| 1 | 100-6002 |
PREPARING ROW | 1 | STA |
$2,000.00 |
$16,500.00 |
$500.00 |
$5,000.00 |
$7,986.09 |
$11,785.57 |
| 2 | 104-6029 |
REMOVING CONC (CURB OR CURB & GUTTER) | 100 | LF |
$9.00 |
$15.00 |
$5.00 |
$20.00 |
$12.25 |
$29.46 |
| 3 | 104-6036 |
REMOVING CONC (SIDEWALK OR RAMP) | 80 | SY |
$22.00 |
$40.00 |
$5.00 |
$25.00 |
$28.13 |
$18.42 |
| 4 | 134-6011 |
BACKFILLING PAVEMENT EDGES | 22 | CY |
$100.00 |
$50.00 |
$35.00 |
$300.00 |
$218.91 |
$134.01 |
| 5 | 247-6041 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 590 | CY |
$75.00 |
$99.77 |
$96.00 |
$25.00 |
$87.58 |
$145.00 |
| 6 | 275-6001 |
CEMENT | 36.2 | TON |
$160.00 |
$189.00 |
$200.00 |
$300.00 |
$202.73 |
$195.13 |
| 7 | 275-6002 |
CEMENT TREAT (EXIST MATL) (6") | 4,060 | SY |
$5.00 |
$3.45 |
$4.00 |
$12.00 |
$2.62 |
$5.29 |
| 8 | 310-6009 |
PRIME COAT (MC-30) | 815 | GAL |
$11.00 |
$4.09 |
$4.00 |
$10.00 |
$4.80 |
$5.39 |
| 9 | 316-6001 |
ASPH (MULTI OPTION) | 1,778 | GAL |
$5.00 |
$2.52 |
$3.25 |
$6.00 |
$3.73 |
$3.43 |
| 10 | 316-6002 |
AGGR (MULTI OPTION) | 41 | CY |
$130.00 |
$93.61 |
$200.00 |
$250.00 |
$244.15 |
$715.71 |
| 11 | 340-6120 |
D-GR HMA(SQ) TY-D SAC-B PG70-22 | 352 | TON |
$150.00 |
$120.12 |
$175.00 |
$150.00 |
$128.49 |
$205.17 |
| 12 | 354-6041 |
PLANE ASPH CONC PAV (1.5") | 2,500 | SY |
$3.00 |
$3.76 |
$3.50 |
$8.00 |
$4.22 |
$5.72 |
| 13 | 500-6001 |
MOBILIZATION | 1 | LS |
$22,690.60 |
$15,000.00 |
$25,000.00 |
$20,000.00 |
$41,801.30 |
$31,234.27 |
| 14 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 1 | MO |
$1,000.00 |
$1,000.00 |
$1,000.00 |
$1,500.00 |
$653.61 |
$7,500.00 |
| 15 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 600 | LF |
$2.00 |
$2.50 |
$2.00 |
$3.50 |
$4.04 |
$6.00 |
| 16 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 600 | LF |
$1.00 |
$1.50 |
$1.00 |
$1.50 |
$1.29 |
$2.40 |
| 17 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 48 | LF |
$10.00 |
$10.00 |
$5.00 |
$12.00 |
$6.83 |
$42.00 |
| 18 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 48 | LF |
$2.00 |
$5.00 |
$1.00 |
$2.50 |
$4.08 |
$3.60 |
| 19 | 529-6001 |
CONC CURB (TY I) | 580 | LF |
$15.00 |
$29.70 |
$35.00 |
$25.00 |
$15.94 |
$42.00 |
| 20 | 530-6005 |
DRIVEWAYS (ACP) | 215 | SY |
$75.00 |
$22.97 |
$25.00 |
$36.00 |
$74.39 |
$38.40 |
| 21 | 531-6001 |
CONC SIDEWALKS (4") | 290 | SY |
$80.00 |
$56.25 |
$65.00 |
$70.00 |
$76.73 |
$14.40 |
| 22 | 531-6004 |
CURB RAMPS (TY 1) | 4 | EA |
$2,200.00 |
$1,500.00 |
$1,500.00 |
$1,500.00 |
$1,768.22 |
$2,160.00 |
| 23 | 644-6027 |
IN SM RD SN SUP&AM TYS80(1)SA(P) | 2 | EA |
$720.00 |
$871.25 |
$750.00 |
$800.00 |
$938.40 |
$780.00 |
| 24 | 666-6170 |
REFL PAV MRK TY II (W) 4" (SLD) | 2,150 | LF |
$0.2000 |
$0.6700 |
$0.7500 |
$1.00 |
$0.8800 |
$0.9000 |
| 25 | 666-6178 |
REFL PAV MRK TY II (W) 8" (SLD) | 1,100 | LF |
$0.4600 |
$1.18 |
$1.50 |
$1.20 |
$1.76 |
$1.80 |
| 26 | 666-6323 |
RE PM W/RET REQ TY II (W) 4" (SLD) | 2,150 | LF |
$0.7500 |
$1.28 |
$0.8500 |
$1.00 |
$0.9900 |
$1.02 |
| 27 | 668-6077 |
PREFAB PAV MRK TY C (W) (ARROW) | 2 | EA |
$214.49 |
$256.25 |
$250.00 |
$220.00 |
$333.40 |
$300.00 |
| 28 | 668-6113 |
PRE PM TY C(ACC PRK)(BL&WH)(W/BORDR)LG | 4 | EA |
$350.00 |
$410.00 |
$300.00 |
$200.00 |
$359.20 |
$360.00 |
| 29 | 752-6007 |
TREE REMOVAL (18" - 24" DIA) | 1 | EA |
$200.00 |
$500.00 |
$1,500.00 |
$1,000.00 |
$2,429.53 |
$2,946.40 |