$740.92Avg low bid / AC
$807.18Avg of all bids
$715.29Avg engineer's estimate
122Jobs · 3,607.486 AC
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2024 | 10 | 272.58 | $819.68 | $960.01 |
| 2023 | 10 | 597.13 | $993.28 | $1,077.66 |
| 2022 | 13 | 355.25 | $743.38 | $710.16 |
| 2021 | 21 | 308.21 | $670.62 | $709.57 |
| 2020 | 11 | 263.01 | $643.50 | $671.14 |
| 2019 | 19 | 544.3 | $654.23 | $650.02 |
| 2018 | 21 | 919.98 | $624.42 | $790.20 |
| 2017 | 15 | 340.336 | $826.57 | $856.85 |
| 2016 | 2 | 6.69 | $659.51 | $1,220.84 |
| Let date | CCSJ | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Jun 6, 2024 | 0371-03-137 | RefugioCorpus Christi | 10 AC | $1,940.00 | SCR CIVIL CONSTRUCTION, LLC |
| Jun 5, 2024 | 2614-01-024 | RandallAmarillo | 24 AC | $615.00 | J. LEE MILLIGAN, INC. |
| Jun 5, 2024 | 0090-02-055 | OldhamAmarillo | 32 AC | $620.04 | KIEWIT INFRASTRUCTURE SOUTH CO. |
| Jun 5, 2024 | 0375-03-017 | MaverickLaredo | 11.2 AC | $1,960.26 | J. CARROLL WEAVER, INC. |
| Jun 5, 2024 | 0922-33-198 | WebbLaredo | 5.71 AC | $2,220.00 | J. CARROLL WEAVER, INC. |
| May 3, 2024 | 0271-01-083 | ColoradoYoakum | 101.4 AC | $850.00 | PULICE CONSTRUCTION, INC. |
| May 3, 2024 | 1360-01-031 | JonesAbilene | 46 AC | $750.00 | J. H. STRAIN & SONS, INC. |
| May 3, 2024 | 0066-04-083 | MooreAmarillo | 5 AC | $1,173.00 | L A FULLER & SONS CONSTRUCTION, LTD. |
| May 2, 2024 | 0455-03-038 | GrayAmarillo | 13.27 AC | $621.00 | RK HALL, LLC |
| Jan 4, 2024 | 0070-02-099 | Tom GreenSan Angelo | 24 AC | $0.0100 | SCOUT 5 CONSTRUCTION LLC |
| Sep 7, 2023 | 0650-03-036 | RunnelsSan Angelo | 182 AC | $1,098.90 | RK HALL, LLC |
| Sep 7, 2023 | 0168-08-075 | RandallAmarillo | 36 AC | $592.00 | DUININCK, INC. |
| Aug 3, 2023 | 1057-03-045 | CameronPharr | 34.11 AC | $1,400.00 | FOREMOST PAVING, INC. |
| Aug 3, 2023 | 0972-03-021 | JonesAbilene | 18.06 AC | $1,000.00 | GILVIN-TERRILL, LTD. |
| Aug 3, 2023 | 0275-04-069 | CarsonAmarillo | 6.7 AC | $610.00 | J. LEE MILLIGAN, INC. |
| Jun 28, 2023 | 0271-01-066 | ColoradoYoakum | 118 AC | $934.00 | WEBBER, LLC |
| Jun 27, 2023 | 1428-01-027 | HidalgoPharr | 42.93 AC | $1,750.00 | ASAGO, LLC |
| Feb 2, 2023 | 0141-04-039 | SuttonSan Angelo | 57.5 AC | $800.00 | MASSANA CONSTRUCTION INC. |
| Feb 1, 2023 | 1553-02-008 | Live OakCorpus Christi | 34.83 AC | $900.00 | CK NEWBERRY, LLC |
| Jan 6, 2023 | 0168-07-050 | Deaf SmithAmarillo | 67 AC | $585.36 | RK HALL, LLC |
