| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$75,000.00 |
$151,000.00 |
$167,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 24,500 | LF |
$1.25 |
$1.35 |
$1.22 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,300 | LF |
$7.00 |
$7.35 |
$6.68 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 84,700 | SY |
$1.60 |
$1.41 |
$1.27 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 18.49 | AC |
$600.00 |
$400.00 |
$200.00 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 10,464 | CY |
$45.00 |
$66.00 |
$55.34 |
| 7 | 307(B) 4210 |
CEMENT KILN DUST | 1,360 | TON |
$55.00 |
$75.00 |
$73.00 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 40,288 | SY |
$2.25 |
$3.00 |
$2.00 |
| 9 | 311(A) 0151 |
PROCESSING EXISTING BASE & SURFACE, METHOD A | 15,710 | LF |
$3.50 |
$3.00 |
$3.84 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 290 | TON |
$28.00 |
$26.00 |
$43.55 |
| 11 | 407(B) 0250 |
TACK COAT | 11,780 | GAL |
$2.75 |
$3.30 |
$2.35 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 6,868 | TON |
$90.00 |
$82.50 |
$102.51 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,755 | TON |
$90.00 |
$84.25 |
$110.69 |
| 14 | 509(B) 0321 |
CLASS A CONCRETE | 84.2 | CY |
$500.00 |
$510.00 |
$940.91 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$350.00 |
$330.00 |
| 16 | 511(A) 0332 |
REINFORCING STEEL | 8,274 | LB |
$0.9000 |
$1.00 |
$1.00 |
| 17 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 30 | TON |
$38.00 |
$40.00 |
$56.36 |
| 18 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 10 | TON |
$32.00 |
$50.00 |
$44.57 |
| 19 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 96 | LF |
$120.00 |
$100.00 |
$178.13 |
| 20 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 40 | LF |
$70.00 |
$95.00 |
$148.09 |
| 21 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 160 | LF |
$80.00 |
$110.00 |
$117.10 |
| 22 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 356 | LF |
$35.00 |
$32.00 |
$39.77 |
| 23 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 740 | LF |
$45.00 |
$37.00 |
$34.57 |
| 24 | 613(L) 4515 |
28" X 18" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$650.00 |
$1,200.00 |
$1,480.49 |
| 25 | 613(L) 4526 |
36" X 22" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$800.00 |
$1,300.00 |
$1,399.03 |
| 26 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,300.00 |
$1,300.00 |
$1,440.24 |
| 27 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 12 | EA |
$1,100.00 |
$1,300.00 |
$1,200.00 |
| 28 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 4 | EA |
$1,800.00 |
$1,500.00 |
$1,700.00 |
| 29 | 619(B) 0291 |
REMOVAL OF HEADWALL | 8 | EA |
$1,200.00 |
$1,500.00 |
$1,300.00 |
| 30 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 787 | LF |
$15.00 |
$23.00 |
$20.60 |
| 31 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 46.26 | SF |
$20.00 |
$18.00 |
$17.00 |
| 32 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 132 | LF |
$10.00 |
$8.50 |
$8.00 |
| 33 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 33,845 | LF |
$0.7500 |
$0.5000 |
$0.4800 |
| 34 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 8 | EA |
$100.00 |
$80.00 |
$75.00 |
| 35 | 855(B) 8821 |
TRAFFIC STRIPE(PLASTIC)(WORDS) | 12 | EA |
$125.00 |
$185.00 |
$175.00 |
| 36 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$7,500.00 |
$8,900.00 |
$7,865.46 |
| 37 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$40,000.00 |
$9,593.27 |
| 38 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$1,381.86 |
| 39 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$45,000.00 |
$140,000.00 |
$115,000.00 |