| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$22,081.00 |
$35,750.00 |
$30,000.00 |
$40,500.00 |
| 2 | 209 0120 |
MACHINE GRADING | 25,639.4 | LF |
$5.00 |
$5.66 |
$2.00 |
$10.00 |
$2.80 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 18,796 | LF |
$1.80 |
$1.37 |
$1.25 |
$0.9000 |
$2.00 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 756 | LF |
$7.90 |
$9.53 |
$8.00 |
$8.63 |
$13.50 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 18,093 | SY |
$2.00 |
$1.69 |
$1.80 |
$1.70 |
$2.40 |
| 6 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 25,639.4 | LF |
$7.00 |
$8.00 |
$20.10 |
$2.86 |
$18.50 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 6,999.3 | TON |
$20.00 |
$29.01 |
$28.00 |
$29.75 |
$30.00 |
| 8 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 63,016 | SY |
$9.00 |
$6.65 |
$9.75 |
$12.34 |
$5.90 |
| 9 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 11,490 | CY |
$110.00 |
$107.50 |
$125.00 |
$138.00 |
$153.00 |
| 10 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 600 | TON |
$45.00 |
$45.27 |
$45.00 |
$54.39 |
$48.00 |
| 11 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 1,594 | LF |
$35.00 |
$43.46 |
$30.00 |
$25.30 |
$51.00 |
| 12 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 292 | LF |
$40.00 |
$49.28 |
$37.00 |
$38.96 |
$58.50 |
| 13 | 613(C) 5206 |
21" X 15" PRECOATED CORR. STL. PIPE ARCH | 124 | LF |
$50.00 |
$90.47 |
$35.00 |
$56.88 |
$93.50 |
| 14 | 613(C) 5231 |
49" X 33" PRECOATED CORR. STL. PIPE ARCH | 122 | LF |
$70.00 |
$239.86 |
$75.00 |
$88.65 |
$163.00 |
| 15 | 613(C) 5285 |
57" X 38" PRECOATED CORR. STL. PIPE ARCH | 36 | LF |
$80.00 |
$346.35 |
$85.00 |
$173.08 |
$215.00 |
| 16 | 613(C) 5290 |
71" X 47" PRECOATED CORR. STL. PIPE ARCH | 48 | LF |
$90.00 |
$399.57 |
$107.00 |
$193.61 |
$307.00 |
| 17 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$280.00 |
$546.91 |
$150.00 |
$324.50 |
$310.00 |
| 18 | 613(L) 4544 |
57" X 38" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$350.00 |
$1,183.88 |
$950.00 |
$1,337.04 |
$1,350.00 |
| 19 | 613(L) 4558 |
71" X 47" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$500.00 |
$1,711.29 |
$1,800.00 |
$2,166.46 |
$2,500.00 |
| 20 | 613(P) 4571 |
28" X 20" GALV. STEEL CULVERT END SECTION ARCH | 20 | EA |
$350.00 |
$582.34 |
$225.00 |
$246.69 |
$313.00 |
| 21 | 613(P) 4574 |
49" X 33" GALV. STEEL CULVERT END SECTION ARCH | 6 | EA |
$500.00 |
$1,024.64 |
$800.00 |
$744.10 |
$1,000.00 |
| 22 | 613(P) 7025 |
21" X 15" GALV. STEEL CULVERT END SECTION ARCH | 106 | EA |
$250.00 |
$547.13 |
$150.00 |
$153.61 |
$239.00 |
| 23 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$11,990.09 |
$45,000.00 |
$25,000.00 |
$21,500.00 |
| 24 | 619(C) 0924 |
SAWING PAVEMENT | 74 | LF |
$6.00 |
$16.32 |
$6.00 |
$6.09 |
$12.00 |
| 25 | 613(C) 5290 |
71" X 47" PRECOATED CORR. STL. PIPE ARCH | 114 | LF |
$90.00 |
$399.57 |
$120.00 |
$49.39 |
$313.00 |
| 26 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,293.13 |
$10,000.00 |
$25,145.54 |
$11,500.00 |
| 27 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 102,558 | LF |
$0.1000 |
$0.0600 |
$0.1500 |
$0.0700 |
$0.1000 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$12,780.00 |
$15,000.00 |
$14,626.35 |
$18,500.00 |
| 29 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$23,825.00 |
$40,000.00 |
$30,471.55 |
$45,500.00 |
| 30 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$603.00 |
$5,000.00 |
$1,828.29 |
$19,500.00 |
| 31 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$160,000.00 |
$120,000.00 |
$150,000.00 |
$198,699.64 |