| Nov 3, 2022 | 0169-02-068 | PotterAmarillo | 8 AC | $915.00 | L A FULLER & SONS CONSTRUCTION, LTD. |
| Nov 2, 2022 | 0030-07-022 | HemphillAmarillo | 8.36 AC | $680.00 | DUININCK, INC. |
| Aug 4, 2022 | 0006-02-114 | NolanAbilene | 150.6 AC | $575.00 | SUNDT CONSTRUCTION, INC. |
| Aug 4, 2022 | 0922-33-159 | WebbLaredo | 2.2 AC | $2,612.50 | RELMCO, INC. |
| Aug 4, 2022 | 0140-13-025 | CrockettSan Angelo | 16 AC | $3,500.00 | SCR CIVIL CONSTRUCTION, LLC |
| Aug 3, 2022 | 0989-02-054 | NuecesCorpus Christi | 21.5 AC | $1,410.00 | HAAS-ANDERSON CONSTRUCTION, LTD. |
| Jun 30, 2022 | 0308-01-013 | HansfordAmarillo | 1.04 AC | $2,535.00 | J. LEE MILLIGAN, INC. |
| Feb 4, 2022 | 1245-02-049 | PotterAmarillo | 28.93 AC | $500.68 | KIEWIT INFRASTRUCTURE SOUTH CO. |
| Feb 3, 2022 | 1245-01-019 | OldhamAmarillo | 47.29 AC | $487.23 | KIEWIT INFRASTRUCTURE SOUTH CO. |
| Jan 7, 2022 | 0379-01-046 | HutchinsonAmarillo | 30.04 AC | $430.28 | DUININCK, INC. |
| Jan 7, 2022 | 0099-01-035 | ColemanBrownwood | 10.5 AC | $500.00 | J. H. STRAIN & SONS, INC. |
| Jan 6, 2022 | 0238-04-038 | DallamAmarillo | 29.79 AC | $420.00 | RK HALL, LLC |
| Jan 6, 2022 | 0030-01-035 | Ochiltree | 1 AC | $1,572.43 | DUININCK, INC. |
| Dec 1, 2021 | 0226-02-038 | OldhamAmarillo | 13.18 AC | $550.00 | J. LEE MILLIGAN, INC. |
| Nov 4, 2021 | 0300-01-105 | MaverickLaredo | 16.9 AC | $1,500.00 | ANDERSON COLUMBIA CO., INC. |
| Nov 3, 2021 | 0226-05-067 | Deaf SmithAmarillo | 1.46 AC | $1,823.20 | RK HALL, LLC |
| Oct 8, 2021 | 0168-05-041 | Deaf SmithAmarillo | 0.18 AC | $10,500.00 | RK HALL, LLC |
| Oct 7, 2021 | 1337-02-012 | LipscombAmarillo | 26.55 AC | $545.00 | J. LEE MILLIGAN, INC. |
| Sep 1, 2021 | 0052-02-036 | BaileyLubbock | 67.25 AC | $460.00 | DUININCK, INC. |
| Aug 5, 2021 | 0017-08-111 | La SalleLaredo | 5.4 AC | $865.00 | TEXAS MATERIALS GROUP, INC. |
| Aug 5, 2021 | 0168-07-047 | Deaf SmithAmarillo | 6.64 AC | $610.00 | J. LEE MILLIGAN, INC. |
| Aug 4, 2021 | 0169-07-053 | GrayAmarillo | 26.34 AC | $530.00 | RK HALL, LLC |
| Aug 4, 2021 | 1480-02-036 | RandallAmarillo | 11 AC | $590.00 | J. LEE MILLIGAN, INC. |
| Aug 4, 2021 | 0038-01-095 | WebbLaredo | 0.3 AC | $6,200.00 | ANDERSON COLUMBIA CO., INC. |
| Jul 2, 2021 | 0066-04-079 | MooreAmarillo | 6.43 AC | $983.58 | VECTOR UTILITIES LLC |
