| 1 | 100-6002 |
PREPARING ROW | 531.84 | STA |
$950.00 |
$250.00 |
$100.00 |
$112.00 |
$369.63 |
$125.00 |
| 2 | 105-6020 |
REMOVING STAB BASE & ASPH PAV (12") | 217,404 | SY |
$4.00 |
$5.20 |
$4.00 |
$3.71 |
$1.67 |
$4.75 |
| 3 | 110-6001 |
EXCAVATION (ROADWAY) | 11,643 | CY |
$8.00 |
$10.00 |
$8.75 |
$8.44 |
$11.13 |
$15.00 |
| 4 | 132-6007 |
EMBANKMENT (FINAL)(ORD COMP)(TY D) | 15,964 | CY |
$10.00 |
$8.00 |
$6.50 |
$4.37 |
$11.13 |
$7.50 |
| 5 | 164-6036 |
DRILL SEEDING (PERM) (RURAL) (CLAY) | 106.8 | AC |
$600.00 |
$555.00 |
$350.00 |
$621.60 |
$624.75 |
$1,000.00 |
| 6 | 247-6041 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 59,030 | CY |
$60.00 |
$55.00 |
$55.75 |
$47.82 |
$72.88 |
$63.00 |
| 7 | 275-6001 |
CEMENT | 1,522 | TON |
$160.00 |
$160.00 |
$163.00 |
$160.16 |
$149.10 |
$150.00 |
| 8 | 275-6002 |
CEMENT TREAT (EXIST MATL) (6") | 229,177 | SY |
$1.80 |
$2.20 |
$0.7500 |
$0.9600 |
$1.14 |
$1.35 |
| 9 | 310-6009 |
PRIME COAT (MC-30) | 62,270 | GAL |
$4.50 |
$4.50 |
$3.50 |
$3.47 |
$4.36 |
$3.95 |
| 10 | 354-6003 |
PLAN & TEXT ASPH CONC PAV(0" TO 3") | 783 | SY |
$2.00 |
$10.00 |
$4.50 |
$10.77 |
$8.40 |
$7.50 |
| 11 | 401-6001 |
FLOWABLE BACKFILL | 204 | CY |
$150.00 |
$200.00 |
$160.00 |
$224.00 |
$162.56 |
$195.00 |
| 12 | 420-6009 |
CL A CONC (COLLAR) | 1 | EA |
$1,000.00 |
$2,000.00 |
$975.00 |
$2,168.32 |
$1,176.24 |
$1,050.00 |
| 13 | 432-6002 |
RIPRAP (CONC)(5 IN) | 18 | CY |
$440.00 |
$500.00 |
$600.00 |
$548.86 |
$839.99 |
$600.00 |
| 14 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 82 | CY |
$430.00 |
$525.00 |
$615.00 |
$500.64 |
$651.15 |
$575.00 |
| 15 | 438-6001 |
CLEANING AND SEALING EXISTING JOINTS | 369 | LF |
$25.00 |
$34.00 |
$40.00 |
$42.56 |
$36.34 |
$37.00 |
| 16 | 451-6024 |
RETROFIT RAIL (TY SSTR) | 482 | LF |
$150.00 |
$190.00 |
$145.00 |
$207.79 |
$126.34 |
$150.00 |
| 17 | 462-6010 |
CONC BOX CULV (6 FT X 3 FT) | 138 | LF |
$550.00 |
$415.00 |
$425.00 |
$464.17 |
$480.55 |
$525.00 |
| 18 | 462-6011 |
CONC BOX CULV (6 FT X 4 FT) | 47 | LF |
$640.00 |
$447.00 |
$575.00 |
$501.76 |
$511.12 |
$525.00 |
| 19 | 464-6005 |
RC PIPE (CL III)(24 IN) | 156 | LF |
$70.00 |
$74.00 |
$82.00 |
$81.92 |
$107.07 |
$150.00 |
| 20 | 464-6008 |
RC PIPE (CL III)(36 IN) | 12 | LF |
$110.00 |
$120.00 |
$95.00 |
$134.40 |
$137.73 |
$265.00 |
| 21 | 464-6018 |
RC PIPE (CL IV)(24 IN) | 360 | LF |
$90.00 |
$200.00 |
$75.00 |
$222.88 |
$115.69 |
$90.00 |
| 22 | 464-6080 |
RC PIPE (ARCH)(CL V)(DES 3) | 57 | LF |
$300.00 |
$264.00 |
$150.00 |
$295.68 |
$228.76 |
$185.00 |
