| 1 | 100-6002 |
PREPARING ROW | 12.6 | STA |
$2,000.00 |
$25,000.00 |
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 1,163 | CY |
$9.50 |
$20.00 |
| 3 | 110-6002 |
EXCAVATION (CHANNEL) | 1,296 | CY |
$15.00 |
$20.00 |
| 4 | 132-6001 |
EMBANKMENT (FINAL)(ORD COMP)(TY A) | 4,407 | CY |
$13.00 |
$40.00 |
| 5 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 1,034 | CY |
$14.00 |
$45.00 |
| 6 | 150-6002 |
BLADING | 60 | HR |
$150.00 |
$150.00 |
| 7 | 164-6035 |
DRILL SEEDING (PERM) (RURAL) (CLAY) | 4,271 | SY |
$1.00 |
$1.37 |
| 8 | 164-6036 |
DRILL SEEDING (PERM) (RURAL) (CLAY) | 2.2 | AC |
$500.00 |
$2,612.50 |
| 9 | 164-6042 |
DRILL SEEDING (TEMP) (WARM) | 2.2 | AC |
$500.00 |
$2,117.50 |
| 10 | 164-6043 |
DRILL SEEDING (TEMP) (COOL) | 4,271 | SY |
$1.00 |
$1.26 |
| 11 | 168-6001 |
VEGETATIVE WATERING | 48.1 | MG |
$150.00 |
$100.00 |
| 12 | 216-6001 |
PROOF ROLLING | 5 | HR |
$125.00 |
$150.00 |
| 13 | 247-6041 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 2,766 | CY |
$100.00 |
$175.00 |
| 14 | 310-6009 |
PRIME COAT (MC-30) | 2,263 | GAL |
$4.50 |
$8.00 |
| 15 | 316-6015 |
ASPH (AC-15P) | 6,811 | GAL |
$3.00 |
$8.00 |
| 16 | 316-6237 |
AGGR(TY-PD GR-3S SAC-B) | 40 | CY |
$102.00 |
$600.00 |
| 17 | 316-6238 |
AGGR(TY-PD GR-3 SAC-B) | 49 | CY |
$130.00 |
$600.00 |
| 18 | 316-6239 |
AGGR(TY-PD GR-4S SAC-B) | 30 | CY |
$72.00 |
$600.00 |
| 19 | 316-6240 |
AGGR(TY-PD GR-4 SAC-B) | 45 | CY |
$115.00 |
$600.00 |
| 20 | 400-6005 |
CEM STABIL BKFL | 28 | CY |
$235.00 |
$300.00 |
| 21 | 401-6001 |
FLOWABLE BACKFILL | 64 | CY |
$110.00 |
$300.00 |
| 22 | 403-6001 |
TEMPORARY SPL SHORING | 1,140 | SF |
$15.00 |
$45.00 |
| 23 | 416-6002 |
DRILL SHAFT (24 IN) | 219 | LF |
$175.00 |
$500.00 |
| 24 | 420-6011 |
CL B CONC (FLUME) | 6.2 | CY |
$600.00 |
$1,008.00 |
| 25 | 420-6013 |
CL C CONC (ABUT) | 22.8 | CY |
$1,100.00 |
$1,540.00 |
| 26 | 420-6029 |
CL C CONC (CAP) | 15.2 | CY |
$1,100.00 |
$1,967.00 |
| 27 | 420-6037 |
CL C CONC (COLUMN) | 4.5 | CY |
$1,100.00 |
$2,268.00 |
| 28 | 422-6007 |
REINF CONC SLAB (SLAB BEAM) | 3,309 | SF |
$25.00 |
$33.60 |
| 29 | 425-6012 |
PRESTR CONC SLAB BEAM (5SB15) | 651 | LF |
$170.00 |
$300.00 |
| 30 | 432-6031 |
RIPRAP (STONE PROTECTION)(12 IN) | 982 | CY |
$200.00 |
$215.00 |
| 31 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 65 | CY |
$420.00 |
$535.00 |
| 32 | 450-6006 |
RAIL (TY T223) | 152 | LF |
$110.00 |
$200.00 |
| 33 | 450-6018 |
RAIL (TY T631) | 867 | LF |
$75.00 |
$151.00 |
| 34 | 454-6004 |
ARMOR JOINT (SEALED) | 52 | LF |
$100.00 |
$200.00 |
| 35 | 462-6019 |
CONC BOX CULV (8 FT X 4 FT) | 60 | LF |
$600.00 |
$1,110.00 |
| 36 | 462-6029 |
CONC BOX CULV (10 FT X 5 FT) | 93 | LF |
$1,200.00 |
$1,590.00 |
| 37 | 462-6030 |
CONC BOX CULV (10 FT X 6 FT) | 210 | LF |
$1,200.00 |
$1,551.00 |
| 38 | 462-6096 |
CONC BOX CULV (8 FT X 3 FT) | 60 | LF |
$560.00 |
$1,057.50 |
| 39 | 462-6176 |
CONC BOX CULV (12 FT X 5 FT) | 90 | LF |
$1,000.00 |
$2,036.18 |
| 40 | 462-6205 |
CONCRETE BOX CULVERT (12 FT X 7 FT) | 180 | LF |
