Bid tab 160181

Let Apr 21, 2016 · Division 8 · Rogers Sign up free

‹ Apr 2016 results

GRADE, DRAIN, AND SURFACE CITY STREET (NORTH 193RD EAST AVENUE ): FROM SH-266, EXTEND NORTH NEAR CATOOSA . PROJECT LENGTH = 0.584 MILE

Let date
Thursday, April 21, 2016
Contract
160181
J/P numbers
26988(04)
District
Division 8
County
Rogers
Highway
Limits
GRADE, DRAIN, AND SURFACE CITY STREET (NORTH 193RD EAST AVENUE ): FROM SH-266, EXTEND NORTH NEAR CATOOSA . PROJECT LENGTH = 0.584 MILE
Project number
STP-166C(244)CI

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$4,437,202
1 SHERWOOD CONSTRUCTION CO., INC. Low bidder $3,970,133 -10.5%
2 BECCO CONTRACTORS, INC. $4,205,000 -5.2% +5.9%
3 Tri Star Construction Arkansas, LLC $4,655,640 +4.9% +17.3%

Bid tab: unit prices 42 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SHERWOOD CONSTR…#2 BECCO CONTRACTO…#3 Tri Star Constr…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $30,000.00 $61,326.51 $100,000.00 $94,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION119,972CY $8.00 $5.00 $3.00 $6.00
3202(C) 0182 ROCK EXCAVATION119,631CY $15.00 $15.00 $21.00 $19.00
4202(G) 0189 PRESPLITTING OF ROCK2,500F DR $30.00 $51.25 $70.00 $73.00
5205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $25,000.00 $54,238.51 $10,000.00 $31,900.00
6210 0121 OBLITERATING ABANDONED ROAD136LF $10.00 $17.39 $25.00 $10.00
7221(C) 2801 TEMPORARY SILT FENCE4,071LF $2.00 $2.27 $1.00 $1.50
8221(F) 0100 TEMPORARY SILT DIKE1,274LF $9.00 $9.30 $7.00 $9.25
9221(H) 0450 (PL)TEMPORARY INLET SEDIMENT FILTER1EA $180.00 $394.72 $300.00 $395.00
10227 0300 (SP)TURF REINFORCEMENT MAT470SY $30.00 $43.15 $33.00 $43.00
11230(A) 2806 SOLID SLAB SODDING35,509SY $1.60 $1.32 $1.00 $1.35
12233(A) 2817 VEGETATIVE MULCHING7.34AC $300.00 $127.12 $100.00 $127.00
13303(A) 2100 AGGREGATE BASE TYPE A4,038CY $45.00 $37.07 $31.00 $43.50
14310(B) 0149 SUBGRADE, METHOD B17,442SY $3.00 $1.34 $0.2500 $1.65
15325 5271 SEPARATOR FABRIC18,529SY $1.20 $1.41 $1.00 $1.40
16402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E631TON $25.00 $20.58 $15.00 $19.00
17411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)5,350TON $78.00 $60.98 $45.00 $72.50
18411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,874TON $85.00 $70.44 $55.00 $79.00
19414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )890SY $30.00 $27.10 $20.00 $24.75
20414(G) 5275 P.C. CONCRETE FOR PAVEMENT223CY $120.00 $139.78 $110.00 $121.00
21509(D) 0325 CLASS C CONCRETE858CY $250.00 $260.72 $275.00 $300.00
22601(A) 0297 TYPE I PLAIN RIPRAP12TON $65.00 $133.81 $40.00 $46.00
23609(B) 1513 1'-8" COMB. CURB & GUTTER (6" BARRIER)310LF $30.00 $42.34 $16.00 $22.00
24613(B) 0689 18" CORR. GALV. STEEL PIPE98LF $30.00 $38.98 $50.00 $43.50
25613(B) 0690 24" CORR. GALV. STEEL PIPE60LF $35.00 $43.74 $70.00 $50.00
26613(M) 7186 TYPE A4 CULVERT END TREATMENT4EA $1,000.00 $824.35 $2,000.00 $1,500.00
27613(M) 7187 TYPE B4 CULVERT END TREATMENT2EA $1,400.00 $1,221.01 $2,000.00 $2,200.00
28619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $15,000.00 $10,987.93 $2,500.00 $25,000.00
29619(B) 4728 REMOVAL OF ASPHALT PAVEMENT1,413SY $4.20 $8.25 $4.00 $5.00
30619(C) 0924 SAWING PAVEMENT180LF $9.00 $13.38 $5.00 $3.00
31624(D) 4470 GATE, GALVANIZED STEEL2EA $1,800.00 $5,352.13 $5,500.00 $2,500.00
32850(A) 8110 SHEET ALUMINUM SIGNS101SF $20.00 $33.45 $27.50 $33.50
33851(C) 8324 2" SQUARE TUBE POST192LF $10.00 $5.35 $4.00 $5.35
34856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)18,675LF $1.00 $0.8000 $0.6600 $0.8000
35856(A) 8540 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)905LF $1.50 $0.8000 $0.7000 $0.8000
36856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)41LF $15.00 $9.36 $8.00 $9.00
37856(B) 8860 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS)13EA $100.00 $200.70 $165.00 $200.00
38857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)2,120LF $1.00 $0.3300 $0.3000 $0.3500
39880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $25,000.00 $6,355.65 $10,000.00 $6,175.00
40642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $20,000.00 $35,832.51 $15,000.00 $19,400.00
41220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,500.00 $3,345.08 $4,500.00 $4,000.00
42641 1552 MOBILIZATION1LSUM $215,519.00 $158,806.79 $104,053.00 $65,000.00