ODOT Bid Results

Apr 2014 · 23 let jobs Sign up free
23Let jobs
$40,840,389Total low bids
$37,251,249Total estimates
+9.6%Low bids vs estimates

Apr 2014 results

Bid tabs (Excel) ExcelCSV
Let dateContractCounty / DistrictProject EstimateLow bidLow bidder% vs est.Bidders
Apr 17, 2014 140147NHPPY-136N(098) Sbr-136n(216)sb
KAY BRIDGE AND APPROACHES /BRIDGE REHABILITATION US -60: OVER BOIS D'ARC CREEK AND OVERFLOW, 12.9 MILES EAST OF I -35. PROJECT LENGTH = 1.015 MILES · $9,260,061 $10,533,899 WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES +13.8% 3
Apr 17, 2014 140137CIRB-102C(129)RB Alfalfa
Division 6
GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NS-255/EW-23): FROM EW-25, EXTEND NORTH THEN EAST ON EW -23. PROJECT LENGTH = 7.991 MILES · $5,840,399 $5,638,342 Venture Corporation dba VCO Paving -3.5% 2
Apr 17, 2014 140086STP-105B(084)UR Stp-105b(178)ur
BECKHAM GRADE, DRAIN, AND SURFACE CITY STREETS : ON PIONEER RD, FROM 20TH ST EXTEND NORTH , AND ON 20TH STREET, FROM PIONEER RD EXTEND EAST IN ELK CITY . PROJECT LENGTH = 0.905 MILES · $3,746,873 $4,918,666 TOM HUDSON PAVING, INC. +31.3% 2
Apr 17, 2014 140152CIRB-143C(088)RB Love
Division 7
GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (OSWALT ROAD ): FROM NS-324, EXTEND EAST. PROJECT LENGTH = 4.688 MILES · $4,628,701 $4,663,484 OVERLAND CORPORATION +0.8% 3
Apr 17, 2014 140041CIRB-133C(123)RB Jackson
Division 5
GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-210/NAVAJO RD ): BEGIN AT SH -19, EXTEND SOUTH. PROJECT LENGTH = 2.975 MILES · $2,313,058 $2,700,030 SEWELL BROS., INC. +16.7% 2
Apr 17, 2014 140153CIRB-144D(131)RB Mcclain
Division 3
GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NS-305/EW-131/EW-133): AT MULTIPLE LOCATIONS IN DIVISION III. PROJECT LENGTH = 1.245 MILES · $1,903,563 $2,044,642 HASKELL LEMON CONSTRUCTION CO. +7.4% 5
Apr 17, 2014 140160SSP-175C(087)SS Washita
Division 5
BRIDGE AND APPROACHES SH -55: OVER DRY ELK CREEK , 0.5 MILES WEST OF SH -44. PROJECT LENGTH = 0.331 MILES · $1,810,037 $1,799,794 SEWELL BROS., INC. -0.6% 5
Apr 17, 2014 140158SBR-259N(011)SB Pawnee
Division 8
BRIDGE REHABILITATION SH -18: OVER THE CIMARRON TURNPIKE (US-412), 4.4 MILES NORTH OF THE PAYNE COUNTY LINE . PROJECT LENGTH = 0.129 MILES · $1,175,049 $1,674,877 OBC, INC. +42.5% 5
Apr 17, 2014 140149SSR-240N(025)SR Leflore
RESURFACE (UTBWC) US-59: FROM 4.9 MILES NORTH OF US -270, EXTEND NORTH . PROJECT LENGTH = 5.01 MILES · $1,580,125 $1,659,054 JOB CONSTRUCTION CO., INC. +5.0% 2
Apr 17, 2014 140155CIRB-245D(021)RB Mccurtain
Division 2
GRADE, DRAIN, SURFACE AND BRIDGE COUNTY ROAD (CRAIG ROAD): FROM THE US -70 JUNCTION, EXTEND EAST. PROJECT LENGTH = 2.695 MILES · $1,214,169 $1,349,950 THE CUMMINS CONSTRUCTION CO., INC. +11.2% 2
Apr 17, 2014 140145ACSTP-227C(010)CI Grant
Division 4