$1,000.00 |
$2,164.80 |
| 41 | 466-6155 |
WINGWALL (FW - 0) (HW=8 FT) | 1 | EA |
$22,000.00 |
$33,364.50 |
| 42 | 466-6168 |
WINGWALL (FW - S) (HW=7 FT) | 2 | EA |
$20,000.00 |
$26,760.00 |
| 43 | 466-6171 |
WINGWALL (PW - 1) (HW=10 FT) | 1 | EA |
$45,000.00 |
$52,927.50 |
| 44 | 466-6180 |
WINGWALL (PW - 1) (HW=5 FT) | 2 | EA |
$19,075.00 |
$20,325.00 |
| 45 | 466-6182 |
WINGWALL (PW - 1) (HW=7 FT) | 2 | EA |
$44,000.00 |
$27,675.00 |
| 46 | 466-6184 |
WINGWALL (PW - 1) (HW=9 FT) | 2 | EA |
$30,000.00 |
$43,800.00 |
| 47 | 467-6276 |
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C) | 4 | EA |
$12,500.00 |
$21,015.00 |
| 48 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 7 | EA |
$20,000.00 |
$100,000.00 |
| 49 | 500-6001 |
MOBILIZATION | 1 | LS |
$367,000.00 |
$500,000.00 |
| 50 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 26 | MO |
$3,500.00 |
$6,500.00 |
| 51 | 506-6003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 932 | LF |
$50.00 |
$61.88 |
| 52 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 932 | LF |
$13.00 |
$28.60 |
| 53 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 624 | SY |
$25.00 |
$43.18 |
| 54 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 624 | SY |
$6.25 |
$20.40 |
| 55 | 506-6030 |
BACKHOE WORK (EROSION & SEDMT CONT) | 7.9 | HR |
$70.00 |
$66.00 |
| 56 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 2,500 | LF |
$3.00 |
$3.41 |
| 57 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 2,500 | LF |
$1.00 |
$1.70 |
| 58 | 508-6001 |
CONSTRUCTING DETOURS | 7,969 | SY |
$50.00 |
$100.00 |
| 59 | 510-6001 |
ONE-WAY TRAF CONT (FLAGGER CONT) | 1,416 | HR |
$100.00 |
$80.00 |
| 60 | 512-6009 |
PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 2,780 | LF |
$35.00 |
$30.00 |
| 61 | 512-6010 |
PORT CTB (FUR & INST)(LOW PROF)(TY 2) | 200 | LF |
$35.00 |
$30.00 |
| 62 | 512-6033 |
PORT CTB (MOVE)(LOW PROF)(TY 1) | 3,660 | LF |
$7.00 |
$15.00 |
| 63 | 512-6034 |
PORT CTB (MOVE)(LOW PROF)(TY 2) | 320 | LF |
$10.00 |
$15.00 |
| 64 | 512-6045 |
PORT CTB (STKPL)(LOW PROF)(TY 1) | 1,980 | LF |
$8.00 |
$25.00 |
| 65 | 512-6046 |
PORT CTB (STKPL)(LOW PROF)(TY 2) | 40 | LF |
$10.00 |
$25.00 |
| 66 | 512-6057 |
PORT CTB (REMOVE)(LOW PROF)(TY 1) | 2,680 | LF |
$17.00 |
$30.00 |
| 67 | 512-6058 |
PORT CTB (REMOVE)(LOW PROF)(TY 2) | 160 | LF |
$17.00 |
$30.00 |
| 68 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 1,537.5 | LF |
$25.00 |
$30.86 |
| 69 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 3 | EA |
$2,000.00 |
$2,563.00 |
| 70 | 540-6048 |
TL-3 31" SHORT RADIUS (COMPLETE) | 1 | EA |
$21,000.00 |
$33,220.00 |
| 71 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 23 | EA |
$3,400.00 |
$3,700.40 |
| 72 | 644-6076 |
REMOVE SM RD SN SUP&AM | 8 | EA |
$91.50 |
$250.00 |
| 73 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 24 | EA |
$35.00 |
$30.00 |
| 74 | 658-6100 |
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) | 16 | EA |
$40.00 |
$45.00 |