CCSJ 1062-01-218 · lets Dec 1, 2026 · Montgomery, Houston · FM 1485 · Surfacing/Roadway Restoration

$1,271,319Engineer's estimate Items at market: $1,715,351 (+34.9%)
$1,185,246Most likely low bid$1,039,944 to $1,308,448 (middle half)
5.1Expected bidders7 plan holders, 7 regular bidders
56/100Worth a lookMarket only. Set your company for a personal score

Where the low bid should land

$872,782 (1 in 10 go lower)$1,439,125 (1 in 10 go higher)

From 15 comparable let jobs (district + work type, estimates of $508,528 to $3,178,298, last 3 years). 73% of them went under the estimate; the typical low bid was -6.8% vs estimate.

Bid / no-bid score

  • Competition16 / 25Jobs like this draw about 5.1 bidders.
  • Margin9 / 20Low bids land at 93% of the estimate.

Set your company to add your experience, win rate and size fit.

Comparable jobs

Jun 2026 1683-01-040Fort Bend · 5 bidders $3,065,936+7.2%
Jun 2026 0050-12-002Harris · 4 bidders $733,755-6.6%
May 2026 3256-02-121Harris · 5 bidders $2,254,486-1.4%
Apr 2026 1745-01-020Waller · 5 bidders $1,140,623+34.4%
Apr 2026 1062-04-063Harris · 4 bidders $1,798,696+13.9%
Jan 2026 0271-16-169Harris · 4 bidders $2,017,346-16.2%
Dec 2025 0508-01-400Harris · 3 bidders $2,868,252+12.1%
Oct 2025 0192-02-064Brazoria · 3 bidders $1,826,598-20.2%

The field: plan holders and how they bid

Last 3 years in Texas
Plan holderBidsWinsIn HoustonAvg bid vs est.Avg win vs est.Their typical bid here
UMD Construction SharpestInformational Proposals 1851 of 2 2.8%4.9% $1,306,463
DURWOOD GREENE CONSTRUCTION CO.Bidders 692521 of 51 3.0%-10.6% $1,309,012
TEXAS MATERIALS GROUP, INC.Bidders 71018111 of 66 3.6%-3.6% $1,317,603
LARRY YOUNG PAVING, INC.Bidders 58150 of 10 5.2%-5.6% $1,337,996
HAYDEN PAVING, INC.Bidders 3421 of 22 12.6%5.6% $1,431,363
Rucoba & Maya Construction, LLCBidders 93 14.3%-2.6% $1,453,231
FORDE CONSTRUCTION COMPANY, INC.Bidders 821010 of 53 18.5%-5.7% $1,506,919

"Typical bid here" is the estimate times that contractor's average bid ratio. Plan holders with no bids are usually suppliers or subs.

Items that decide this job

42 of 46 items priced from low bids
ItemQtyMarket priceRange of low bidsAt marketShare
344-7052 SP MIXES SP-D SAC-A PG70-2210 low bids 4,303 TON$145.59$125.00 – $200.00 $626,47336.5%
500-7001 MOBILIZATION2229 low bids · prices swing 42,200,000,000x 1 LS$523,850.32$0.0010 – $42,200,000.00 $523,85030.5%
351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")151 low bids · prices swing 31x 2,496 SY$60.19$16.00 – $500.00 $150,2378.8%
432-7013 RIPRAP (MOW STRIP)(4 IN)593 low bids · prices swing 3,900x 148 CY$616.83$1.00 – $3,900.00 $91,2915.3%
540-7001 MTL W-BEAM GD FEN (TIM POST)511 low bids · prices swing 4,623x 2,500 LF$25.60$0.0500 – $231.17 $64,0073.7%
544-7001 GUARDRAIL END TREATMENT (INSTALL)697 low bids · prices swing 9,500x 12 EA$3,190.07$1.00 – $9,500.00 $38,2812.2%
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING2018 low bids · prices swing 273,686,480x 3 MO$11,585.04$0.0010 – $273,686.48 $34,7552.0%
104-7005 REMOV CONC (MOWSTRIP)114 low bids · prices swing 250x 2,900 LF$9.49$0.6000 – $150.00 $27,5131.6%
134-7001 BACKFILL (TY A)113 low bids · prices swing 200x 105 STA$224.26$30.00 – $6,000.00 $23,5481.4%
644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P)611 low bids · prices swing 67x 26 EA$696.14$60.00 – $4,000.00 $18,1001.1%
560-7008 MAILBOX INSTALL-S (TWW-POST) TY 4121 low bids · prices swing 146x 44 EA$337.58$5.00 – $730.00 $14,8530.9%
666-7309 ALL-WTHER PM TY I (W)6"(SLD)(100MIL)63 low bids · prices swing 29x 20,213 LF$0.6917$0.5100 – $15.00 $13,9820.8%
344-7077 TACK COAT277 low bids · prices swing 12,500x 3,521 GAL$3.25$0.0100 – $125.00 $11,4360.7%
354-7073 PLANE ASPH CONC PAV (0" TO 1.5")18 low bids · prices swing 13x 3,029 SY$3.19$1.16 – $15.00 $9,6710.6%
666-7315 ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)68 low bids · prices swing 19x 13,481 LF$0.6819$0.5200 – $10.00 $9,1920.5%