| 1 | 100-6001 |
PREPARING ROW | 7.38 | AC |
$2,500.00 |
$6,740.12 |
$360.00 |
| 2 | 105-6043 |
REMOVING STAB BASE & ASPH PAV (0-6") | 28,868 | SY |
$10.00 |
$9.33 |
$11.08 |
| 3 | 134-6001 |
BACKFILL (TY A) | 99.2 | STA |
$70.00 |
$140.00 |
$567.85 |
| 4 | 216-6001 |
PROOF ROLLING | 18.5 | HR |
$85.00 |
$115.97 |
$120.00 |
| 5 | 247-6041 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 2,136 | CY |
$70.00 |
$129.75 |
$283.61 |
| 6 | 310-6009 |
PRIME COAT (MC-30) | 2,852 | GAL |
$6.00 |
$6.29 |
$5.09 |
| 7 | 316-6001 |
ASPH (MULTI OPTION) | 15,060 | GAL |
$4.00 |
$5.65 |
$3.22 |
| 8 | 316-6025 |
ASPH (HFRS-2) | 4,059 | GAL |
$5.00 |
$5.00 |
$3.39 |
| 9 | 316-6222 |
AGGR(TY-PB GR-3 SAC-B) | 251 | CY |
$70.00 |
$263.75 |
$447.95 |
| 10 | 316-6224 |
AGGR(TY-PB GR-4 SAC-B) | 194 | CY |
$96.00 |
$420.86 |
$447.95 |
| 11 | 316-6226 |
AGGR(TY-PB GR-5 SAC-B) | 115 | CY |
$120.00 |
$366.60 |
$484.23 |
| 12 | 340-6014 |
D-GR HMA(SQ) TY-B PG70-22 | 3,434 | TON |
$95.00 |
$171.49 |
$222.61 |
| 13 | 351-6002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 334 | SY |
$30.00 |
$82.11 |
$78.00 |
| 14 | 400-6005 |
CEM STABIL BKFL | 5 | CY |
$80.00 |
$498.48 |
$174.00 |
| 15 | 400-6006 |
CUT & RESTORING PAV | 7 | SY |
$100.00 |
$698.27 |
$90.00 |
| 16 | 432-6001 |
RIPRAP (CONC)(4 IN) | 1.4 | CY |
$500.00 |
$720.00 |
$960.00 |
| 17 | 464-6001 |
RC PIPE (CL III)(12 IN) | 40 | LF |
$55.00 |
$106.08 |
$66.00 |
| 18 | 467-6325 |
SET (TY II) (12 IN) (RCP) (6: 1) (C) | 2 | EA |
$45.00 |
$1,191.16 |
$960.00 |
| 19 | 480-6001 |
CLEAN EXIST CULVERTS | 1 | EA |
$250.00 |
$4,617.81 |
$1,440.00 |
| 20 | 496-6007 |
REMOV STR (PIPE) | 40 | LF |
$20.00 |
$36.22 |
$18.00 |
| 21 | 500-6001 |
MOBILIZATION | 1 | LS |
$93,820.00 |
$375,613.12 |
$43,117.53 |
| 22 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 | MO |
$1,500.00 |
$857.43 |
$1,440.00 |
| 23 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 111 | SY |
$22.00 |
$27.70 |
$42.00 |
| 24 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 111 | SY |
$7.00 |
$7.02 |
$18.00 |
| 25 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 27,936 | LF |
$1.60 |
$2.56 |
$6.00 |
| 26 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 27,936 | LF |
$1.00 |
$0.9300 |
$1.20 |
| 27 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 4,447 | LF |
$4.00 |
$10.26 |
$18.00 |
| 28 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 4,447 | LF |
$1.00 |
$3.21 |
$6.00 |
| 29 | 529-6025 |
CONC CURB (TY III) | 18,214 | LF |
$20.00 |
$11.68 |
$26.40 |
| 30 | 644-6027 |
IN SM RD SN SUP&AM TYS80(1)SA(P) | 3 | EA |
$476.00 |
$450.13 |
$600.00 |
| 31 | 644-6076 |
REMOVE SM RD SN SUP&AM | 3 | EA |
$85.00 |
$175.13 |
$60.00 |
| 32 | 666-6166 |
RE PM TY I (ACC PRK)(WHT)(SYMBOL ONLY) | 2 | EA |
$67.00 |
$435.63 |
$300.00 |
| 33 | 666-6207 |
REFL PAV MRK TY II (Y) 4" (SLD) | 832 | LF |
$0.1500 |
$2.28 |
$3.60 |
| 34 | 760-6001 |
DITCH CLEANING AND RESHAPING (FOOT) | 180 | LF |
$3.25 |
$34.16 |
$30.00 |