| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$15,500.00 |
$112,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$15,000.00 |
$36,400.00 |
$110,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,200 | LF |
$4.00 |
$2.50 |
$1.59 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 100 | LF |
$10.00 |
$10.95 |
$8.51 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 2,100 | SY |
$3.25 |
$4.90 |
$5.28 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 450 | CY |
$60.00 |
$68.90 |
$155.75 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 880 | TON |
$35.00 |
$34.45 |
$56.00 |
| 8 | 407(B) 0250 |
TACK COAT | 6,810 | GAL |
$3.50 |
$3.65 |
$6.15 |
| 9 | 408 5774 |
PRIME COAT | 180 | GAL |
$7.00 |
$6.20 |
$12.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 280 | TON |
$112.00 |
$155.15 |
$175.00 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,300 | TON |
$85.00 |
$85.00 |
$145.00 |
| 12 | 412 5267 |
COLD MILLING PAVEMENT | 245 | SY |
$12.00 |
$25.70 |
$60.00 |
| 13 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 1,752 | SY |
$25.00 |
$28.15 |
$42.00 |
| 14 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 270 | CY |
$110.00 |
$115.60 |
$145.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 1.5 | CY |
$370.00 |
$402.00 |
$500.00 |
| 16 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 1,151 | LF |
$7.25 |
$10.05 |
$12.00 |
| 17 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 44 | SY |
$75.00 |
$60.30 |
$90.00 |
| 18 | 613(C) 5105 |
36" PRECOATED CORR. STEEL PIPE | 36 | LF |
$70.00 |
$103.80 |
$175.00 |
| 19 | 613(C) 5216 |
28" X 20" PRECOATED CORR. STL. PIPE ARCH | 172 | LF |
$50.00 |
$105.50 |
$110.00 |
| 20 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$1,800.00 |
$2,815.00 |
$2,700.00 |
| 21 | 613(P) 0763 |
36" GALV. STEEL CULVERT END SECTION ROUND | 2 | EA |
$1,000.00 |
$688.30 |
$1,400.00 |
| 22 | 613(P) 4571 |
28" X 20" GALV. STEEL CULVERT END SECTION ARCH | 2 | EA |
$300.00 |
$401.00 |
$1,100.00 |
| 23 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$18.00 |
$20.10 |
$21.60 |
| 24 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,860.00 |
$1,998.00 |
| 25 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,100.00 |
$2,300.00 |
$2,467.80 |
| 26 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 59.7 | CY |
$24.00 |
$12.60 |
$32.40 |
| 27 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 112.96 | LF |
$80.00 |
$120.60 |
$77.33 |
| 28 | 509(A) 1326 |
CLASS AA CONCRETE | 142 | CY |
$500.00 |
$527.65 |
$518.40 |
| 29 | 511(A) 1332 |
REINFORCING STEEL | 51,800 | LB |
$0.9000 |
$1.10 |
$1.08 |
| 30 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$10,050.00 |
$11,664.00 |
| 31 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 56,930 | LF |
$0.1500 |
$0.2100 |
$0.2200 |
| 32 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$3,015.00 |
$3,240.00 |
| 33 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$24,875.00 |
$65,000.00 |
| 34 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$5,150.00 |
$5,400.00 |
| 35 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$91,110.00 |
$105,000.00 |