RESURFACE (ASPHALT ) COUNTY ROAD (EW-2): FROM SH-132, EXTEND EAST. PROJECT LENGTH = 1.995 MILES · $1,220,836 $1,254,660 Venture Corporation dba VCO Paving +2.8% 2
Apr 17, 2014 140144SSP-125C(199)SS Garvin
Division 3
BRIDGE REHABILITATION SH-17A: OVER UNNAMED CREEK, 2.76 MILES EAST OF I-35. · $542,675 $574,947 PBX Corporation +5.9% 5
Apr 17, 2014 140154SSP-244N(014)SS Mcclain
Division 3
BRIDGE REHABILITATION SH -37: OVER I-44, 1.0 MILE SOUTH OF THE CLEVELAND COUNTY LINE . PROJECT LENGTH = 0.039 MILES · $482,472 $539,704 PBX Corporation +11.9% 3
Apr 17, 2014 140138SSP-NBIP(475)SS Beckham
Division 5
BRIDGE PAINTING I-40 EB/I-40 FRONTAGE ROAD: AT MULTIPLE LOCATIONS IN DIVISION V. · $591,399 $497,851 Elite Industrial Painting, Inc. -15.8% 6
Apr 17, 2014 140143STP-125D(157)CI Garvin
Division 3
BRIDGE AND APPROACHES COUNTY ROAD (NS-332): OVER NEGRO SANDY CREEK , 7.5 MILES EAST AND 4.3 MILES SOUTH OF PAULS VALLEY . PROJECT LENGTH = 0.207 MILES · $391,129 $337,395 BRIDGECO CONTRACTORS, INC. -13.7% 4
Apr 17, 2014 140141SSP-215F(011)SS Coal, Pottawatomie
JOINT SEAL/REPAIR US-270/SH-48/SH-102: AT MULTIPLE LOCATIONS IN DIVISION III. · $293,323 $280,662 B & B CONSTRUCTION SERVICE J.T., INC. -4.3% 5
Apr 17, 2014 140140SSP-215F(010)SS Coal, Pottawatomie
BRIDGE PAINTING SH-48/SH-102: AT MULTIPLE LOCATIONS IN DIVISION III. · — $97,784 Elite Industrial Painting, Inc. 2
Apr 17, 2014 140150SSP-241F(021)SS Garvin, Johnston, Lincoln, Mcclain, Pottawatomie, Seminole
BRIDGE WATER PROOF SEAL US -177/SH-7/SH-9/SH-18/SH-74: AT MULTIPLE LOCATION IN DIVISION III. · $85,760 $62,886 GARY A. CRAIN, INC. -26.7% 3
Apr 17, 2014 140159STPY-264F(015) Atoka, Bryan, Pittsburg, Pushmataha
BRIDGE WATER PROOF SEAL US -69B/US-271/SH-3/SH-9A/SH-113/SH-199/COAL CREEK RD : AT MULTIPLE LOCATIONS IN DIVISION II. · — $51,316 GARY A. CRAIN, INC. 2
Apr 17, 2014 140142STPY-220C(025) Blaine, Custer, Roger Mills, Washita
BRIDGE WATER PROOF SEAL US -270/SH-33/SH-44/SH-58/SH-152: AT MULTIPLE LOCATIONS IN DIVISION V. · $60,972 $50,541 GARY A. CRAIN, INC. -17.1% 2
Apr 17, 2014 140161STPY-277F(014) Alfalfa, Major, Woods, Woodward
BRIDGE WATER PROOF SEAL US -64/US-281/SH-11/SH-50/SH-58: AT MULTIPLE LOCATIONS IN DIVISION VI. · $67,576 $47,860 GARY A. CRAIN, INC. -29.2% 2
Apr 17, 2014 140156STPY-251F(020) Haskell, Muskogee, Okmulgee, Sequoyah
BRIDGE WATER PROOF SEAL US -62/US-64/SH-9/SH-10/SH-16: AT MULTIPLE LOCATIONS IN DIVISION I. · $43,070 $33,274 GARY A. CRAIN, INC. -22.7% 2
Apr 17, 2014 140139STPY-208F(013) Caddo, Comanche, Grady
BRIDGE WATER PROOF SEAL SH-17/SH-19/SH-37: AT MULTIPLE LOCATIONS IN DIVISION VII. · — $28,774 GARY A. CRAIN, INC. 1
1–23 of 23

Source: ODOT bid tabulations for each letting on Contracts and Proposals, read from ODOT's published bid tab reports, including the engineer's estimate. Bid Potato loads new lettings as ODOT posts them and backfills the last two years. Confirm against ODOT's official tabulations.