Bid tab 140232

Let Jul 24, 2014 · Division 7 · Carter Sign up free

‹ Jul 2014 results

BRIDGE REHABILITATION US-177: OVER KEMP CREEK, 1.5 MILES SOUTH OF SH-53.

Let date
Thursday, July 24, 2014
Contract
140232
J/P numbers
29582(04)
District
Division 7
County
Carter
Highway
Limits
BRIDGE REHABILITATION US-177: OVER KEMP CREEK, 1.5 MILES SOUTH OF SH-53.
Project number
SSP-210B(014)SS

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,061,647
1 B & B CONSTRUCTION SERVICE J.T., INC. Low bidder $1,132,450 +6.7%
2 K & R BUILDERS, INC. $1,142,207 +7.6% +0.9%
3 BRIDGECO CONTRACTORS, INC. $1,206,741 +13.7% +6.6%

Bid tab: unit prices 47 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 B & B CONSTRUCT…#2 K & R BUILDERS,…#3 BRIDGECO CONTRA…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $22,000.00 $12,500.00 $18,000.00
2202(D) 0184 UNCLASSIFIED BORROW990CY $15.00 $14.00 $18.00 $20.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $6,500.00 $7,750.00 $5,000.00
4221(C) 2801 TEMPORARY SILT FENCE1,132LF $5.00 $2.00 $2.50 $2.00
5221(F) 0100 TEMPORARY SILT DIKE20LF $20.00 $11.00 $25.00 $10.00
6230(A) 2806 SOLID SLAB SODDING2,270SY $5.00 $2.00 $6.60 $3.30
7230(F) 2812 WATERING181KGAL $10.00 $11.50 $12.00 $11.00
8234(A) 2824 FERTILIZING (10-20-10)0.23TON $1,500.00 $1,500.00 $1,000.00 $1,700.00
9303(A) 2100 AGGREGATE BASE TYPE A216CY $80.00 $126.00 $134.00 $80.00
10408 5774 PRIME COAT280GAL $10.00 $8.00 $6.00 $10.50
11411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)278TON $150.00 $125.00 $137.50 $162.00
12411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)311TON $150.00 $132.25 $143.75 $177.00
13412 5267 COLD MILLING PAVEMENT1,145SY $15.00 $15.00 $22.00 $10.50
14509(D) 0325 CLASS C CONCRETE6.6CY $400.00 $700.00 $725.00 $510.00
15619(B) 4780 REMOVAL OF GUARDRAIL660LF $5.00 $3.00 $5.50 $4.00
16623 0100 (PL)GUARDRAIL CURBING4EA $750.00 $1,500.00 $1,575.00 $1,500.00
17623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE300LF $25.00 $19.20 $20.00 $17.49
18623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $3,000.00 $2,640.00 $2,520.00 $2,420.00
19623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,500.00 $2,600.00 $2,010.00 $2,350.00
20501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON1,000CY $15.00 $25.00 $22.00 $33.00
21504(A) 1304 APPROACH SLAB174SY $250.00 $292.37 $295.00 $280.00
22504(B) 1305 SAW-CUT GROOVING581SY $5.00 $7.50 $6.00 $4.40
23504(C) 6250 SEALED EXPANSION JOINT40.2LF $350.00 $280.00 $335.00 $465.00
24504(D) 6245 CONCRETE RAIL (TR4)282.6LF $100.00 $172.32 $112.50 $105.00
25506(A) 1322 STRUCTURAL STEEL74,640LB $3.00 $2.65 $2.50 $2.70
26507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY12EA $2,000.00 $1,500.00 $1,700.00 $880.00
27507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY24EA $2,000.00 $1,620.00 $1,700.00 $880.00
28509(A) 1326 CLASS AA CONCRETE118CY $850.00 $993.22 $975.00 $1,100.00
29509(B) 1328 CLASS A CONCRETE17.2CY $800.00 $3,025.00 $4,500.00 $1,100.00
30511 6306 MECHANICAL SPLICES254EA $30.00 $24.00 $30.00 $45.00
31511(B) 6010 EPOXY COATED REINFORCING STEEL26,160LB $1.30 $1.46 $1.23 $1.75
32515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)324SY $5.00 $3.50 $7.50 $4.00
33520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER28LF $50.00 $35.94 $96.00 $150.00
34520(C) 6060 EPOXY RESIN, ABOVE WATER3GAL $150.00 $100.00 $150.00 $1,200.00
35521(A) 6210 PNEUMATICALLY PLACED MORTAR8.2SY $850.00 $915.00 $1,281.60 $1,600.00
36523(A) 6550 SEALER CRACK PREPARATION140.5LF $5.00 $2.50 $7.00 $4.40
37523(B) 6560 SEALER RESIN3GAL $150.00 $75.00 $240.00 $200.00
38619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $80,000.00 $86,000.00 $105,000.00 $150,000.00
39823 8478 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM300SD $200.00 $90.00 $5.00 $71.50
40853 9033 DELINEATORS(TYPE 2, CODE 1)40EA $22.00 $7.00 $24.00 $6.16
41855(A) 8840 TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE)1,546LF $1.00 $2.00 $1.62 $1.51
42871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.300SD $15.00 $11.50 $7.50 $11.00
43877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER1,075LF $35.00 $28.18 $37.00 $27.00
44877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER1,075LF $10.00 $2.60 $6.00 $5.00
45880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $4,950.00 $45,000.00 $37,500.00 $31,000.00
46642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $7,000.00 $14,000.00 $8,000.00 $9,000.00
47641 1399 MOBILIZATION1LSUM $74,000.00 $88,000.00 $82,000.00 $136,000.00