IH 10 FR - Waco to McCarty
0508-01-400 · let Dec 3, 2025 · Harris, Houston · Overlay
$2,868,252Low bid: ENVIRONMENTAL ALLIES, INC.+12.1% vs estimate $2,558,143
$302,616Left on the table10.6% gap to the second bid
3BiddersSpread 62% low to high
60Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | ENVIRONMENTAL ALLIES, INC. | $2,868,252 | 12.1% | $302,616 | 1+$14,560 | 1-$448,850 | |
| 2 | TEXAS MATERIALS GROUP, INC. | $3,170,869 | +10.6% | 24.0% | $1,468,906 | 4+$451,227 | 2-$489,930 |
| 3 | DURWOOD GREENE CONSTRUCTION CO. | $4,639,775 | +61.8% | 81.4% | 6+$1,288,975 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
ENVIRONMENTAL ALLIES, INC. vs TEXAS MATERIALS GROUP, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 361-7003 FULL - DEPTH REPAIR CRCP (8") | 434 CY | $970.00 | $1,465.00 | $721.60 | $214,830 |
| 344-7064 SP MIXES SP-D SAC-A PG76-22 | 10,680 TON | $185.00 | $190.00 | $129.17 | $53,400 |
| 354-7066 PLANE CONC PAV(0" TO 2") | 3,844 SY | $8.00 | $20.00 | $4.21 | $46,128 |
| 529-7002 CONC CURB (TY II) | 378 LF | $9.00 | $100.00 | $26.45 | $34,398 |
| 354-7032 PLANE ASPH CONC PAV(0" TO 2") | 2,244 SY | $7.00 | $20.00 | $2.13 | $29,172 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $7,000.00 | $2,565.00 | $11,585.04 | -$17,740 |
| 666-7184 RE PM TY II (W) 24" (SLD) | 6,179 LF | $6.60 | $4.00 | $3.83 | -$16,065 |
| 3007-7001 BONDING COURSE | 19,344 GAL | $3.00 | $3.65 | $3.32 | $12,574 |
| 662-7112 WK ZN PAV MRK SHT TERM (TAB)TY W | 3,556 EA | $4.00 | $0.5500 | $1.03 | -$12,268 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 6,179 LF | $8.25 | $6.50 | $7.19 | -$10,813 |
| 104-7016 REMOV CONC (CURB) | 378 LF | $10.00 | $35.00 | $6.82 | $9,450 |
| 500-7001 MOBILIZATION | 1 LS | $75,000.00 | $70,000.00 | $523,850.32 | -$5,000 |
| 677-7004 ELIM EXT PM & MRKS (8") | 1,720 LF | $3.30 | $0.5300 | $0.6468 | -$4,764 |
| 666-7408 REFL PAV MRK TY I (W)6"(BRK)(100MIL) | 8,260 LF | $1.25 | $0.7500 | $0.5627 | -$4,130 |
| 677-7002 ELIM EXT PM & MRKS (6") | 1,243 LF | $3.30 | $0.2700 | $0.2755 | -$3,766 |
| 666-7069 REFL PAV MRK TY I(W)(ENTR GORE)(100MIL) | 7 EA | $825.00 | $355.00 | $869.92 | -$3,290 |
| 505-7001 TMA (STATIONARY) | 70 DAY | $235.00 | $275.00 | $217.57 | $2,800 |
| 666-7072 REFL PAV MRK TY I(W)(EXIT GORE)(100MIL) | 7 EA | $825.00 | $525.00 | $964.21 | -$2,100 |
| 666-7195 RE PM TY II (W) (ENTR GORE) | 7 EA | $500.00 | $200.00 | $337.62 | -$2,100 |
| 666-7168 RE PM TY II (W) 4" (BRK) | 8,260 LF | $0.7500 | $0.5300 | $0.2707 | -$1,817 |
Positive: the low bidder was cheaper on that item. These 20 items account for $318,897 of the $302,616 gap.
ENVIRONMENTAL ALLIES, INC.: unbalanced items
Placed 1TEXAS MATERIALS GROUP, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 361-7003 FULL - DEPTH REPAIR CRCP (8") | 434 CY | $1,465.00 | $721.60 | 2.03x | $322,637 |
| 354-7066 PLANE CONC PAV(0" TO 2") | 3,844 SY | $20.00 | $4.21 | 4.75x | $60,688 |
| 354-7032 PLANE ASPH CONC PAV(0" TO 2") | 2,244 SY | $20.00 | $2.13 | 9.39x | $40,100 |
| 529-7002 CONC CURB (TY II) | 378 LF | $100.00 | $26.45 | 3.78x | $27,802 |
| 500-7001 MOBILIZATION | 1 LS | $70,000.00 | $523,850.32 | 0.13x | -$453,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,565.00 | $11,585.04 | 0.22x | -$36,080 |
DURWOOD GREENE CONSTRUCTION CO.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 361-7003 FULL - DEPTH REPAIR CRCP (8") | 434 CY | $2,100.00 | $721.60 | 2.91x | $598,227 |
| 354-7066 PLANE CONC PAV(0" TO 2") | 3,844 SY | $80.00 | $4.21 | 18.99x | $291,328 |
| 354-7032 PLANE ASPH CONC PAV(0" TO 2") | 2,244 SY | $65.00 | $2.13 | 30.51x | $141,080 |
| 3007-7001 BONDING COURSE | 19,344 GAL | $8.50 | $3.32 | 2.56x | $100,179 |
| 529-7002 CONC CURB (TY II) | 378 LF | $250.00 | $26.45 | 9.45x | $84,502 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $30,000.00 | $11,585.04 | 2.59x | $73,660 |