| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$40,000.00 |
$45,000.00 |
$46,000.00 |
$54,000.00 |
$65,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 300 | LF |
$2.50 |
$1.80 |
$1.86 |
$1.79 |
$2.00 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$9.00 |
$6.55 |
$6.60 |
$6.44 |
$8.00 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 6,200 | SY |
$2.00 |
$1.45 |
$1.50 |
$1.43 |
$2.00 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.29 | AC |
$650.00 |
$447.00 |
$400.00 |
$440.37 |
$500.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 416 | TON |
$35.00 |
$30.00 |
$30.75 |
$32.40 |
$40.00 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$300.00 |
$312.50 |
$355.98 |
$400.00 |
| 8 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 154 | LF |
$35.00 |
$30.00 |
$24.00 |
$26.79 |
$120.00 |
| 9 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$1,200.00 |
$1,100.00 |
$1,250.00 |
$768.47 |
$800.00 |
| 10 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$13.50 |
$15.00 |
$8.00 |
$15.12 |
$25.00 |
| 11 | 501(G) 6309 |
CLSM BACKFILL | 80 | CY |
$150.00 |
$150.00 |
$162.50 |
$92.77 |
$200.00 |
| 12 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 556.01 | LF |
$210.00 |
$180.00 |
$185.00 |
$185.14 |
$220.00 |
| 13 | 504(C) 6250 |
SEALED EXPANSION JOINT | 35.17 | LF |
$260.00 |
$255.00 |
$270.00 |
$254.64 |
$200.00 |
| 14 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 336 | LF |
$70.00 |
$70.00 |
$76.00 |
$79.62 |
$100.00 |
| 15 | 506(A) 1322 |
STRUCTURAL STEEL | 1,370 | LB |
$2.75 |
$2.50 |
$2.50 |
$2.75 |
$3.00 |
| 16 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$850.00 |
$550.00 |
$700.00 |
$981.56 |
$1,200.00 |
| 17 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$850.00 |
$550.00 |
$700.00 |
$981.56 |
$1,200.00 |
| 18 | 509(A) 1326 |
CLASS AA CONCRETE | 137.2 | CY |
$575.00 |
$550.00 |
$620.00 |
$530.06 |
$550.00 |
| 19 | 509(B) 1328 |
CLASS A CONCRETE | 124.8 | CY |
$525.00 |
$550.00 |
$647.50 |
$554.09 |
$600.00 |
| 20 | 511(A) 1332 |
REINFORCING STEEL | 50,380 | LB |
$0.9000 |
$0.7500 |
$0.8200 |
$0.8200 |
$1.00 |
| 21 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 190 | LF |
$32.00 |
$25.00 |
$31.50 |
$25.64 |
$30.00 |
| 22 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 425 | LF |
$38.00 |
$30.00 |
$33.60 |
$34.41 |
$35.00 |
| 23 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 190 | LF |
$14.00 |
$15.00 |
$13.50 |
$16.20 |
$35.00 |
| 24 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 425 | LF |
$14.00 |
$15.00 |
$14.40 |
$16.20 |
$35.00 |
| 25 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 26 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 178 | LF |
$650.00 |
$700.00 |
$610.00 |
$542.37 |
$650.00 |
| 27 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$2,750.00 |
$3,400.00 |
$2,200.00 |
$2,052.00 |
$2,000.00 |
| 28 | 516(D) 6400 |
CSL ACCESS TUBES | 380 | LF |
$5.00 |
$5.00 |
$15.00 |
$7.04 |
$6.00 |
| 29 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 3,200 | TON |
$38.00 |
$40.00 |
$42.00 |
$40.49 |
$50.00 |
| 30 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 967 | TON |
$32.00 |
$33.00 |
$33.35 |
$34.84 |
$40.00 |
| 31 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$7,500.00 |
$10,250.00 |
$27,000.00 |
$20,000.00 |
| 32 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,200.00 |
$3,025.00 |
$2,975.00 |
$2,970.00 |
$2,800.00 |
| 33 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,640.00 |
$3,100.00 |
$3,736.80 |
$5,000.00 |
| 34 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$7,700.00 |
$10,000.00 |
$9,396.00 |
$12,000.00 |
| 35 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$3,000.00 |
$3,000.00 |
$5,500.00 |
$3,500.00 |
| 36 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$55,000.00 |
$40,000.00 |
$39,000.00 |
$61,338.18 |
$65,000.00 |