| Jul 2, 2021 | 1207-05-008 | Live OakCorpus Christi | 5.6 AC | $931.35 | SALINAS CONSTRUCTION TECHNOLOGIES, LTD. |
| Jul 1, 2021 | 0168-07-049 | Deaf SmithAmarillo | 6 AC | $550.00 | GILVIN-TERRILL, LTD. |
| Jun 4, 2021 | 2373-01-022 | La SalleLaredo | 52.1 AC | $600.00 | BRANNAN PAVING CO., LTD. |
| Jun 4, 2021 | 2494-01-015 | PotterAmarillo | 8.36 AC | $540.00 | J. LEE MILLIGAN, INC. |
| Jun 3, 2021 | 1557-01-043 | NuecesCorpus Christi | 3.89 AC | $2,110.00 | HAAS-ANDERSON CONSTRUCTION, LTD. |
| Jun 3, 2021 | 0086-02-030 | WebbLaredo | 12.5 AC | $1,100.00 | ANDERSON COLUMBIA CO., INC. |
| Apr 8, 2021 | 0041-02-016 | HartleyAmarillo | 19.68 AC | $490.00 | J. LEE MILLIGAN, INC. |
| Feb 5, 2021 | 0168-08-073 | RandallAmarillo | 9 AC | $685.00 | J. LEE MILLIGAN, INC. |
| Jan 8, 2021 | 0052-01-044 | ParmerLubbock | 9.45 AC | $500.00 | GILVIN-TERRILL, LTD. |
| Dec 2, 2020 | 0494-08-015 | GlasscockSan Angelo | 40.6 AC | $892.50 | RK HALL, LLC |
| Dec 2, 2020 | 0102-03-087 | NuecesCorpus Christi | 7.9 AC | $547.00 | HAAS-ANDERSON CONSTRUCTION, LTD. |
| Nov 4, 2020 | 0397-01-045 | GrayAmarillo | 25.9 AC | $466.40 | RK HALL, LLC |
| Oct 2, 2020 | 0168-09-165 | RandallAmarillo | 1.73 AC | $1,400.00 | J. LEE MILLIGAN, INC. |
| Aug 6, 2020 | 0379-02-032 | PotterAmarillo | 25.87 AC | $494.99 | KIEWIT INFRASTRUCTURE SOUTH CO. |
| Jun 5, 2020 | 0753-02-022 | CarsonAmarillo | 8.08 AC | $1,180.00 | L A FULLER & SONS CONSTRUCTION, LTD. |
| May 8, 2020 | 1545-02-023 | La SalleLaredo | 106.8 AC | $555.00 | ANDERSON COLUMBIA CO., INC. |
| May 8, 2020 | 6351-58-001 | McLennanWaco | 5 AC | $200.00 | CROSS PLUS CONSTRUCTION, LLC |
| Mar 5, 2020 | 0471-02-070 | HaysAustin | 22.39 AC | $711.48 | HUNTER INDUSTRIES, LTD. |
| Mar 4, 2020 | 0356-02-048 | CarsonAmarillo | 1.8 AC | $1,162.00 | L A FULLER & SONS CONSTRUCTION, LTD. |
| Feb 7, 2020 | 2150-02-009 | WebbLaredo | 16.94 AC | $800.00 | ANDERSON COLUMBIA CO., INC. |
| Dec 3, 2019 | 0275-11-083 | GrayAmarillo | 1.41 AC | $800.00 | GILVIN-TERRILL, LTD. |
| Nov 6, 2019 | 0073-07-064 | Live OakCorpus Christi | 0.97 AC | $3,170.00 | HUNTER INDUSTRIES, LTD. |
| Nov 5, 2019 | 0066-01-021 | DallamAmarillo | 9.7 AC | $483.00 | RK HALL, LLC |
| Nov 5, 2019 | 0249-01-047 | WichitaWichita Falls | 3.9 AC | $685.00 | A. L. HELMCAMP, INC. |
| Oct 3, 2019 | 0471-04-030 | CaldwellAustin | 14.29 AC | $800.00 | ANGEL BROTHERS HOLDINGS CORP. |
| Aug 7, 2019 | 0685-01-032 | WichitaWichita Falls | 2.2 AC | $950.00 | A. L. HELMCAMP, INC. |
