| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$6,000.00 |
$10,333.00 |
$6,292.34 |
$22,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,016 | CY |
$10.00 |
$5.00 |
$10.13 |
$6.29 |
$7.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$1,363.00 |
$4,404.64 |
$12,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 997 | LF |
$3.00 |
$2.99 |
$3.26 |
$3.76 |
$3.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 70 | LF |
$10.00 |
$12.95 |
$14.13 |
$16.30 |
$20.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 400 | SY |
$3.00 |
$6.95 |
$7.58 |
$8.75 |
$5.00 |
| 7 | 232(B) 2814 |
SEEDING METHOD B | 2.86 | AC |
$276.00 |
$6,750.00 |
$7,361.14 |
$8,494.66 |
$1,500.00 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.86 | AC |
$300.00 |
$6,750.00 |
$7,361.14 |
$8,494.66 |
$1,500.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 487 | CY |
$44.00 |
$18.50 |
$48.53 |
$22.65 |
$45.00 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 2,537 | SY |
$4.00 |
$2.00 |
$2.73 |
$2.83 |
$2.50 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 187 | TON |
$25.00 |
$18.00 |
$27.26 |
$21.80 |
$30.00 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 619 | TON |
$95.00 |
$83.00 |
$75.64 |
$101.69 |
$115.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 250 | TON |
$115.00 |
$87.00 |
$134.59 |
$123.10 |
$125.00 |
| 14 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$300.00 |
$414.40 |
$410.26 |
$700.00 |
| 15 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 55 | TON |
$60.00 |
$28.25 |
$54.53 |
$34.70 |
$40.00 |
| 16 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 28 | TON |
$50.00 |
$20.75 |
$44.40 |
$25.89 |
$30.00 |
| 17 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 38 | LF |
$40.00 |
$21.25 |
$41.70 |
$23.91 |
$70.00 |
| 18 | 613(B) 0695 |
54" CORR. GALV. STEEL PIPE | 42 | LF |
$100.00 |
$59.00 |
$92.57 |
$82.30 |
$170.00 |
| 19 | 613(L) 5740 |
54" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$4,000.00 |
$1,500.00 |
$1,636.00 |
$1,722.84 |
$2,600.00 |
| 20 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$1,500.00 |
$1,581.00 |
$629.24 |
$1,900.00 |
| 21 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$5,998.00 |
$4,404.64 |
$15,000.00 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,333 | SY |
$6.00 |
$4.00 |
$7.44 |
$3.15 |
$5.00 |
| 23 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 1 | EA |
$120.00 |
$65.00 |
$71.00 |
$125.85 |
$400.00 |
| 24 | 629(C) 4960 |
MAILBOX | 1 | EA |
$55.00 |
$30.00 |
$33.00 |
$62.92 |
$400.00 |
| 25 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 1 | EA |
$50.00 |
$30.00 |
$33.00 |
$31.46 |
$200.00 |
| 26 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,860 | CY |
$7.50 |
$10.00 |
$18.12 |
$6.29 |
$7.00 |
| 27 | 501(C) 1308 |
SUBSTRUCTURE EXCAVATION ROCK | 70 | CY |
$50.00 |
$75.00 |
$56.08 |
$13.21 |
$70.00 |
| 28 | 501(G) 6309 |
CLSM BACKFILL | 517 | CY |
$109.70 |
$120.00 |
$90.49 |
$95.64 |
$120.00 |
| 29 | 504(F) 6006 |
HANDRAILING | 188 | LF |
$140.00 |
$100.00 |
$70.16 |
$140.95 |
$70.00 |
| 30 | 508 6359 |
PRECAST ARCH CULVERT | 44 | LF |
$3,800.00 |
$3,300.00 |
$3,024.76 |
$5,357.64 |
$4,400.00 |
| 31 | 509(A) 1326 |
CLASS AA CONCRETE | 14 | CY |
$1,000.00 |
$717.25 |
$673.80 |
$836.88 |
$700.00 |
| 32 | 509(B) 1328 |
CLASS A CONCRETE | 118 | CY |
$650.00 |
$717.25 |
$427.90 |
$765.15 |
$700.00 |
| 33 | 511(A) 1332 |
REINFORCING STEEL | 16,166 | LB |
$1.10 |
$1.00 |
$0.8300 |
$0.9900 |
$2.00 |
| 34 | 511(B) 4269 |
EPOXY COATED REINFORCING STEEL | 2,218 | LB |
$1.25 |
$2.00 |
$1.34 |
$1.27 |
$2.00 |
| 35 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 138 | SY |
$5.00 |
$7.00 |
$6.32 |
$8.81 |
$20.00 |
| 36 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,481 | TON |
$40.00 |
$36.00 |
$35.27 |
$34.70 |
$40.00 |
| 37 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 140 | TON |
$35.00 |
$28.00 |
$33.50 |
$25.89 |
$30.00 |
| 38 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 104 | LF |
$40.00 |
$80.00 |
$16.78 |
$22.65 |
$32.00 |
| 39 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 32 | LF |
$30.00 |
$60.00 |
$16.36 |
$22.65 |
$32.00 |
| 40 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$6,000.00 |
$6,500.00 |
$49,674.00 |
$5,033.87 |
$11,000.00 |
| 41 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10 | SF |
$21.00 |
$20.00 |
$21.81 |
$21.41 |
$40.00 |
| 42 | 851(C) 8324 |
2" SQUARE TUBE POST | 20 | LF |
$12.00 |
$10.00 |
$10.91 |
$10.70 |
$20.00 |
| 43 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,400 | LF |
$1.87 |
$1.30 |
$1.42 |
$2.14 |
$1.50 |
| 44 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$2,050.00 |
$2,236.00 |
$2,355.03 |
$4,000.00 |
| 45 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$5,200.00 |
$5,383.00 |
$9,060.97 |
$6,500.00 |
| 46 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$5,000.00 |
$1,636.00 |
$1,887.70 |
$3,500.00 |
| 47 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$58,000.00 |
$45,200.00 |
$58,780.00 |
$50,653.36 |
$60,000.00 |