| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,000 | CY |
$20.00 |
$9.56 |
$9.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,000 | CY |
$15.00 |
$4.00 |
$9.50 |
| 3 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 17,400 | CY |
$65.00 |
$51.00 |
$55.95 |
| 4 | 325 5271 |
SEPARATOR FABRIC | 82,200 | SY |
$2.50 |
$0.8000 |
$1.25 |
| 5 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 82,200 | SY |
$3.00 |
$1.20 |
$1.50 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 5,800 | TON |
$40.00 |
$20.00 |
$23.45 |
| 7 | 407(B) 0250 |
TACK COAT | 5,300 | GAL |
$3.50 |
$2.75 |
$3.25 |
| 8 | 408 5774 |
PRIME COAT | 47,900 | GAL |
$5.00 |
$0.5000 |
$4.30 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 12,000 | TON |
$85.00 |
$56.09 |
$61.10 |
| 10 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 8,000 | TON |
$80.00 |
$64.50 |
$70.85 |
| 11 | 412 5267 |
COLD MILLING PAVEMENT | 100 | SY |
$50.00 |
$70.00 |
$25.00 |
| 12 | 506(A) 1322 |
STRUCTURAL STEEL | 7,334.01 | LB |
$3.00 |
$3.47 |
$2.00 |
| 13 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 4,000 | TON |
$50.00 |
$52.35 |
$43.45 |
| 14 | 613(A) 0400 |
12" R.C.PIPE CLASS III | 4 | LF |
$350.00 |
$90.58 |
$160.00 |
| 15 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 36 | LF |
$200.00 |
$91.77 |
$190.00 |
| 16 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 4 | LF |
$500.00 |
$127.22 |
$200.00 |
| 17 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 56 | LF |
$65.00 |
$99.09 |
$42.90 |
| 18 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 1 | EA |
$1,100.00 |
$1,315.34 |
$2,000.00 |
| 19 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 9 | EA |
$1,300.00 |
$1,793.64 |
$2,200.00 |
| 20 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 1 | EA |
$3,000.00 |
$2,989.41 |
$3,000.00 |
| 21 | 619(B) 0291 |
REMOVAL OF HEADWALL | 29 | EA |
$850.00 |
$1,195.76 |
$666.00 |
| 22 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 23 | EA |
$200.00 |
$119.58 |
$100.00 |
| 23 | 804(A) 2915 |
STRUCTURAL CONCRETE | 99.09 | CY |
$500.00 |
$1,360.12 |
$920.00 |
| 24 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 105,600 | LF |
$0.5000 |
$0.3900 |
$0.3700 |
| 25 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$80,000.00 |
$12,500.00 |
| 26 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$35,000.00 |
$12,000.00 |
| 27 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$200,000.00 |
$210,000.00 |
$195,000.00 |