| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$7,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 965 | CY |
$18.00 |
$18.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$5,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 960 | LF |
$2.50 |
$3.99 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 140 | LF |
$11.00 |
$29.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 460 | SY |
$5.00 |
$25.00 |
| 7 | 232(B) 2814 |
SEEDING METHOD B | 0.1 | AC |
$3,000.00 |
$39,000.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.1 | AC |
$3,500.00 |
$39,000.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 923 | CY |
$60.00 |
$46.50 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 3,391 | SY |
$2.50 |
$4.00 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 3,391 | SY |
$2.00 |
$2.50 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 625 | TON |
$45.00 |
$24.50 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 829 | TON |
$105.00 |
$80.00 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 271 | TON |
$150.00 |
$86.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$500.00 |
$300.00 |
| 16 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,700 | SY |
$8.00 |
$5.00 |
| 17 | 504(B) 1305 |
SAW-CUT GROOVING | 389.4 | SY |
$5.00 |
$8.20 |
| 18 | 504(C) 6250 |
SEALED EXPANSION JOINT | 58.4 | LF |
$275.00 |
$400.00 |
| 19 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 326.4 | LF |
$85.00 |
$125.00 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 57,380 | LB |
$3.25 |
$2.66 |
| 21 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,500.00 |
$1,500.00 |
| 22 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$1,500.00 |
$1,500.00 |
| 23 | 509(A) 1326 |
CLASS AA CONCRETE | 118.2 | CY |
$700.00 |
$950.00 |
| 24 | 509(B) 1328 |
CLASS A CONCRETE | 1.4 | CY |
$1,200.00 |
$2,500.00 |
| 25 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 29,020 | LB |
$1.50 |
$2.25 |
| 26 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$35.00 |
$30.00 |
| 27 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$150.00 |
$80.00 |
| 28 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 50 | SY |
$750.00 |
$800.00 |
| 29 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 50 | SY |
$80.00 |
$50.00 |
| 30 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$30,000.00 |
$108,500.00 |
| 31 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 375 | LF |
$20.00 |
$19.00 |
| 32 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,000.00 |
$1,400.00 |
| 33 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$1,500.00 |
$500.00 |
| 34 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 3 | EA |
$2,500.00 |
$2,450.00 |
| 35 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$3,000.00 |
| 36 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$4,500.00 |
| 37 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$58,700.00 |
$126,900.00 |