| 23 | 466-6101 |
HEADWALL (CH - PW - 0) (DIA= 36 IN) | 1 | EA |
$8,000.00 |
$6,500.00 |
$12,000.00 |
$7,280.00 |
$11,310.43 |
$9,000.00 |
| 24 | 467-6219 |
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C) | 2 | EA |
$12,000.00 |
$8,800.00 |
$15,000.00 |
$9,856.00 |
$9,556.44 |
$10,500.00 |
| 25 | 467-6224 |
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C) | 6 | EA |
$12,000.00 |
$13,500.00 |
$6,000.00 |
$14,616.00 |
$9,594.26 |
$9,000.00 |
| 26 | 467-6390 |
SET (TY II) (24 IN) (RCP) (4: 1) (C) | 10 | EA |
$2,000.00 |
$1,200.00 |
$1,975.00 |
$1,344.00 |
$2,235.04 |
$1,350.00 |
| 27 | 467-6395 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 14 | EA |
$1,400.00 |
$1,200.00 |
$1,975.00 |
$1,344.00 |
$2,435.84 |
$1,350.00 |
| 28 | 467-6419 |
SET (TY II) (30 IN) (RCP) (4: 1) (C) | 10 | EA |
$2,000.00 |
$2,100.00 |
$2,175.00 |
$2,296.00 |
$2,928.74 |
$2,400.00 |
| 29 | 467-6450 |
SET (TY II) (36 IN) (RCP) (4: 1) (C) | 3 | EA |
$6,000.00 |
$3,000.00 |
$2,175.00 |
$3,304.00 |
$5,114.94 |
$3,200.00 |
| 30 | 467-6545 |
SET (TY II) (DES 3) (RCP) (6: 1) (P) | 4 | EA |
$2,400.00 |
$4,750.00 |
$2,500.00 |
$5,320.00 |
$4,730.80 |
$4,000.00 |
| 31 | 480-6001 |
CLEAN EXIST CULVERTS | 30 | EA |
$1,600.00 |
$2,100.00 |
$375.00 |
$2,296.00 |
$1,841.01 |
$2,100.00 |
| 32 | 496-6004 |
REMOV STR (SET) | 32 | EA |
$800.00 |
$585.00 |
$120.00 |
$655.20 |
$874.98 |
$375.00 |
| 33 | 496-6008 |
REMOV STR (BOX CULVERT) | 185 | LF |
$50.00 |
$33.00 |
$40.00 |
$36.96 |
$112.42 |
$85.00 |
| 34 | 500-6001 |
MOBILIZATION | 1 | LS |
$1,025,866.28 |
$956,000.00 |
$750,000.00 |
$877,980.32 |
$1,556,000.00 |
$1,200,000.00 |
| 35 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 25 | MO |
$6,000.00 |
$1,200.00 |
$1,600.00 |
$2,800.00 |
$6,000.00 |
$3,000.00 |
| 36 | 506-6003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 330 | LF |
$48.00 |
$44.00 |
$21.00 |
$49.00 |
$60.90 |
$90.00 |
| 37 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 330 | LF |
$9.50 |
$30.00 |
$10.50 |
$33.60 |
$10.50 |
$15.00 |
| 38 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 156 | SY |
$21.00 |
$39.00 |
$10.50 |
$43.40 |
$15.75 |
$20.00 |
| 39 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 156 | SY |
$8.00 |
$27.00 |
$5.25 |
$28.00 |
$2.10 |
$5.00 |
| 40 | 506-6030 |
BACKHOE WORK (EROSION & SEDMT CONT) | 163 | HR |
$68.00 |
$60.00 |
$63.00 |
$50.40 |
$79.80 |
$100.00 |
| 41 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 6,461 | LF |
$2.25 |
$2.70 |
$2.00 |
$3.02 |
$1.88 |
$2.85 |
