| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 500 | CY |
$20.00 |
$15.00 |
$45.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 350 | CY |
$10.00 |
$18.00 |
$45.00 |
| 3 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 400 | CY |
$50.00 |
$46.00 |
$65.00 |
| 4 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 1,200 | SY |
$3.25 |
$3.54 |
$6.00 |
| 5 | 404(G) 4845 |
ULTRA-THIN BONDED WEARING COURSE, TYPE C | 5,300 | TON |
$105.00 |
$117.90 |
$122.00 |
| 6 | 407(B) 0250 |
TACK COAT | 100 | GAL |
$4.00 |
$4.25 |
$5.95 |
| 7 | 408 5774 |
PRIME COAT | 700 | GAL |
$5.00 |
$4.15 |
$1.00 |
| 8 | 410(A) 6530 |
(SP)HOT-IN-PLACE RECYCLED ASPHALT CONCRETE | 95,000 | SY |
$4.50 |
$5.87 |
$5.00 |
| 9 | 410(B) 6540 |
(SP)HOT-IN PLACE ASPHALT EMULSION | 320 | TON |
$900.00 |
$420.00 |
$725.00 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 450 | TON |
$90.00 |
$94.50 |
$120.00 |
| 11 | 412 5267 |
COLD MILLING PAVEMENT | 11,100 | SY |
$4.75 |
$3.68 |
$4.50 |
| 12 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$12,500.00 |
$45,000.00 |
| 13 | 619(C) 0924 |
SAWING PAVEMENT | 600 | LF |
$5.00 |
$2.60 |
$3.00 |
| 14 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 50,400 | LF |
$0.2000 |
$0.0900 |
$0.1800 |
| 15 | 855(A) 8813 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 117,200 | LF |
$0.5000 |
$0.6600 |
$0.6900 |
| 16 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 1,500 | LF |
$1.75 |
$0.6700 |
$3.75 |
| 17 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 3,000 | LF |
$3.25 |
$0.7000 |
$6.00 |
| 18 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 200 | LF |
$6.00 |
$10.00 |
$12.00 |
| 19 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 58 | EA |
$90.00 |
$85.00 |
$100.00 |
| 20 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 25 | EA |
$125.00 |
$40.00 |
$180.00 |
| 21 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$12,000.00 |
$35,000.00 |
| 22 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$100,000.00 |
$50,000.00 |