SH 6, 2nd Street to BS 35C
0192-02-064 · let Oct 8, 2025 · Brazoria, Houston · Overlay
$1,826,598Low bid: CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.-20.2% vs estimate $2,289,654
$302,014Left on the table16.5% gap to the second bid
3BiddersSpread 35% low to high
115Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | $1,826,598 | -20.2% | $302,014 | 6+$212,150 | 3-$515,581 | |
| 2 | TEXAS MATERIALS GROUP, INC. | $2,128,612 | +16.5% | -7.0% | $329,164 | 7+$242,891 | 6-$509,074 |
| 3 | DURWOOD GREENE CONSTRUCTION CO. | $2,457,776 | +34.6% | 7.3% | 10+$382,086 | 1-$299,850 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. vs TEXAS MATERIALS GROUP, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 344-7064 SP MIXES SP-D SAC-A PG76-22 | 4,133 TON | $138.00 | $170.00 | $129.17 | $132,256 |
| 500-7001 MOBILIZATION | 1 LS | $100,000.00 | $175,000.00 | $523,850.32 | $75,000 |
| 429-7009 CONC STR REPAIR (STANDARD) | 2,000 SF | $107.00 | $123.00 | $146.35 | $32,000 |
| 351-7013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(14") | 206 SY | $145.00 | $25.00 | $150.09 | -$24,720 |
| 361-7003 FULL - DEPTH REPAIR CRCP (8") | 70 CY | $2,000.00 | $2,198.00 | $721.60 | $13,860 |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 54.99 CY | $40.00 | $264.00 | $13.19 | $12,318 |
| 110-7003 EXCAV (SPECIAL) | 203.74 CY | $40.00 | $95.00 | $18.78 | $11,206 |
| 161-7002 COMPOST MANUF TOPSOIL (4") | 2,149 SY | $12.00 | $7.00 | $1.95 | -$10,745 |
| 354-7027 PLAN & TEXT CONC PAV(0" TO 2") | 2,100 SY | $15.00 | $10.00 | $23.27 | -$10,500 |
| 505-7003 TMA (MOBILE OPERATION) | 15 DAY | $125.00 | $769.00 | $229.60 | $9,660 |
| 316-7006 ASPH (AC-20XP) | 17,351 GAL | $4.55 | $4.00 | $3.13 | -$9,543 |
| 530-7006 DRIVEWAYS (CONC) | 596 SY | $110.00 | $126.00 | $109.20 | $9,536 |
| 104-7016 REMOV CONC (CURB) | 240 LF | $12.00 | $48.00 | $6.82 | $8,640 |
| 505-7001 TMA (STATIONARY) | 52 DAY | $230.00 | $377.00 | $217.57 | $7,644 |
| 479-7005 ADJUSTING MANHOLES (CAP) | 5 EA | $1,650.00 | $286.00 | $2,566.51 | -$6,820 |
| 105-7007 RMV (7"-11") TRT/UNTRT BASE & ASPH PAV | 189 SY | $11.00 | $46.00 | $7.66 | $6,615 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $4,000.00 | $2,465.00 | $11,585.04 | -$6,140 |
| 685-7005 RELOCT RDSD FLSH BCN AM (SOLAR PWRD) | 3 EA | $4,000.00 | $5,941.00 | $5,628.78 | $5,823 |
| 110-7002 EXCAV (CHANNEL) | 20 CY | $55.00 | $327.00 | $16.69 | $5,440 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 354 SY | $25.00 | $40.00 | $19.70 | $5,310 |
Positive: the low bidder was cheaper on that item. These 20 items account for $266,839 of the $302,014 gap.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 361-7003 FULL - DEPTH REPAIR CRCP (8") | 70 CY | $2,000.00 | $721.60 | 2.77x | $89,488 |
| 316-7245 AGGR (TY-PB OR PL, GR-4)(SAC-B) | 320 CY | $290.00 | $165.18 | 1.76x | $39,943 |
