| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$61,326.51 |
$100,000.00 |
$94,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 119,972 | CY |
$8.00 |
$5.00 |
$3.00 |
$6.00 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 119,631 | CY |
$15.00 |
$15.00 |
$21.00 |
$19.00 |
| 4 | 202(G) 0189 |
PRESPLITTING OF ROCK | 2,500 | F DR |
$30.00 |
$51.25 |
$70.00 |
$73.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$54,238.51 |
$10,000.00 |
$31,900.00 |
| 6 | 210 0121 |
OBLITERATING ABANDONED ROAD | 136 | LF |
$10.00 |
$17.39 |
$25.00 |
$10.00 |
| 7 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,071 | LF |
$2.00 |
$2.27 |
$1.00 |
$1.50 |
| 8 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,274 | LF |
$9.00 |
$9.30 |
$7.00 |
$9.25 |
| 9 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 1 | EA |
$180.00 |
$394.72 |
$300.00 |
$395.00 |
| 10 | 227 0300 |
(SP)TURF REINFORCEMENT MAT | 470 | SY |
$30.00 |
$43.15 |
$33.00 |
$43.00 |
| 11 | 230(A) 2806 |
SOLID SLAB SODDING | 35,509 | SY |
$1.60 |
$1.32 |
$1.00 |
$1.35 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 7.34 | AC |
$300.00 |
$127.12 |
$100.00 |
$127.00 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 4,038 | CY |
$45.00 |
$37.07 |
$31.00 |
$43.50 |
| 14 | 310(B) 0149 |
SUBGRADE, METHOD B | 17,442 | SY |
$3.00 |
$1.34 |
$0.2500 |
$1.65 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 18,529 | SY |
$1.20 |
$1.41 |
$1.00 |
$1.40 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 631 | TON |
$25.00 |
$20.58 |
$15.00 |
$19.00 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,350 | TON |
$78.00 |
$60.98 |
$45.00 |
$72.50 |
| 18 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,874 | TON |
$85.00 |
$70.44 |
$55.00 |
$79.00 |
| 19 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 890 | SY |
$30.00 |
$27.10 |
$20.00 |
$24.75 |
| 20 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 223 | CY |
$120.00 |
$139.78 |
$110.00 |
$121.00 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 858 | CY |
$250.00 |
$260.72 |
$275.00 |
$300.00 |
| 22 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 12 | TON |
$65.00 |
$133.81 |
$40.00 |
$46.00 |
| 23 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 310 | LF |
$30.00 |
$42.34 |
$16.00 |
$22.00 |
| 24 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 98 | LF |
$30.00 |
$38.98 |
$50.00 |
$43.50 |
| 25 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 60 | LF |
$35.00 |
$43.74 |
$70.00 |
$50.00 |
| 26 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 4 | EA |
$1,000.00 |
$824.35 |
$2,000.00 |
$1,500.00 |
| 27 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,400.00 |
$1,221.01 |
$2,000.00 |
$2,200.00 |
| 28 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$10,987.93 |
$2,500.00 |
$25,000.00 |
| 29 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,413 | SY |
$4.20 |
$8.25 |
$4.00 |
$5.00 |
| 30 | 619(C) 0924 |
SAWING PAVEMENT | 180 | LF |
$9.00 |
$13.38 |
$5.00 |
$3.00 |
| 31 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 2 | EA |
$1,800.00 |
$5,352.13 |
$5,500.00 |
$2,500.00 |
| 32 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 101 | SF |
$20.00 |
$33.45 |
$27.50 |
$33.50 |
| 33 | 851(C) 8324 |
2" SQUARE TUBE POST | 192 | LF |
$10.00 |
$5.35 |
$4.00 |
$5.35 |
| 34 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 18,675 | LF |
$1.00 |
$0.8000 |
$0.6600 |
$0.8000 |
| 35 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 905 | LF |
$1.50 |
$0.8000 |
$0.7000 |
$0.8000 |
| 36 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 41 | LF |
$15.00 |
$9.36 |
$8.00 |
$9.00 |
| 37 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 13 | EA |
$100.00 |
$200.70 |
$165.00 |
$200.00 |
| 38 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 2,120 | LF |
$1.00 |
$0.3300 |
$0.3000 |
$0.3500 |
| 39 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$25,000.00 |
$6,355.65 |
$10,000.00 |
$6,175.00 |
| 40 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$35,832.51 |
$15,000.00 |
$19,400.00 |
| 41 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,500.00 |
$3,345.08 |
$4,500.00 |
$4,000.00 |
| 42 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$215,519.00 |
$158,806.79 |
$104,053.00 |
$65,000.00 |