| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$9,500.00 |
$22,736.00 |
$52,500.00 |
| 2 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$7,500.00 |
$6,720.00 |
$35,650.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,502 | LF |
$5.00 |
$1.51 |
$2.24 |
$2.40 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 20 | LF |
$10.00 |
$13.33 |
$22.40 |
$24.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 1,293 | SY |
$5.00 |
$5.07 |
$3.36 |
$3.60 |
| 6 | 230(F) 2812 |
WATERING | 104 | KGAL |
$10.00 |
$5.00 |
$22.40 |
$24.00 |
| 7 | 234(A) 2824 |
FERTILIZING (10-20-10) | 0.13 | TON |
$900.00 |
$690.00 |
$1,120.00 |
$1,200.00 |
| 8 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 500 | TON |
$150.00 |
$176.00 |
$179.20 |
$192.00 |
| 9 | 412 5267 |
COLD MILLING PAVEMENT | 2,135 | SY |
$12.00 |
$16.75 |
$13.39 |
$7.40 |
| 10 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,150 | LF |
$5.00 |
$3.90 |
$4.48 |
$3.60 |
| 11 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 850 | LF |
$25.00 |
$17.05 |
$17.36 |
$18.50 |
| 12 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,000.00 |
$2,073.50 |
$2,111.20 |
$2,260.00 |
| 13 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,500.00 |
$1,501.50 |
$1,528.80 |
$1,640.00 |
| 14 | 501(G) 6309 |
CLSM BACKFILL | 20 | CY |
$300.00 |
$277.50 |
$238.30 |
$326.00 |
| 15 | 504(A) 1304 |
APPROACH SLAB | 156 | SY |
$350.00 |
$337.50 |
$227.19 |
$547.00 |
| 16 | 504(B) 1305 |
SAW-CUT GROOVING | 738 | SY |
$5.00 |
$5.06 |
$5.52 |
$5.50 |
| 17 | 504(C) 6250 |
SEALED EXPANSION JOINT | 66 | LF |
$350.00 |
$335.00 |
$383.52 |
$366.00 |
| 18 | 504(E) 6190 |
42" F-SHAPED PARAPET | 415 | LF |
$170.00 |
$122.00 |
$114.63 |
$185.00 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 147.8 | CY |
$1,200.00 |
$1,165.00 |
$1,157.16 |
$1,050.00 |
| 20 | 511 6306 |
MECHANICAL SPLICES | 713 | EA |
$30.00 |
$37.00 |
$33.96 |
$39.00 |
| 21 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 44,890 | LB |
$1.30 |
$1.17 |
$1.40 |
$1.90 |
| 22 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$20,000.00 |
$19,000.00 |
$20,714.40 |
$21,750.00 |
| 23 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$3,750.00 |
$3,940.00 |
| 24 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 5 | SY |
$350.00 |
$502.70 |
$987.60 |
$576.00 |
| 25 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 5 | SY |
$700.00 |
$983.40 |
$987.60 |
$1,130.00 |
| 26 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 461 | SY |
$5.00 |
$4.00 |
$4.20 |
$4.20 |
| 27 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 5 | SY |
$900.00 |
$913.00 |
$996.00 |
$1,050.00 |
| 28 | 523(A) 6550 |
SEALER CRACK PREPARATION | 167.5 | LF |
$5.00 |
$4.40 |
$4.80 |
$4.80 |
| 29 | 523(B) 6560 |
SEALER RESIN | 2 | GAL |
$150.00 |
$165.00 |
$120.00 |
$120.00 |
| 30 | 540 4505 |
(PL)REPAIR BRIDGE ITEMS | 2 | EA |
$5,000.00 |
$3,216.00 |
$3,216.00 |
$3,380.00 |
| 31 | 545 4805 |
(PL)REPLACE BRIDGE ITEMS | 8 | EA |
$200.00 |
$30.00 |
$25.20 |
$26.50 |
| 32 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 110 | TON |
$90.00 |
$53.76 |
$58.51 |
$67.50 |
| 33 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$100,000.00 |
$115,000.00 |
$144,000.00 |
$115,600.00 |
| 34 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 1,502 | LF |
$1.00 |
$2.20 |
$2.30 |
$2.40 |
| 35 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 120 | SD |
$200.00 |
$165.00 |
$172.50 |
$180.00 |
| 36 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 3,413 | LF |
$1.00 |
$1.15 |
$1.15 |
$1.20 |
| 37 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$15.00 |
$12.00 |
$11.50 |
$12.00 |
| 38 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 900 | LF |
$35.00 |
$29.90 |
$29.90 |
$31.00 |
| 39 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 750 | LF |
$5.00 |
$6.00 |
$3.45 |
$3.60 |
| 40 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,950.00 |
$15,000.00 |
$13,800.00 |
$14,400.00 |
| 41 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 240 | SD |
$20.00 |
$22.00 |
$23.00 |
$24.00 |
| 42 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$8,000.00 |
$7,500.00 |
$7,500.00 |
| 43 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$59,900.00 |
$68,682.44 |
$143,100.00 |