| 354-7019 PLANE & TEXT ASPH CONC PAV(2") | 3,232 SY | $9.30 | $1.62 | 5.75x | $24,830 |
| 361-7019 FULL - DEPTH REPAIR CPCD (8") | 20 CY | $2,000.00 | $807.74 | 2.48x | $23,845 |
| 161-7002 COMPOST MANUF TOPSOIL (4") | 2,149 SY | $12.00 | $1.95 | 6.16x | $21,604 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 1,592 LF | $15.00 | $7.19 | 2.09x | $12,438 |
| 500-7001 MOBILIZATION | 1 LS | $100,000.00 | $523,850.32 | 0.19x | -$423,850 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 5,377 LF | $4.50 | $15.92 | 0.28x | -$61,391 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $4,000.00 | $11,585.04 | 0.35x | -$30,340 |
TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 361-7003 FULL - DEPTH REPAIR CRCP (8") | 70 CY | $2,198.00 | $721.60 | 3.05x | $103,348 |
| 316-7245 AGGR (TY-PB OR PL, GR-4)(SAC-B) | 320 CY | $303.00 | $165.18 | 1.83x | $44,103 |
| 361-7019 FULL - DEPTH REPAIR CPCD (8") | 20 CY | $2,216.00 | $807.74 | 2.74x | $28,165 |
| 354-7019 PLANE & TEXT ASPH CONC PAV(2") | 3,232 SY | $10.00 | $1.62 | 6.18x | $27,093 |
| 110-7003 EXCAV (SPECIAL) | 203.74 CY | $95.00 | $18.78 | 5.06x | $15,530 |
| 132-7006 EMBANK (FNL)(DC)(TY C) | 54.99 CY | $264.00 | $13.19 | 20.01x | $13,792 |
| 161-7002 COMPOST MANUF TOPSOIL (4") | 2,149 SY | $7.00 | $1.95 | 3.60x | $10,859 |
| 500-7001 MOBILIZATION | 1 LS | $175,000.00 | $523,850.32 | 0.33x | -$348,850 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 5,377 LF | $5.00 | $15.92 | 0.31x | -$58,702 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,465.00 | $11,585.04 | 0.21x | -$36,480 |
| 354-7027 PLAN & TEXT CONC PAV(0" TO 2") | 2,100 SY | $10.00 | $23.27 | 0.43x | -$27,870 |
| 351-7013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(14") | 206 SY | $25.00 | $150.09 | 0.17x | -$25,769 |
| 479-7005 ADJUSTING MANHOLES (CAP) | 5 EA | $286.00 | $2,566.51 | 0.11x | -$11,403 |
DURWOOD GREENE CONSTRUCTION CO.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 531-7002 CONC SIDEWALKS (5") | 662 SY | $220.00 | $68.80 | 3.20x | $100,093 |
| 530-7006 DRIVEWAYS (CONC) | 596 SY | $275.00 | $109.20 | 2.52x | $98,818 |
| 316-7245 AGGR (TY-PB OR PL, GR-4)(SAC-B) | 320 CY | $305.00 | $165.18 | 1.85x | $44,743 |
| 354-7019 PLANE & TEXT ASPH CONC PAV(2") | 3,232 SY | $14.00 | $1.62 | 8.66x | $40,021 |
| 105-7007 RMV (7"-11") TRT/UNTRT BASE & ASPH PAV | 189 SY | $140.00 | $7.66 | 18.28x | $25,012 |
| 104-7011 REMOV CONC (DRIVEWAYS) | 354 SY | $70.00 | $19.70 | 3.55x | $17,805 |
| 529-7012 CONC CURB (DOWELED) | 224 LF | $95.00 | $18.32 | 5.19x | $17,176 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 42 DAY | $400.00 | $87.82 | 4.55x | $13,112 |
| 531-7006 CURB RAMPS (TY 2) | 3 EA | $7,500.00 | $3,210.97 | 2.34x | $12,867 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 1,592 LF | $15.00 | $7.19 | 2.09x | $12,438 |
| 500-7001 MOBILIZATION | 1 LS | $224,000.00 | $523,850.32 | 0.43x | -$299,850 |