| Aug 6, 2019 | 0037-10-037 | WebbLaredo | 153 AC | $550.00 | ANDERSON COLUMBIA CO., INC. |
| Aug 6, 2019 | 0238-03-064 | DallamAmarillo | 0.44 AC | $4,212.00 | RK HALL, LLC |
| Aug 6, 2019 | 1615-02-016 | ClayWichita Falls | 12.9 AC | $560.00 | A. L. HELMCAMP, INC. |
| Jun 5, 2019 | 0158-01-083 | RunnelsSan Angelo | 71 AC | $662.35 | GRATIOT CONSTRUCTION, LTD. |
| Jun 5, 2019 | 1615-02-016 | ClayWichita Falls | 12.9 AC | $435.00 | A. L. HELMCAMP, INC. |
| Jun 4, 2019 | 1744-02-013 | JacksonYoakum | 26.2 AC | $3,090.00 | REXCO CONSTRUCTION SERVICES, INC. |
| May 7, 2019 | 1558-01-019 | NuecesCorpus Christi | 16.11 AC | $700.00 | TIERRA LEASE SERVICE, LLC |
| Apr 2, 2019 | 0490-04-045 | Roberts | 1.56 AC | $1,015.00 | J. LEE MILLIGAN, INC. |
| Mar 6, 2019 | 0168-01-030 | ParmerLubbock | 49.4 AC | $500.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Mar 5, 2019 | 0558-06-016 | GlasscockSan Angelo | 60 AC | $412.50 | RK HALL, LLC |
| Feb 5, 2019 | 0066-03-041 | ShermanAmarillo | 3.82 AC | $715.50 | RK HALL, LLC |
| Jan 9, 2019 | 0134-03-032 | YoungWichita Falls | 10.5 AC | $550.54 | JAGOE-PUBLIC COMPANY |
| Jan 8, 2019 | 0238-02-038 | HartleyAmarillo | 94 AC | $355.00 | J. LEE MILLIGAN, INC. |
| Dec 6, 2018 | 2635-02-035 | RandallAmarillo | 2.29 AC | $930.00 | J. LEE MILLIGAN, INC. |
| Nov 7, 2018 | 0114-05-037 | BastropAustin | 164 AC | $825.00 | ANGEL BROTHERS HOLDINGS CORP. |
| Oct 3, 2018 | 0037-09-033 | WebbLaredo | 144.9 AC | $625.00 | ANDERSON COLUMBIA CO., INC. |
| Oct 3, 2018 | 0169-03-036 | CarsonAmarillo | 33.8 AC | $406.85 | RK HALL, LLC |
| Oct 2, 2018 | 0275-05-044 | GrayAmarillo | 22.95 AC | $438.06 | KIEWIT INFRASTRUCTURE SOUTH CO. |
| Sep 7, 2018 | 0275-03-066 | CarsonAmarillo | 27.9 AC | $600.00 | GILVIN-TERRILL, LTD. |
| Aug 8, 2018 | 3621-01-014 | Val VerdeLaredo | 57 AC | $708.75 | HUNTER INDUSTRIES, LTD. |
| Aug 8, 2018 | 0237-07-015 | DimmitLaredo | 118.5 AC | $530.00 | ANGEL BROTHERS HOLDINGS CORP. |
| Aug 8, 2018 | 0264-04-052 | CokeSan Angelo | 104 AC | $512.73 | REECE ALBERT, INC. |
| Aug 8, 2018 | 0681-04-041 | WichitaWichita Falls | 22.6 AC | $550.00 | A. L. HELMCAMP, INC. |
| Aug 7, 2018 | 0140-11-045 | CrockettSan Angelo | 5.21 AC | $1,250.00 | ALLEN KELLER COMPANY |
| Jul 11, 2018 | 3026-01-026 | San PatricioCorpus Christi | 2.74 AC | $2,000.00 | BAY LTD. |
