| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$5,000.00 |
$16,000.00 |
$20,000.00 |
$16,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,263.55 | CY |
$10.37 |
$8.00 |
$10.60 |
$9.00 |
$15.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,304.69 | CY |
$14.53 |
$9.00 |
$8.50 |
$12.00 |
$11.50 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,560 | LF |
$1.82 |
$3.00 |
$2.25 |
$1.40 |
$1.74 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 90 | LF |
$8.75 |
$7.00 |
$15.00 |
$8.00 |
$14.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 1,620 | SY |
$2.79 |
$3.00 |
$5.89 |
$6.00 |
$5.63 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 410.8 | CY |
$58.23 |
$40.00 |
$66.33 |
$44.00 |
$56.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,016.4 | TON |
$31.71 |
$30.00 |
$24.30 |
$26.00 |
$27.09 |
| 9 | 407(B) 0250 |
TACK COAT | 234.2 | GAL |
$5.03 |
$1.00 |
$2.00 |
$1.00 |
$11.00 |
| 10 | 408 5774 |
PRIME COAT | 983.5 | GAL |
$5.44 |
$5.00 |
$4.10 |
$3.50 |
$4.50 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 393.4 | TON |
$106.70 |
$120.00 |
$112.00 |
$98.50 |
$143.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 256.7 | TON |
$129.88 |
$150.00 |
$121.50 |
$130.00 |
$184.00 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 6 | CY |
$317.63 |
$300.00 |
$300.00 |
$800.00 |
$400.00 |
| 14 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 161 | TON |
$43.47 |
$50.00 |
$34.50 |
$43.00 |
$42.47 |
| 15 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 50 | SY |
$2.30 |
$2.00 |
$8.00 |
$8.00 |
$16.50 |
| 16 | 613(B) 5168 |
24" X 18" CORR. GALV. STEEL PIPE ARCH | 38 | LF |
$45.00 |
$30.00 |
$38.00 |
$32.00 |
$65.00 |
| 17 | 613(E) 7230 |
72" CORRUGATED POLYETHYLENE PIPE | 120 | LF |
$150.00 |
$120.00 |
$162.50 |
$175.00 |
$184.00 |
| 18 | 613(P) 7030 |
24" X 18" GALV. STEEL CULVERT END SECTION ARCH | 2 | EA |
$350.00 |
$150.00 |
$45.00 |
$250.00 |
$350.00 |
| 19 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 75 | LF |
$22.23 |
$25.00 |
$22.00 |
$18.00 |
$17.55 |
| 20 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,778.90 |
$2,500.00 |
$1,800.00 |
$1,750.00 |
$1,815.00 |
| 21 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,295.56 |
$2,250.00 |
$2,450.00 |
$2,600.00 |
$2,817.50 |
| 22 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$17.14 |
$15.00 |
$12.00 |
$22.00 |
$12.00 |
| 23 | 501(G) 6309 |
CLSM BACKFILL | 88 | CY |
$158.77 |
$155.00 |
$185.00 |
$135.00 |
$195.00 |
| 24 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 269 | LF |
$249.78 |
$230.00 |
$223.00 |
$260.00 |
$256.00 |
| 25 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$183.92 |
$200.00 |
$174.00 |
$170.00 |
$225.00 |
| 26 | 504(B) 1305 |
SAW-CUT GROOVING | 313.3 | SY |
$7.89 |
$10.00 |
$8.00 |
$14.00 |
$8.40 |
| 27 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 246.4 | LF |
$83.82 |
$85.00 |
$77.00 |
$90.00 |
$80.00 |
| 28 | 506(A) 1322 |
STRUCTURAL STEEL | 510 | LB |
$2.67 |
$2.50 |
$3.00 |
$4.00 |
$3.00 |
| 29 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$980.89 |
$650.00 |
$600.00 |
$900.00 |
$1,000.00 |
| 30 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$970.64 |
$650.00 |
$600.00 |
$900.00 |
$1,000.00 |
| 31 | 509(A) 1326 |
CLASS AA CONCRETE | 71.9 | CY |
$744.67 |
$650.00 |
$575.00 |
$630.00 |
$685.00 |
| 32 | 509(B) 1328 |
CLASS A CONCRETE | 69.8 | CY |
$854.25 |
$600.00 |
$575.00 |
$650.00 |
$700.00 |
| 33 | 511(A) 1332 |
REINFORCING STEEL | 26,650 | LB |
$1.01 |
$1.00 |
$1.05 |
$0.9000 |
$0.9400 |
| 34 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 195.76 | LF |
$38.62 |
$30.00 |
$26.10 |
$63.00 |
$35.00 |
| 35 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 444.63 | LF |
$39.58 |
$40.00 |
$27.85 |
$65.00 |
$38.50 |
| 36 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 195.76 | LF |
$13.42 |
$15.00 |
$15.00 |
$40.00 |
$15.00 |
| 37 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 444.63 | LF |
$15.52 |
$15.00 |
$10.00 |
$40.00 |
$16.50 |
| 38 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 39 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 839.88 | TON |
$43.47 |
$35.00 |
$33.50 |
$35.00 |
$41.47 |
| 40 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 1,036.84 | SY |
$2.30 |
$2.00 |
$3.00 |
$3.00 |
$4.75 |
| 41 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,685.85 |
$5,000.00 |
$15,000.00 |
$10,000.00 |
$9,500.00 |
| 42 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 29.26 | SF |
$19.85 |
$20.00 |
$17.00 |
$18.00 |
$20.00 |
| 43 | 851(C) 8324 |
2" SQUARE TUBE POST | 44.99 | LF |
$10.74 |
$18.00 |
$17.00 |
$17.00 |
$20.00 |
| 44 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,648 | LF |
$0.4000 |
$0.3500 |
$0.2900 |
$0.3000 |
$0.3000 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$3,500.00 |
$2,900.00 |
$5,000.00 |
$3,000.00 |
| 46 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$10,150.00 |
$20,000.00 |
$11,000.00 |
| 47 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,000.00 |
$3,000.00 |
$20,000.00 |
$3,750.00 |
| 48 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$57,080.47 |
$25,000.00 |
$48,000.00 |
$60,000.00 |
$42,500.00 |