| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 8,429 | CY |
$6.00 |
$9.00 |
$14.00 |
$9.50 |
$11.88 |
| 2 | 310(B) 0149 |
SUBGRADE, METHOD B | 68,298 | SY |
$2.90 |
$2.00 |
$2.00 |
$1.85 |
$2.00 |
| 3 | 407(B) 0250 |
TACK COAT | 3,255 | GAL |
$2.80 |
$1.63 |
$3.70 |
$3.50 |
$4.38 |
| 4 | 408 5774 |
PRIME COAT | 17,074 | GAL |
$4.00 |
$1.00 |
$4.40 |
$8.05 |
$7.00 |
| 5 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 14,853 | TON |
$74.00 |
$60.00 |
$70.41 |
$94.25 |
$104.50 |
| 6 | 411(D) 5970 |
SUPERPAVE, TYPE S5(PG 70-28 OK) | 5 | TON |
$89.00 |
$425.00 |
$365.00 |
$300.00 |
$306.25 |
| 7 | 411(D) 5975 |
SUPERPAVE, TYPE S5(PG 64-22 OK) | 5,505 | TON |
$86.00 |
$63.00 |
$75.86 |
$97.25 |
$105.63 |
| 8 | 412 5267 |
COLD MILLING PAVEMENT | 23,446 | SY |
$3.50 |
$3.28 |
$6.00 |
$6.50 |
$5.25 |
| 9 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 3,342 | SY |
$14.00 |
$33.00 |
$65.00 |
$33.05 |
$29.50 |
| 10 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 7,500 | SY |
$40.00 |
$97.00 |
$90.00 |
$94.10 |
$92.00 |
| 11 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 2,502 | CY |
$117.00 |
$175.00 |
$200.00 |
$174.00 |
$155.00 |
| 12 | 415 6300 |
CONCRETE JOINT SEALING | 80,360 | LF |
$1.10 |
$3.00 |
$3.25 |
$3.30 |
$2.91 |
| 13 | 416 0100 |
DOWEL BAR RETROFIT | 950 | EA |
$24.00 |
$60.00 |
$60.00 |
$61.60 |
$55.00 |
| 14 | 425 5195 |
DIAMOND GRINDING CONCRETE PAVEMENT | 94,581 | SY |
$2.75 |
$3.30 |
$4.00 |
$3.25 |
$2.87 |
| 15 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 48 | LF |
$63.00 |
$107.64 |
$60.00 |
$233.75 |
$106.25 |
| 16 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$700.00 |
$1,603.25 |
$2,500.00 |
$1,500.00 |
$1,593.75 |
| 17 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 18.52 | CY |
$50.00 |
$112.54 |
$60.00 |
$65.00 |
$81.25 |
| 18 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$800.00 |
$577.97 |
$4,500.00 |
$2,750.00 |
$625.00 |
| 19 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 4,826 | SY |
$3.00 |
$7.61 |
$3.00 |
$8.50 |
$8.00 |
| 20 | 619(C) 0924 |
SAWING PAVEMENT | 181 | LF |
$4.75 |
$5.78 |
$4.00 |
$20.00 |
$8.00 |
| 21 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 18 | EA |
$100.00 |
$115.59 |
$100.00 |
$112.00 |
$125.00 |
| 22 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 4 | EA |
$150.00 |
$288.99 |
$250.00 |
$280.00 |
$250.00 |
| 23 | 629(C) 4960 |
MAILBOX | 27 | EA |
$55.00 |
$57.80 |
$50.00 |
$56.00 |
$50.00 |
| 24 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 27 | EA |
$20.00 |
$260.09 |
$30.00 |
$30.00 |
$37.50 |
| 25 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 9 | EA |
$125.00 |
$260.09 |
$225.00 |
$252.00 |
$256.25 |
| 26 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 127,512 | LF |
$0.5000 |
$0.4600 |
$0.4000 |
$0.4500 |
$0.5500 |
| 27 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 210 | LF |
$0.8000 |
$5.78 |
$5.00 |
$5.60 |
$1.88 |
| 28 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 42 | LF |
$2.30 |
$11.56 |
$10.00 |
$11.20 |
$7.50 |
| 29 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 1 | EA |
$240.00 |
$288.98 |
$250.00 |
$280.00 |
$1,250.00 |
| 30 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 2 | EA |
$240.00 |
$288.99 |
$250.00 |
$280.00 |
$937.50 |
| 31 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$12,000.00 |
$37,568.10 |
$250,000.00 |
$15,000.00 |
$232,777.00 |