| 42 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 6,461 | LF |
$0.7500 |
$1.50 |
$1.00 |
$1.68 |
$0.8900 |
$0.2500 |
| 43 | 510-6002 |
ONE-WAY TRAF CONT (PILOT CAR) | 80 | HR |
$80.00 |
$200.00 |
$115.00 |
$120.91 |
$102.60 |
$100.00 |
| 44 | 510-6003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 26 | MO |
$5,600.00 |
$6,000.00 |
$2,850.00 |
$3,920.00 |
$4,894.29 |
$3,800.00 |
| 45 | 512-6072 |
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL) | 5,130 | LF |
$40.00 |
$25.00 |
$42.00 |
$48.65 |
$36.31 |
$32.00 |
| 46 | 512-6074 |
PTB (MOVE)(SGL SLP)(TY 1) OR (STL) | 112,860 | LF |
$6.00 |
$4.00 |
$1.75 |
$8.30 |
$4.36 |
$7.00 |
| 47 | 512-6076 |
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL) | 5,130 | LF |
$5.50 |
$12.00 |
$4.00 |
$23.79 |
$11.81 |
$10.00 |
| 48 | 530-6004 |
DRIVEWAYS (CONC) | 1,283 | SY |
$100.00 |
$88.00 |
$92.00 |
$98.56 |
$120.11 |
$95.00 |
| 49 | 530-6005 |
DRIVEWAYS (ACP) | 5,923 | SY |
$35.00 |
$50.00 |
$20.00 |
$26.60 |
$32.85 |
$37.00 |
| 50 | 533-6003 |
RUMBLE STRIPS (SHOULDER) ASPHALT | 106,383 | LF |
$0.2000 |
$0.3000 |
$0.1500 |
$0.1400 |
$0.1300 |
$0.2500 |
| 51 | 533-6004 |
RUMBLE STRIPS (CENTERLINE) ASPHALT | 53,184 | LF |
$0.2000 |
$0.3000 |
$0.2000 |
$0.3100 |
$0.1500 |
$0.5000 |
| 52 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 1,200 | LF |
$20.00 |
$21.00 |
$23.00 |
$24.64 |
$21.29 |
$32.00 |
| 53 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 8 | EA |
$1,500.00 |
$2,000.00 |
$1,500.00 |
$1,607.20 |
$1,428.00 |
$2,500.00 |
| 54 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 1,200 | LF |
$2.25 |
$1.80 |
$1.00 |
$1.68 |
$1.84 |
$5.00 |
| 55 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 8 | EA |
$2,500.00 |
$2,750.00 |
$2,875.00 |
$3,065.44 |
$2,751.00 |
$3,200.00 |
| 56 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 8 | EA |
$250.00 |
$100.00 |
$275.00 |
$414.40 |
$99.75 |
$250.00 |
| 57 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 98 | EA |
$900.00 |
$760.00 |
$475.00 |
$1,694.05 |
$761.25 |
$800.00 |
| 58 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 14 | EA |
$850.00 |
$370.00 |
$275.00 |
$2,305.23 |
$367.50 |
$800.00 |
| 59 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 14 | EA |
$8,500.00 |
$7,190.00 |
$7,600.00 |
$3,948.13 |
$7,192.50 |
$7,000.00 |
| 60 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 32 | EA |
$650.00 |
$540.00 |
$475.00 |
$498.40 |
$467.25 |
$515.00 |
| 61 | 644-6027 |
IN SM RD SN SUP&AM TYS80(1)SA(P) | 4 | EA |
$625.00 |
$680.00 |
$700.00 |
$756.00 |
$708.75 |
$650.00 |
| 62 | 658-6049 |