| Jun 6, 2018 | 0169-08-024 | Roberts | 56.45 AC | $450.00 | J. LEE MILLIGAN, INC. |
| Jun 6, 2018 | 0141-09-070 | KimbleSan Angelo | 60 AC | $650.00 | LONE STAR PAVING COMPANY |
| May 1, 2018 | 0168-01-029 | ParmerLubbock | 38.43 AC | $380.00 | J. LEE MILLIGAN, INC. |
| May 1, 2018 | 0156-06-052 | BaylorWichita Falls | 16.9 AC | $500.00 | A. L. HELMCAMP, INC. |
| Mar 6, 2018 | 0077-01-029 | ReaganSan Angelo | 4.02 AC | $787.50 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. |
| Mar 6, 2018 | 0018-03-049 | WebbLaredo | 15.6 AC | $1,075.00 | REIM CONSTRUCTION, INC. |
| Mar 6, 2018 | 0684-01-069 | CameronPharr | 2.44 AC | $1,500.00 | TEXAS SAI, INC. |
| Feb 2, 2018 | 0169-05-042 | CarsonAmarillo | 18.54 AC | $603.13 | RK HALL, LLC |
| Feb 1, 2018 | 0904-13-024 | GrayAmarillo | 1.71 AC | $1,600.00 | STATELINE CONSTRUCTION, LLC |
| Nov 2, 2017 | 0141-08-047 | KimbleSan Angelo | 47 AC | $575.00 | LONE STAR PAVING COMPANY |
| Nov 2, 2017 | 0090-05-097 | PotterAmarillo | 1.65 AC | $1,050.00 | J. LEE MILLIGAN, INC. |
| Oct 4, 2017 | 0169-04-036 | CarsonAmarillo | 23 AC | $572.25 | RK HALL, LLC |
| Oct 4, 2017 | 0101-04-115 | San PatricioCorpus Christi | 0.37 AC | $6,765.86 | BAY LTD. |
| Oct 3, 2017 | 0555-05-024 | Tom GreenSan Angelo | 1.4 AC | $800.00 | 3LW CIVIL LLC |
| Oct 3, 2017 | 0433-01-030 | HidalgoPharr | 50.97 AC | $1,166.00 | ASAGO, LLC |
| Aug 9, 2017 | 0299-03-050 | MaverickLaredo | 86.5 AC | $780.00 | ANDERSON COLUMBIA CO., INC. |
| Aug 8, 2017 | 3621-01-012 | Val VerdeLaredo | 22.56 AC | $1,049.00 | HUNTER INDUSTRIES, LTD. |
| Jul 12, 2017 | 0237-07-013 | DimmitLaredo | 66.8 AC | $850.00 | ANDERSON COLUMBIA CO., INC. |
| Jul 12, 2017 | 0140-11-044 | CrockettSan Angelo | 17.866 AC | $619.28 | REECE ALBERT, INC. |
| Jun 7, 2017 | 0348-11-015 | Live OakCorpus Christi | 4.2 AC | $765.04 | HUNTER INDUSTRIES, LTD. |
| Apr 5, 2017 | 0035-05-057 | MenardSan Angelo | 6.39 AC | $750.00 | LONE STAR PAVING COMPANY |
| Apr 5, 2017 | 0312-01-078 | CookeWichita Falls | 2.23 AC | $940.00 | JAGOE-PUBLIC COMPANY |
| Jan 5, 2017 | 0289-03-026 | MillsBrownwood | 4 AC | $700.00 | BIG CREEK CONSTRUCTION, LTD. |
| Jan 5, 2017 | 0078-03-055 | ColemanBrownwood | 5.4 AC | $825.00 | J. H. STRAIN & SONS, INC. |
| Dec 1, 2016 | 0131-06-053 | DickensChildress | 0.25 AC | $3.00 | OPPORTUNITY EXCAVATION/CONCRETE, LLC |
| Nov 4, 2016 | 0219-02-013 | HidalgoPharr | 6.44 AC | $685.00 | TEXAS CORDIA CONSTRUCTION, LLC |