TRT FIXED OBJ, WIDEN LANES AND PAVED SHLDRefugio · Corpus Christi | 3 of 6 | $1,538,013 | $1,520,496BRANNAN PAVING CO., LTD. | +1.2% |
| Jun 5, 2018 | 0716-02-042 | ADD SHOULDERSColorado · Yoakum | 5 of 7 | $3,956,108 | $3,476,586GLENN FUQUA, INC. | +13.8% |
| Jun 5, 2018 | 0270-04-006 | REHAB ROADWAYKarnes · Corpus Christi | 5 of 6 | $1,956,701 | $1,573,310HUNTER INDUSTRIES, LTD. | +24.4% |
| Apr 4, 2018 | 0127-01-031 | REHABILITATE EXISTING ROADWAYEastland · Brownwood | 3 of 7 | $3,309,577 | $3,213,022RAY FARIS, INC. | +3.0% |
| Apr 4, 2018 | 6328-81-001 | MILL & OVERLAYKarnes · Corpus Christi | 8 of 10 | $3,708,503 | $3,057,188ANGEL BROTHERS HOLDINGS COR… | +21.3% |
| Apr 3, 2018 | 0267-05-018 | PAVEMENT REPAIR AND SURFACINGFayette · Yoakum | 5 of 7 | $8,352,535 | $7,416,527HUNTER INDUSTRIES, LTD. | +12.6% |
| Apr 3, 2018 | 0018-01-091 | BASE, ACP, GRAD, STR, PAV MRKLa Salle · Laredo | 2 of 4 | $12,472,644 | $11,655,295ANDERSON COLUMBIA CO., INC. | +7.0% |
| Apr 3, 2018 | 0127-02-043 | ADD PASSING LANESEastland · Brownwood | 2 of 5 | $4,979,224 | $4,526,013JAY MILLS CONTRACTING, INCO… | +10.0% |
| Mar 7, 2018 | 6324-89-001 | BLADE LEVEL UP/OVERLAY AND PAVEMENT EDGE REPAIRZavala · Laredo | 3 of 7 | $2,527,599 | $2,366,031RAY FARIS, INC. | +6.8% |
| Mar 6, 2018 | 0848-04-046 | REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERSMedina · San Antonio | 3 of 10 | $2,040,996 | $1,968,967DEAN WORD COMPANY, LTD. | +3.7% |
| Mar 6, 2018 | 0018-03-049 | BASE,ACP,GRADE,STR,SIGN,PAVMRKWebb · Laredo | 3 of 7 | $1,552,275 | $1,521,455REIM CONSTRUCTION, INC. | +2.0% |
| Feb 2, 2018 | 0850-04-027 | MILL, OVERLAY, PAV MARKS, RECON FM 3432 INTWilson · San Antonio | 6 of 9 | $2,877,551 | $2,096,268HUNTER INDUSTRIES, LTD. | +37.3% |
| Feb 2, 2018 | 0127-02-141 | ADD PASSING LANESEastland · Brownwood | 5 of 6 | $3,967,029 | $3,673,746RAY FARIS, INC. | +8.0% |
| Nov 3, 2017 | 6320-14-001 | ON CALL PAVEMENT REPAIRSGonzales · Yoakum | 2 of 9 | $2,962,893 | $2,619,289RAY FARIS, INC. | +13.1% |
| Nov 2, 2017 | 6320-65-001 | ON CALL SPOT REPAIRSGonzales · Yoakum | 7 of 7 | $1,647,187 | $792,950CORNERSTONE PAVING AND CONS… | +107.7% |
| Oct 4, 2017 | 0101-04-115 | CONSTRUCT/EXTEND TURN LANESSan Patricio · Corpus Christi | 2 of 7 | $937,616 | $933,486BAY LTD. | +0.4% |
| Oct 4, 2017 | 0255-07-141 | SEAL COAT (NB & SB FRONTAGE ROADS)Hidalgo · Pharr | 3 of 3 | $1,983,925 | $1,572,941CLARK CONSTRUCTION OF TEXAS… | +26.1% |
| Oct 3, 2017 | 0433-01-030 | REHABILITATE ROADWAY (SUPER 2)Hidalgo · Pharr | 5 of 7 | $13,947,543 | $12,133,439ASAGO, LLC | +15.0% |
| Sep 7, 2017 | 0018-03-056 | SEALCOAT & PAV MRKSWebb · Laredo | 5 of 5 | $1,670,621 | $1,393,637BRANNAN PAVING CO., LTD. | +19.9% |
| Aug 9, 2017 | 1959-01-014 | REHAB AND WIDENLive Oak · Corpus Christi | 2 of 7 | $6,075,275 | $6,025,846HUNTER INDUSTRIES, LTD. | +0.8% |
| Aug 9, 2017 | 0573-04-015 | SAFETY TREAT FIXED OBJECTSGonzales · Yoakum | 4 of 8 | $4,540,858 | $4,044,139HUNTER INDUSTRIES, LTD. | +12.3% |
| Aug 8, 2017 | 6319-23-001 | CONCRETE RIPRAP REPAIR & DITCH CLEANINGSan Patricio · Corpus Christi | 3 of 5 | $621,304 | $457,753BECK-REIT & SONS, LTD. | +35.7% |
| Jul 12, 2017 | 0237-07-013 | BASE,GRADE,ACP, PAV MARKDimmit · Laredo | 6 of 7 | $11,355,522 | $9,690,620ANDERSON COLUMBIA CO., INC. | +17.2% |
| Jul 11, 2017 | 1739-04-010 | CONSTRUCT BRIDGE & APPROACHESMcMullen · San Antonio | 6 of 9 | $5,451,230 | $4,956,163ANGEL BROTHERS HOLDINGS COR… | +10.0% |
