| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$45,348.73 |
$7,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 20,177 | CY |
$7.00 |
$11.00 |
$10.90 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 200 | CY |
$15.00 |
$15.00 |
$25.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,405 | LF |
$3.75 |
$1.28 |
$1.49 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,020 | LF |
$8.50 |
$7.79 |
$6.95 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 39,560 | SY |
$1.75 |
$1.68 |
$1.34 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.2 | AC |
$600.00 |
$250.71 |
$199.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,716 | CY |
$54.00 |
$48.95 |
$65.55 |
| 9 | 307(A) 4200 |
FLY ASH | 672 | TON |
$62.50 |
$65.29 |
$70.00 |
| 10 | 307(D) 4230 |
LIME | 195 | TON |
$180.00 |
$152.03 |
$150.00 |
| 11 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 17,667 | SY |
$2.70 |
$1.75 |
$2.00 |
| 12 | 307(G) 4260 |
LIME PRETREATMENT | 17,667 | SY |
$1.90 |
$1.75 |
$2.00 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,101 | TON |
$30.00 |
$30.05 |
$30.00 |
| 14 | 407(B) 0250 |
TACK COAT | 1,021 | GAL |
$3.10 |
$2.75 |
$5.00 |
| 15 | 408 5774 |
PRIME COAT | 9,633 | GAL |
$3.80 |
$2.00 |
$4.00 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,309 | TON |
$93.00 |
$74.75 |
$65.55 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,511 | TON |
$95.00 |
$78.00 |
$82.90 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 15 | CY |
$250.00 |
$381.06 |
$700.00 |
| 19 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 45 | TON |
$42.00 |
$71.17 |
$65.00 |
| 20 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 325 | LF |
$90.00 |
$84.95 |
$79.16 |
| 21 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 198 | LF |
$30.00 |
$37.39 |
$27.56 |
| 22 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 40 | LF |
$35.00 |
$47.76 |
$34.14 |
| 23 | 613(L) 4504 |
21" X 15" PREFAB. CULVERT END SECTION, ARCH | 10 | EA |
$250.00 |
$280.27 |
$212.76 |
| 24 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$320.00 |
$433.70 |
$240.18 |
| 25 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$2,359.56 |
$2,400.00 |
| 26 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 4 | EA |
$1,800.00 |
$1,816.68 |
$3,600.00 |
| 27 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 37 | CY |
$32.00 |
$91.23 |
$50.00 |
| 28 | 613(V) 1180 |
TRENCH EXCAVATION | 62 | CY |
$5.00 |
$59.05 |
$10.00 |
| 29 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,500.00 |
$65,000.00 |
$15,000.00 |
| 30 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 2 | EA |
$100.00 |
$125.36 |
$100.00 |
| 31 | 629(C) 4960 |
MAILBOX | 2 | EA |
$50.00 |
$31.34 |
$25.00 |
| 32 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 2 | EA |
$30.00 |
$31.34 |
$25.00 |
| 33 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 8 | EA |
$20.00 |
$25.07 |
$20.00 |
| 34 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 20,900 | LF |
$0.4800 |
$0.5600 |
$0.4500 |
| 35 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,000.00 |
$10,000.00 |
$2,200.00 |
| 36 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$18,000.00 |
$50,000.00 |
$56,800.00 |
| 37 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$1,350.00 |
$10,000.00 |
| 38 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$80,000.00 |
$88,000.00 |
$165,000.00 |