INSTL OM ASSM (OM-2Z)(FLX)GND(BI) | 74 | EA |
$85.00 |
$80.00 |
$100.00 |
$106.40 |
$99.75 |
$77.00 |
| 63 | 658-6060 |
REMOVE DELIN & OBJECT MARKER ASSMS | 52 | EA |
$25.00 |
$11.00 |
$16.00 |
$16.80 |
$15.75 |
$10.00 |
| 64 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 24 | EA |
$30.00 |
$26.00 |
$29.00 |
$31.36 |
$29.40 |
$25.00 |
| 65 | 662-6050 |
WK ZN PAV MRK REMOV (REFL) TY II-A-A | 2,880 | EA |
$3.00 |
$2.60 |
$6.25 |
$6.72 |
$6.30 |
$2.50 |
| 66 | 662-6063 |
WK ZN PAV MRK REMOV (W)4"(SLD) | 16,800 | LF |
$0.7000 |
$0.5000 |
$0.8500 |
$0.9000 |
$0.8400 |
$0.5000 |
| 67 | 662-6075 |
WK ZN PAV MRK REMOV (W)24"(SLD) | 576 | LF |
$8.75 |
$5.25 |
$14.70 |
$15.68 |
$14.70 |
$5.00 |
| 68 | 662-6095 |
WK ZN PAV MRK REMOV (Y)4"(SLD) | 141,360 | LF |
$0.7000 |
$0.5000 |
$0.8000 |
$0.8400 |
$0.7900 |
$0.4800 |
| 69 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 10,700 | EA |
$0.8000 |
$1.40 |
$0.5000 |
$1.12 |
$1.78 |
$0.8000 |
| 70 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 30 | LF |
$6.20 |
$8.00 |
$21.00 |
$22.40 |
$21.00 |
$8.00 |
| 71 | 666-6224 |
PAVEMENT SEALER 4" | 156,266 | LF |
$0.1500 |
$0.1200 |
$0.1700 |
$0.1800 |
$0.1700 |
$0.1100 |
| 72 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 106,383 | LF |
$0.3000 |
$0.3000 |
$0.3000 |
$0.3200 |
$0.3000 |
$0.3200 |
| 73 | 666-6312 |
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | 10,815 | LF |
$0.3000 |
$0.4000 |
$0.3500 |
$0.3400 |
$0.3200 |
$0.3400 |
| 74 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 39,068 | LF |
$0.3000 |
$0.4000 |
$0.3000 |
$0.3400 |
$0.3200 |
$0.3400 |
| 75 | 672-6009 |
REFL PAV MRKR TY II-A-A | 802 | EA |
$3.00 |
$3.50 |
$4.00 |
$4.20 |
$3.94 |
$3.33 |
| 76 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 14,000 | LF |
$0.4000 |
$0.4000 |
$0.8000 |
$0.8400 |
$0.7900 |
$0.3700 |
| 77 | 3076-6007 |
D-GR HMA TY-B SAC-B PG70-22 | 60,065 | TON |
$73.00 |
$66.00 |
$89.25 |
$84.55 |
$75.90 |
$82.75 |
| 78 | 3077-6033 |
SP MIXES SP-C SAC-A PG76-22 | 21,845 | TON |
$94.00 |
$80.00 |
$102.50 |
$107.00 |
$92.70 |
$94.00 |
| 79 | 3084-6001 |
BONDING COURSE | 19,094 | GAL |
$3.00 |
$3.60 |
$3.00 |
$3.36 |
$2.98 |
$2.70 |
| 80 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 4 | EA |
$10,500.00 |
$37,370.00 |
$14,000.00 |
$12,320.00 |
$8,063.29 |
$11,000.00 |
| 81 | 6185-6002 |
TMA (STATIONARY) | 120 | DAY |
$250.00 |
$170.00 |
$300.00 |
$336.00 |
$215.02 |
$265.00 |
| 82 | 6185-6003 |
TMA (MOBILE OPERATION) | 300 | HR |
$45.00 |
$22.00 |
$26.00 |
$72.80 |
$107.51 |
$53.00 |