| Jun 7, 2017 | 0916-35-164 | RESURFACING OF ROADWAY & PARKINGNueces · Corpus Christi | 2 of 2 | $2,982,578 | $2,331,963SALINAS CONSTRUCTION TECHNO… | +27.9% |
| Jun 7, 2017 | 0328-07-014 | REHAB & WIDEN RDWY TO PROVIDE PASSING LANESMcMullen · San Antonio | 6 of 9 | $5,208,755 | $4,336,032ANDERSON COLUMBIA CO., INC. | +20.1% |
| Jun 7, 2017 | 0348-11-015 | REHAB AND WIDENLive Oak · Corpus Christi | 4 of 8 | $3,086,148 | $2,680,559HUNTER INDUSTRIES, LTD. | +15.1% |
| Jun 6, 2017 | 0916-37-030 | REPLACE BRIDGE AND APPROACHESJim Wells · Corpus Christi | 6 of 7 | $462,550 | $348,041CRG | +32.9% |
| Apr 5, 2017 | 0342-04-032 | WIDEN TO 4 LANE UNDIVIDED C&GCameron · Pharr | 7 of 7 | $5,694,037 | $4,313,270FOREMOST PAVING, INC. | +32.0% |
| Apr 4, 2017 | 0018-01-076 | REHABILITATION OF EXISTING HIGHWAYLa Salle · Laredo | 4 of 7 | $2,101,431 | $1,622,860ANGEL BROTHERS HOLDINGS COR… | +29.5% |
| Apr 4, 2017 | 2697-01-034 | SAFETY TREAT FIXED OBJECTSMatagorda · Yoakum | 5 of 7 | $4,743,981 | $3,844,068REXCO CONSTRUCTION SERVICES… | +23.4% |
| Mar 8, 2017 | 1052-01-076 | WIDEN AND SEAL ROADWAYNueces · Corpus Christi | 1 of 6 | $8,117,216 | $8,117,216 | Won |
| Mar 7, 2017 | 0916-29-006 | REPLACE BRIDGE AND APPROACHESLive Oak · Corpus Christi | 10 of 12 | $1,087,683 | $649,191LISKA CONSTRUCTION COMPANY,… | +67.5% |
| Mar 7, 2017 | 6314-04-001 | MILL & OVERLAYSan Patricio · Corpus Christi | 2 of 5 | $2,530,738 | $2,243,158HUNTER INDUSTRIES, LTD. | +12.8% |
| Mar 7, 2017 | 6310-90-001 | BLADE LEVEL UP/OVERLAY AND PAVEMENT EDGE REPAIRDuval · Laredo | 2 of 5 | $1,888,956 | $1,707,324BICK'S CONSTRUCTION, INC. | +10.6% |
| Feb 3, 2017 | 0143-08-097 | WIDEN ROADWAYDe Witt · Yoakum | 4 of 4 | $3,812,200 | $3,015,735HUNTER INDUSTRIES, LTD. | +26.4% |
| Feb 3, 2017 | 0497-03-009 | RESTORE ROADWAYJackson · Yoakum | 3 of 7 | $2,312,983 | $2,063,461GLENN FUQUA, INC. | +12.1% |
| Feb 2, 2017 | 0963-01-032 | BRIDGE REPLACEMENTS,BASE,SURFACINGDimmit · Laredo | 2 of 7 | $5,236,887 | $4,902,990IOC COMPANY LLC | +6.8% |
| Jan 4, 2017 | 0270-03-074 | BASE REPAIR, SURFACE AND RESTRIPE ROADWAYKarnes · Corpus Christi | 8 of 8 | $7,742,442 | $5,186,387HUNTER INDUSTRIES, LTD. | +49.3% |
| Dec 1, 2016 | 0100-06-064 | SPOT BASE REPAIR AND SEAL COATKarnes · Corpus Christi | 5 of 5 | $3,185,540 | $2,735,641HUNTER INDUSTRIES, LTD. | +16.4% |
| Nov 3, 2016 | 0989-01-037 | PROVIDE ADDITIONAL PAVED SURFACE WIDTHJim Wells · Corpus Christi | 3 of 9 | $4,882,327 | $4,558,634BRANNAN PAVING CO., LTD. | +7.1% |
| Nov 6, 2013 | 0446-02-030 | REPLACE BRIDGE AND APPROACHESColorado · Yoakum | 5 of 5 | $4,447,457 | $3,488,667FUQUA CONSTRUCTION CO., INC. | +27.5% |
Active prime contracts 4
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 0074-03-049Let Jun 5, 2025 | San PatricioCorpus Christi · IH 37 | REHABILITATION OF EXISTING ROAD | $7,952,541 | 90% | |
| 0916-37-036Let Jun 5, 2024 | Jim WellsCorpus Christi · CR | BRIDGE REPLACEMENT | $1,411,095 | 97% | |
| 0922-33-198Let Jun 5, 2024 | WebbLaredo · CR | BRIDGE REPLACEMENT | $4,531,863 | 96% | |
| 0507-01-021Let Mar 5, 2024 | San PatricioCorpus Christi · SH 234 | HAZARD ELIMINATION & SAFETY | $6,016,569 | 97% |
Subcontracts on active jobs 2
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 0237-03-036Let Aug 8, 2025 | ANDERSON COLUMBIA CO., INC. | WebbLaredo | REHABILITATION OF EXISTING ROAD | 32.04% | $9,644,011 |
| 0102-04-097Let Mar 3, 2022 | ANDERSON COLUMBIA CO., INC. | KlebergCorpus Christi | CONVERT NON-FREEWAY TO FREEWAY | 0.13% | $242,071 |