| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$19,000.00 |
$12,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,617 | CY |
$6.00 |
$13.00 |
$14.00 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 179 | CY |
$30.00 |
$50.00 |
$50.00 |
| 4 | 202(G) 0189 |
PRESPLITTING OF ROCK | 64 | F DR |
$30.00 |
$350.00 |
$30.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$18,000.00 |
$6,000.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,083 | LF |
$2.00 |
$2.50 |
$1.56 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 196 | LF |
$8.50 |
$14.00 |
$12.25 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 8,859 | SY |
$1.50 |
$2.25 |
$1.67 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.04 | AC |
$400.00 |
$1,600.00 |
$100.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,421 | TON |
$25.00 |
$50.00 |
$35.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$500.00 |
$250.00 |
| 12 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 262 | TON |
$35.00 |
$60.00 |
$50.00 |
| 13 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 113 | TON |
$30.00 |
$50.00 |
$42.00 |
| 14 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 46 | LF |
$40.00 |
$90.00 |
$45.00 |
| 15 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,100.00 |
$1,400.00 |
$1,600.00 |
| 16 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$16,000.00 |
$2,000.00 |
| 17 | 509(B) 1328 |
CLASS A CONCRETE | 146 | CY |
$590.00 |
$500.00 |
$700.00 |
| 18 | 510(A) 6360 |
ROCK FILLED RETAINING WALL | 472 | SY |
$77.00 |
$190.00 |
$360.00 |
| 19 | 535 6950 |
CORRUGATED STEEL ARCH CULVERT | 38 | LF |
$3,000.00 |
$4,200.00 |
$8,500.00 |
| 20 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,875 | TON |
$35.00 |
$50.00 |
$47.00 |
| 21 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 203 | TON |
$30.00 |
$50.00 |
$42.00 |
| 22 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$31,000.00 |
$14,000.00 |
| 23 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 425 | LF |
$17.00 |
$23.00 |
$19.00 |
| 24 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,800.00 |
$2,500.00 |
| 25 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$14,000.00 |
$2,490.00 |
| 26 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$11,000.00 |
$6,980.00 |
| 27 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$1,250.00 |
| 28 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$80,000.00 |
$76,000.00 |