| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$29,692.56 |
$19,263.91 |
$15,000.00 |
$45,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 7,472 | CY |
$11.30 |
$10.24 |
$11.75 |
$14.75 |
| 3 | 210 0121 |
OBLITERATING ABANDONED ROAD | 682 | LF |
$9.24 |
$33.90 |
$63.00 |
$10.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,444 | LF |
$1.47 |
$1.99 |
$2.00 |
$2.25 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 176 | LF |
$8.68 |
$21.29 |
$11.95 |
$8.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 15,920 | SY |
$1.71 |
$2.11 |
$1.95 |
$2.10 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,841 | CY |
$52.08 |
$49.00 |
$49.00 |
$40.00 |
| 8 | 325 5271 |
SEPARATOR FABRIC | 20,584 | SY |
$1.51 |
$1.00 |
$1.30 |
$1.30 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,015 | TON |
$33.95 |
$28.00 |
$23.00 |
$34.00 |
| 10 | 407(B) 0250 |
TACK COAT | 2,182 | GAL |
$3.57 |
$2.25 |
$1.20 |
$1.30 |
| 11 | 408 5774 |
PRIME COAT | 9,163 | GAL |
$3.69 |
$0.5000 |
$1.80 |
$2.00 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 3,622 | TON |
$83.03 |
$54.00 |
$59.79 |
$66.00 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,538 | TON |
$93.59 |
$59.00 |
$63.72 |
$68.00 |
| 14 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 64 | LF |
$167.45 |
$155.22 |
$200.00 |
$240.00 |
| 15 | 613(A) 4499 |
51" X 31" R.C.PIPE ARCH CLASS A-III | 136 | LF |
$212.98 |
$163.70 |
$211.00 |
$250.00 |
| 16 | 613(C) 5216 |
28" X 20" PRECOATED CORR. STL. PIPE ARCH | 314 | LF |
$45.00 |
$66.14 |
$44.00 |
$45.00 |
| 17 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$1,752.98 |
$2,349.90 |
$1,000.00 |
$2,300.00 |
| 18 | 613(L) 4540 |
51" X 31" PREFAB. CULVERT END SECTION, ARCH | 8 | EA |
$1,800.00 |
$2,859.28 |
$1,000.00 |
$2,500.00 |
| 19 | 613(P) 4571 |
28" X 20" GALV. STEEL CULVERT END SECTION ARCH | 14 | EA |
$450.00 |
$278.80 |
$350.00 |
$350.00 |
| 20 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$23,416.98 |
$16,458.17 |
$40,000.00 |
$27,500.00 |
| 21 | 619(C) 0924 |
SAWING PAVEMENT | 48 | LF |
$7.24 |
$11.79 |
$9.00 |
$8.25 |
| 22 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 13,199 | LF |
$7.00 |
$5.51 |
$4.50 |
$5.00 |
| 23 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 4 | EA |
$192.25 |
$306.39 |
$150.00 |
$150.00 |
| 24 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 167.04 | SF |
$18.08 |
$24.51 |
$20.00 |
$22.00 |
| 25 | 851(C) 8324 |
2" SQUARE TUBE POST | 244.63 | LF |
$9.12 |
$13.48 |
$11.00 |
$14.00 |
| 26 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 6 | EA |
$21.00 |
$30.64 |
$25.00 |
$30.00 |
| 27 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 26,976 | LF |
$0.1800 |
$0.1300 |
$0.1200 |
$0.1500 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,465.66 |
$3,676.62 |
$7,500.00 |
$5,000.00 |
| 29 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$34,706.03 |
$27,574.59 |
$19,000.00 |
$20,000.00 |
| 30 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,559.57 |
$1,500.00 |
$3,000.00 |
$25,000.00 |
| 31 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$82,268.24 |
$70,000.00 |
$76,000.00 |
$110,000.00 |